However, you'll realistically only get a small number of cars across on these (less than 100/hour)
Has this been postage?
The rail union RMT has warned today that the closure of the Forth Road Bridge has exposed the chronic lack of ScotRail rolling stock.
The union said today (Friday) that the enforced and sudden closure of the bridge has exposed a severe shortage of capacity on ScotRail with the company now advising people not to travel on its services as it is already rammed out to capacity as travellers seek to find alternative ways to complete their journey.
The problem is now expected to last for weeks.
Mick Cash, RMT General Secretary, said: The sudden and enforced closure of the Forth Bridge has seriously exposed the chronic lack of spare rolling stock and capacity on ScotRail with the company now advising people not to use their services and to stay at home.
It is a ludicrous state of affairs when the main rail service is tipped into complete meltdown because of passengers seeking an alternative way of completing their journey.
This situation calls for an immediate review of the capacity and fleet stock on ScotRail so that passengers are not confronted with this kind of chaotic situation in the future.
Read more: http://www.fifetoday.co.uk/news/rail...#ixzz3tScsH3sX
According to WNXX an HST was planned to work an Edinburgh - Kirkcaldy shuttle service today, but due to other disruption by the weather a Voyager is being used instead.
)Following the assessment of the suspended span truss, these critical structural members were found to be significantly overstressed during certain combinations of loading.
However, given the cost and difficulty in replacing these elements, and the potential disruption to bridge users, further examination of the probability of certain combinations of load occurring and further structural analysis was carried out to try to determine the most realistic levels of stress in the members.
After the Forth Replacement Crossing opens, the existing bridge will carry only light traffic under normal operating conditions. One factor to be considered is the reduced probability of certain conditions of traffic loading occurring within the relatively short time period left until the new bridge opens.
As a result of this analysis work there is now the potential to upgrade the existing links rather than carry out a full replacement.
A repair option involving strengthening existing welds and adding stiffeners to the tower steelwork has been developed and a trial is being carried out on the south west tower leg. If successful, then this repair will be carried out on the other three tower legs.
The cost of carrying out the repair option to all the links, over years 2013 to 2015, is estimated to be £0.435 million. Strengthening the links will cost significantly less than full replacement which has an estimated cost of £10 million.
If the trial is not successful then the full replacement scheme would have to be reconsidered after the dissolution of the Authority in 2015.
That *is* interesting. If I'm reading it correctly they ran the numbers, came to the conclusion that "it'll be fine until the new bridge opens" but got it wrong.Nothing to do with the railway, but of interest to engineers on here I think.
This appears to relate to a report on another forum of a public contract, cancelled in 2010, to strengthen the end links. Interesting what a wee bit googling can unearth.
That is a lot less damning then - it would have been a major embarrassment if the specific failure had been predicted.A bit more googling finds Transport Scotland were asked about this yesterday and stated that it was not the same components which have now failed.
If the DfT ever decided to buy a limited fleet of emergency standby trains, which isn't actually a ridiculous idea, they'd need to be usable on the whole network and drivers would need to be able to use them. So they'd not be cheap.Indeed. If there was a "strategic reserve" sitting in a siding somewhere the Daily Mail would go ballistic every time somebody stood on a train!
If the DfT ever decided to buy a limited fleet of emergency standby trains, which isn't actually a ridiculous idea, they'd need to be usable on the whole network and drivers would need to be able to use them. So they'd not be cheap.
And, yes, the media would go mad as well as demanding to know why they weren't put into regular service, when suddenly they'd no longer be available for emergency situations like this!
Also, given their likely use to cover for large events, a crisis like this or another situation requiring the movement of large numbers, I'd suspect the interior layout would mean few, if any, seats.
I'd have thought it would be a better plan to have them for foot passengers only.
Having shuttle buses wouldn't be particularly difficult on the South Queensferry side, as there's a nice big car park, but North Queensferry would be a bit trickier.
Actually, in the "bad old days" of BR and Inter-City, there was indeed a number of standby trains. It was known as the "Directors Reserve", latterly some rakes of older Mk 2 stock commonly kept at Euston etc, which were able to be sent as required by the Director of Inter-City. They weren't used every day but they dealt over time with a wide range of traffic surges, disruptions, etc.If the DfT ever decided to buy a limited fleet of emergency standby trains, which isn't actually a ridiculous idea, they'd need to be usable on the whole network and drivers would need to be able to use them.
http://www.theguardian.com/uk-news/...e-of-scottish-steel-industry?CMP=share_btn_tw
The Guardian's take on the incident, which seems to be the 'revenge' of the Scottish Steel industry.
Travelled from Inverkeithing to Edinburgh yesterday on a VTEC HST which was rammed. Looks like there might be something happening with loco haulage - as there were 4 class 67s and 2 ex Virgin Trains mark 2 coaches stabled at Waverley yesterday. Those and the class 90 for the sleeper made it a bit of a loco fest!
What I can't understand is why the bridge has to be closed completely. If the bridge is in such poor condition that it could fall down at any moment then those responsible should be held to account. Could you not just impose some sort of traffic control so that only a certain number of vehicles are allowed on the bridge at any one time to reduce stresses? Or even just open it one way? I went over an old bridge in New Zealand (may well have been an old rail one) & only two trucks were allowed on at any time. I remember a similar one in Canada too.
What I can't understand is why the bridge has to be closed completely. If the bridge is in such poor condition that it could fall down at any moment then those responsible should be held to account. Could you not just impose some sort of traffic control so that only a certain number of vehicles are allowed on the bridge at any one time to reduce stresses? Or even just open it one way? I went over an old bridge in New Zealand (may well have been an old rail one) & only two trucks were allowed on at any time. I remember a similar one in Canada too.
I think the ex VT Mk2s are for the Fort William portion of the Sleeper.
http://www.theguardian.com/uk-news/...e-of-scottish-steel-industry?CMP=share_btn_tw
The Guardian's take on the incident, which seems to be the 'revenge' of the Scottish Steel industry.
http://www.theguardian.com/uk-news/...e-of-scottish-steel-industry?CMP=share_btn_tw
The Guardian's take on the incident, which seems to be the 'revenge' of the Scottish Steel industry.
These extra trains will show in online systems later today (Sunday). In the meantime, here's a summary:
Southbound
Inverkeithing - Haymarket: 0708, 0840, 0931, 1249, 1602, 1649, 1729, 1906
Cowdenbeath - Dunfermline Town - Inverkeithing - Haymarket: 0750, 1504
Dunfermline Town - Inverkeithing - Haymarket: 1000, 1046, 1200, 1402, 1839
Cowdenbeath - Dunfermline Town - Haymarket: 1335
Cowdenbeath - Inverkeithing - Edinburgh: 1707
Cowdenbeath - Inverkeithing - Haymarket: 1739
Cowdenbeath - Kirkcaldy - Burntisland - Aberdour - Dalgety Bay - Inverkeithing - Haymarket: 1739
Kirkcaldy - Kinghorn - Burntisland - Aberdour - Dalgety Bay - Inverkeithing - North Queensferry - Haymarket - Edinburgh: 0759
Dundee - Leuchars - Kirkcaldy - Inverkeithing, Haymarket - Edinburgh: 1850
Northbound
Edinburgh - Haymarket - Inverkeithing - Kirkcaldy - Leuchars - Dundee: 0538
Haymarket - Inverkeithing: 0746, 0854, 1211, 1450, 1617, 1641, 1653
Haymarket - Inverkeithing - Dunfermline Town: 0918, 1012, 1047, 1121, 1320, 1809
Haymarket - Dunfermline Town - Cowdenbeath: 1249
Haymarket - Inverkeithing, Dunfermline Town - Cowdenbeath: 1418
Haymarket - Inverkeithing - Kirkcaldy - Markinch - Ladybank - Cupar - Dundee: 1653
Presumably down to 1tph. Should manage OK - the line is lightly loaded with plenty of alternative options.Anniesland Glasgow Queen St High Level: REDUCED SERVICE
No great loss. 2tph already run as EMUs to Queen Street Low Level. They should cope with the additional strain quite easily. Journey time extension will be negligible.Falkirk Grahamston Glasgow Queen Street via Cumbernauld CANCELLED (replacement buses to/from Cumbernauld)
A no-brainer. Presumably, this path will be filled in by a Haymarket terminator.Glasgow Kirkcaldy/Markinch (one a day in each direction): CANCELLED
Could cause some problems, its busy up that way. It'll be interesting to see what services are going to be cancelled. Still, I'm sure the existing stock will cope, but it will be busy.Glasgow Dundee: Two services CANCELLED
I would hope that people would be checking timetables and considering earlier trains anyway, so this shouldn't be much of a problem.Plus minor timing changes / amended station calls: Dundee Edinburgh / Edinburgh Glenrothes. Note: some departures are EARLIER
Splitting hairs, but that's an Observer columnist, Kevin McKenna, who always tries to find the worst and is on constant attack mode against the Scottish Government - he always opposed devolution.
Agreed they have done a good job. It's interesting on a personal level because I passed through Haymarket earlier today and thought 'I must start a thread about if there's a point to Platform 0' - turns out there is. Also explains why there were so many 156s at Haymarket TMD, I counted five or six.Note that almost all services start and terminate at Haymarket. I suspect that Platform 0 will get a lot of use over the next few weeks. It's actually a pretty decent effort to supplement services at short notice.
The failure wasn't predicted and I can't fault the engineers here, they're working with a bridge that's 51 years old, carrying traffic well in excess of its design, traffic which individually is well in excess of that modeled, both heavier cars and far heavier goods vehicles.
Modelling is great but without experience, nobody can program computer modelling packages to accurately model for this sort of problem - they can get very close (and that'll be what has prompted the inspection in this area) but won't be 100% accurate.