The only difficult structure between Markinch and Dundee is the Tay Bridge. It's not a World Heritage Site so it will be much easier to implement a solution than for the Forth Bridge.
It is still listed though.
The only difficult structure between Markinch and Dundee is the Tay Bridge. It's not a World Heritage Site so it will be much easier to implement a solution than for the Forth Bridge.
Is there any news of what is next to be electrified post-2020? If not, when are we likely to find out?
I'm interested in the Fife Circle, which the OP has down as an unlikely 2024! Can the Forth Bridge even be electrified, and how much work would it be to fix the Kinghorn tunnel? Does the Halbeath bypass affect things if it gets the go ahead?
Sorry for all the questions :P
We'll know in June when the HLOS is published. Strong contenders are East Kilbride, Barrhead, Maryhill and Edinburgh South Sub.
They are almost certainly going to get electrified. Both the Forth Bridge and various tunnels (IIRC, the tunnel immediately north of the bridge is fairly tight too) are going to be significant challenges for the work, hence the last proposal I heard included at least one or two control periods of design work for the tricky parts of the route, so we're likely talking mid-CP7 or CP8 before the Fife Circle gets electrified. And Markinch to Dundee may well wait a few more years after that.
The only difficult structure between Markinch and Dundee is the Tay Bridge. It's not a World Heritage Site so it will be much easier to implement a solution than for the Forth Bridge.
Indeed it is. But listed structures are a lot easier to modify than World Heritage Sites. Given some of the things that Dundee City Council have allowed to happen, I can't see them objecting too strongly as long as the design is even slightly sympathetic.It is still listed though.
Is there any news of what is next to be electrified post-2020? If not, when are we likely to find out?
I'm interested in the Fife Circle, which the OP has down as an unlikely 2024! Can the Forth Bridge even be electrified, and how much work would it be to fix the Kinghorn tunnel? Does the Halbeath bypass affect things if it gets the go ahead?
Sorry for all the questions :P
We'll know in June when the HLOS is published. Strong contenders are East Kilbride, Barrhead, Maryhill and Edinburgh South Sub.
What is to be gained by electrifying the Edinburgh South Sub?
What is to be gained by electrifying the Edinburgh South Sub?
Edinburgh Suburban Line Enhancement Programme
Summary
Remodelling of Portobello, Slateford and Niddrie West single lead junctions, upgrade of the signalling capacity, enhancement of the Millerhill through route capabilities (from Monktonhall Junction) in addition to electrification.
Benefits
This package of enhancements will provide a robust and fit for purpose link between the East Coast Main Line and the West Coast Main line. It will accommodate forecast electric freight paths (avoiding Edinburgh Waverley), provide appropriate electric diversionary routes for Anglo Scottish and local services (to Dunbar/North Berwick and between Edinburgh and Glasgow via Falkirk High) and provide flexibility on the approaches to Edinburgh Waverley. Electrifying the existing line without further upgrades would provide an electrified link between the ECML and WCML for freight, but not the capacity for it to be used as a diversionary passenger route for ECML and WCML services running to /from Edinburgh Waverley.
This builds on the W12 gauge enhancement project and electrification of the Shotts line in CP5 and allows operators to divert electric rolling stock during planned disruption.
Thank you both. Interesting that use as a diversionary route seems to be given quite a lot of weight in this instance. Presumably there still has to be some sort of financial case for this route to be electrified.
Is it reasonable to conclude that diversionary potential can be built into the case for other electrification schemes?
According to the quarterly NR CP5 report, the major infrastructure works on the suburban line (two major road bridges) have been completed, and essentially it is ready to be electrified. The reasons why it is essential are exactly as other posters have said: it is essential that electric trains are able to go round and enter Waverley from the wrong end.
It'd be a big hit for those who commute to North Berwick and Dunbar if trains from Waverley ran through Haymarket and out via the South Suburban Line. It also gives far better flexibility when it comes to platform availability as many a time trains are often sitting in the tunnel at the East side of Waverley waiting for a platform to become available.
Surely that would add significant time to the Edinburgh to North Berwick/Dunbar commute.
..or reduce the number of people getting on already crowded Edinburgh services at Haymarket, and crowding the station - and also freeing up platforms for borders services (and vice versa with North Berwick/Dunbar services)
I don't understand what you are trying to say here.
According to the quarterly NR CP5 report, the major infrastructure works on the suburban line (two major road bridges) have been completed, and essentially it is ready to be electrified. The reasons why it is essential are exactly as other posters have said: it is essential that electric trains are able to go round and enter Waverley from the wrong end.
I'm saying that Haymarket has a lot of passengers who commute to stations to North Berwick, and that when the south suburban line is electrified it could maybe give Scotrail an opportunity to call at Haymarket to give a direct connection.
I seem to remember that there were through services from North Berwick to Haymarket a decade or two back. I do not know whether it fell victim to economics or layout constraints. Either way it is difficult to picture how a meander round the South Sub could improve the lot of East Lothian commuters.
Can you link to this report, please? I tried looking for it on NR's website, but couldn't find it.
It's called the enhancements delivery plan. Another poster gave the link on a different thread. Covers the whole of the UK.
If you can't find I will try to remember in which thread it was posted
The diversionary route case for the South Suburban is particularly strong because there are works required in the near future that will require that diversionary capability. It's like how the connection line at Anniesland was justified for the Queen Street HL tunnel closure period, even though there is no obvious future use for any of it. The works planned east of Edinburgh are of comparable scale and difficulty as they're going to redouble one of the Calton tunnels as well as doing some pretty major remodelling works. If the diversionary capability isn't available via the South Sub all of the many ECML electric-only trains will have a bit of a problem.
Even without that there's a strong case for these works on the basis that the new Hitachi Millerhill depot is on the eastern side of Edinburgh and is absolutely essential for the entire EGIP electrified service. If there's no electrified diversionary route then any minor disruption will totally destroy the rail network. A very significant proportion of the total passenger kilometres carried by ScotRail are switching to pure electric traction and the diesels previously used are going elsewhere, so it's electric or nothing. Depot access considerations are not 'sexy' issues but it's absolutely vital for the good functioning of the rail service.
There have been a few ideas to electrify the Edinburgh Sub. The original plan was Freight Spine. Then there was new passenger services and lastly the link to Millerhill for emus. Only that one remains active. So maybe Hitachi should pay for it.