When the Dalmeny/Almond Chord gets built and electrified, would there be a case for wiring up to Dalmeny as well? A small length of run-off wiring would be needed at either end of the new chord anyway, and as far as I can tell there are no major structures in the way. The point of this would be to wire up the sidings at Dalmeny yard so that they could be used to stable or turn back electric trains. For instance, you could extend the peak ECML stopper so that it starts at Edinburgh Gateway rather than having to shunt at Haymarket like it does today. The alternative would be to turnback and shunt trains on the chord itself, which might not be a great idea depending upon the number of trains that will be running on it.