Scotrail84
On Moderation
- Joined
- 5 Jul 2010
- Messages
- 2,977
Did nobody read my post? There will be several additional loco hauled services each day starting and terminating at Haymarket platform 0. Top and tailed 67s and 4 coaches.
In addition to the two Class 68 sets?Did nobody read my post? There will be several additional loco hauled services each day starting and terminating at Haymarket platform 0. Top and tailed 67s and 4 coaches.
In addition to the two Class 68 sets?
Great thanks, any ideas which services the 67s are planned to work?Yes, that is my understanding. These coaches have come from somewhere down south and are receiving a deep clean and safety checks before being brought into service. I was told these will be operating from Wednesday onwards. This in turn will free up dmus to strengthen other areas such as tweedbank.
Great thanks, any ideas which services the 67s are planned to work?
Top 'n' tail 68s ufn are expected to work the following diagram
2K18 07:35 Cardenden - Haymarket 08:33
1Z05 08:54 Haymarket to Inverkeithing 09:14
1Z08 09:31 Inverkeithing to Haymarket 09:51
1Z09 10:12 Haymarket to Dunfermline Town 10:37
1Z12 10:46 Dunfermline Town to Haymarket 11:13
1Z13 11:21 Haymarket to Dunfermline Town 11:46
1Z14 12:00 Dunfermline Town to Haymarket 12:26
1Z15 12:49 Haymarket to Cowdenbeath 13:27
1Z18 13:35 Cowdenbeath to Haymarket 14:10
1Z23 14:23 Haymarket to Cowdenbeath 14:56
1Z22 15:04 Cowdenbeath to Haymarket 15:39
1Z19 16:17 Haymarket to Inverkeithing 16:32
1Z26 16:49 Inverkeithing to Haymarket 17:08
2G13 17:12 Haymarket to Glenrothes 18:13
18:15 Glenrothes - Edinburgh 19:31
68006 & 68007 are on the above today
68002 is allox 2K01/2G02/2L69
Great!. Well done Scotrail.
Sam
Congratulations from me too.
It's feeling just like the old days, lots of criticism and predictions of failure (even from people on here) when in reality "the railway" actually comes up trumps and makes a pretty good job given what we know about available resources. Mind you, if it had been somewhere away from the capital in England or Scotland I wonder whether the response would have been as good.
A
How long will the staff be willing to put in the overtime required to keep the extra services running, for example?
It's a matter of national importance. Most of the country is somehow affected by the closure of the bridge, obviously some areas moreso than others. It's also Christmas - a time when people are looking for overtime work to help fund the "perfect Christmas".
Combine these two things, and you'll have a situation where you've got potentially lots of drivers looking for work, and lots of managers/"higher ups" who are being pressurised to deliver these extra services. I'm sure there'd be the potential to increase overtime wages if the staff weren't biting.
As long as the work is completed by the New Year estimate (which it seems to be), then I'm sure that people will manage.
Anyway, how are things working out today? Are the extra services sufficient for demand? How many existing services have been lengthened? Any surprises that we weren't expecting? Has there been any further reduction in train lengths elsewhere?
It may be 'a matter of national importance' but if people find themselves working on rest days week after week, with no end in sight, then I'm afraid their enthusiasm is likely to wane rapidly, however much they are paid for the overtime/pressure is applied. And the 'perfect' Christmas/New Year also involves people being able to take time off from work.
Or perhaps they might have a more positive outlook than you appear to do in your posts, and understand that they are making a very real difference to their communities.
I do wish you just sometimes could actually be more positive in your posts - you seem perpetually to be in an indignant mode, and frankly it's beginning to wear a bit thin. Not everyone is as negative in their outlook as your posts suggest.
Extra train from tomorrow,
Inverkeithing - Edinburgh Waverley: 0552
I do wonder why there is not a train at that time in the first place. Even Stagecoach runs buses at that time of the morning.
I take it, this will longer go ahead? https://www.scotrail.co.uk/sites/default/files/assets/download_ct/sr1512_edinburgh_fife.pdf
It's a matter of national importance. Most of the country is somehow affected by the closure of the bridge, obviously some areas moreso than others. It's also Christmas - a time when people are looking for overtime work to help fund the "perfect Christmas".
Combine these two things, and you'll have a situation where you've got potentially lots of drivers looking for work, and lots of managers/"higher ups" who are being pressurised to deliver these extra services. I'm sure there'd be the potential to increase overtime wages if the staff weren't biting.
As long as the work is completed by the New Year estimate (which it seems to be), then I'm sure that people will manage.
Anyway, how are things working out today? Are the extra services sufficient for demand? How many existing services have been lengthened? Any surprises that we weren't expecting? Has there been any further reduction in train lengths elsewhere?
It may be a matter of 'national importance' but you'll not get any drivers working rest days in ScotRail apart from a Saturday. There is no rest day agreement Monday - Friday in place as Scotrail very recently stated they don't require rdw. They will have to get round the negotiating table with Aslef if they want it. And it will cost them to get it in place.
Quite amusing to see tweets that trains should run Boxing Day simply because the FRB is closed :roll:
It may be 'a matter of national importance' but if people find themselves working on rest days week after week, with no end in sight, then I'm afraid their enthusiasm is likely to wane rapidly, however much they are paid for the overtime/pressure is applied. And the 'perfect' Christmas/New Year also involves people being able to take time off from work.
It may be a matter of 'national importance' but you'll not get any drivers working rest days in ScotRail apart from a Saturday. There is no rest day agreement Monday - Friday in place as Scotrail very recently stated they don't require rdw. They will have to get round the negotiating table with Aslef if they want it. And it will cost them to get it in place.
Quite amusing to see tweets that trains should run Boxing Day simply because the FRB is closed :roll:
I think there are only actually 4 extra diagrams involved (rough guess from additional train times on scotrail website) and 2 of those will presumably be operated by drivers from the loco's own operating company.
However, I'm sure the overtime chequebook will be available to fill any shortages and a lot of Scotrail staff will be having nice holidays next year. We should be grateful to all workers rail/police/bridge repairmen who're no doubt working long shifts and indeed everyone else who has to leave home an hour earlier to get to work without overtime pay.
Why not? If there's demand for it, even an Inverkeithing-Haymarket shuttle would be worthwhile. This is where getting the staff onboard would be more difficult, but I would expect that discussions may be happening about service over the festive period (even though it may not come to anything).

Perhaps we could stick to the Forth road bridge rather than the annual 'Trains should/should't run on Boxing Day' argument?
Thank you![]()
Drivers aren't really an issue, it's engineering staff at Haymarket TMD that will be needed. If availability and reliability of the stock can be improved, more carriages can be put into service, running in multiple.
Passengers at Invekeithing were apparently unable to board the first two trains to Edinburgh this morning as they were already full with passengers from further north. Long queues at the road bridges further west and lots of complaints about cars being banned from the A985 as part of attempts to segregate them from buses and lorries.
I agree entirely, my reply mentioning drivers was to 380101 (and as in any group of employees I suspect a few of them will happily take the money anyway) fitters will probably be more important (and presumably overtime will be similarly available), I wonder if any Northern Rail (Abellio) staff fancy a month in a hotel in Edinburgh with copious overtime, given they're experts in making the unserviceable, serviceable. Other than that there is a shortage of ticket selling staff and general marshalling of queues, but that should be possible to cover by putting managers/admin staff at Fife Circle stations from 6-9am with a portable ticket machine (surely can't take that long to train them to sell day returns) and contract security staff.