On the other hand though, summer weather would probably make the repair easier.While the lead up to Christmas isn't ideal, I bet transport Scotland are relieved it's not the middle of the summer tourist season.
On the other hand though, summer weather would probably make the repair easier.While the lead up to Christmas isn't ideal, I bet transport Scotland are relieved it's not the middle of the summer tourist season.
If paths are run out of, will passenger trains get priority over freight trains?
Just heard on the news that the Forth Road Bridge will be totally closed tomorrow. While it's only just been announced, is there any chance of extra carriages on the Fife Circle tomorrow? Despite traffic being allowed across the bridge today, I can imagine services will be even busier tomorrow. I heard the trains were packed earlier with people getting left at stations etc. I know Scotrail are pretty short on units, but surely the loco hauled set could do a few extra runs at short notice?
If not, there are going to be many unhappy customers!
That's not entirely true. While there isn't spare stock sitting idle in sidings ready to be pressed into use a moment's notice, given a few days it is possible to juggle services and defer maintenance to be able to strengthen services for short time demands. Look at how extra services have been provided for sporting events (World Cup, Commonwealth Games, etc.) There is a certain amount of robbing Peter to pay Paul but it can be done.The modern railway system has almost no spare stock or capacity (at least according to the operators and/or regulators), so it's virtually certain nothing will be done. Such is the brilliance of "efficiency" leading to a lack of any spare anything!
The modern railway system has almost no spare stock or capacity (at least according to the operators and/or regulators), so it's virtually certain nothing will be done. Such is the brilliance of "efficiency" leading to a lack of any spare anything!
Never had the joys of the Aberdeen to Lerwick crossing in December, I take it?![]()

Given the difficulty of the situation I think its clear that some provision will be made even if it means taking some stock from elsewhere in Scotland and maybe the rest of the UK.
According to WNXX an HST was planned to work an Edinburgh - Kirkcaldy shuttle service today, but due to other disruption by the weather a Voyager is being used instead.
I was hesitant because I've not used that service before, but it felt similar in loading until Inverkeithing, comparing with other southbound morning services from Aberdeen (for instance the 0952).
That's not entirely true. While there isn't spare stock sitting idle in sidings ready to be pressed into use a moment's notice, given a few days it is possible to juggle services and defer maintenance to be able to strengthen services for short time demands. Look at how extra services have been provided for sporting events (World Cup, Commonwealth Games, etc.) There is a certain amount of robbing Peter to pay Paul but it can be done.
The rail union RMT has warned today that the closure of the Forth Road Bridge has exposed the chronic lack of ScotRail rolling stock.
The union said today (Friday) that the enforced and sudden closure of the bridge has exposed a severe shortage of capacity on ScotRail with the company now advising people not to travel on its services as it is already rammed out to capacity as travellers seek to find alternative ways to complete their journey.
The problem is now expected to last for weeks.
Mick Cash, RMT General Secretary, said: The sudden and enforced closure of the Forth Bridge has seriously exposed the chronic lack of spare rolling stock and capacity on ScotRail with the company now advising people not to use their services and to stay at home.
It is a ludicrous state of affairs when the main rail service is tipped into complete meltdown because of passengers seeking an alternative way of completing their journey.
This situation calls for an immediate review of the capacity and fleet stock on ScotRail so that passengers are not confronted with this kind of chaotic situation in the future.
Read more: http://www.fifetoday.co.uk/news/rai...h-road-bridge-closure-1-3966604#ixzz3tScsH3sX
Has this been postage?
I know, I was simply using it as an example of where shuffling services can help with short-term pinch points. Now that we know it is likely to be weeks before the bridge is open there may be DMUs running under wires that can be borrowed from other operators for a few weeks if Scotrail is willing to give up a few EMUs. Of course, money would need to change hands, but given the potential impact on the Scottish economy it shouldn't be dismissed out of hand.Of course, for the Commonwealth Games, it was EMUs. WHich had (have?) plenty of capacity to provide extra services. Sending one of them over the Forth Bridge won't really help matters.
I know, I was simply using it as an example of where shuffling services can help with short-term pinch points. Now that we know it is likely to be weeks before the bridge is open there may be DMUs running under wires that can be borrowed from other operators for a few weeks if Scotrail is willing to give up a few EMUs. Of course, money would need to change hands, but given the potential impact on the Scottish economy it shouldn't be dismissed out of hand.
I don't know, that's why I said 'may' - are all of the routes that Northern got 319s for fully electric operated now?Where are the DMUs running under the wires for their whole journeys ?
Where are the DMUs running under the wires for their whole journeys ?
If you're going to bustitute something, would the Far North make sense given that the road journey is quicker?
Having a glut of standby trains is simply not going to happen any time soon.
It would be brilliant to have a stock of standby trains, perhaps stored somewhere central like Birmingham, that could be ready to move at short notice to cover for issues like this, to replace broken down trains, and to cover for large events. I reckon that between these, they'd be kept reasonably busy.
Sadly, we haven't even had enough DMUs built to replace the pacers (which at this rate are probably going to be the backbone of the "Northern Powerhouse"). Having a glut of standby trains is simply not going to happen any time soon.
There's now talk of a ferry. Unsure whether a passenger or vehicle vessel, but CalMac have a couple of 18 car ferries sitting around doing little
That would require a linkspan.
That would require a linkspan.
How could you really have standby trains with all the overcrowding we have. Even the fact they may be there and not doing anything for much of the time they would still cost money.
How could you really have standby trains with all the overcrowding we have. Even the fact they may be there and not doing anything for much of the time they would still cost money.
If you're going to bustitute something, would the Far North make sense given that the road journey is quicker?
While the lead up to Christmas isn't ideal, I bet transport Scotland are relieved it's not the middle of the summer tourist season.
The modern railway system has almost no spare stock or capacity (at least according to the operators and/or regulators), so it's virtually certain nothing will be done. Such is the brilliance of "efficiency" leading to a lack of any spare anything!
Of course, for the Commonwealth Games, it was EMUs. WHich had (have?) plenty of capacity to provide extra services. Sending one of them over the Forth Bridge won't really help matters
Seriously exposes the crap that Mick Cash comes out with if you ask me, of course the closure of such a major road bridge happens frequently and the railway should have loads of spare trains handy for such a situation!
How could you really have standby trains with all the overcrowding we have. Even the fact they may be there and not doing anything for much of the time they would still cost money.
All the small Calmac ferries are shallow draft and work from slipways, not linkspans