Nope, it is First:
https://www.bbc.co.uk/news/business-44312684
Thank you
Nope, it is First:
https://www.bbc.co.uk/news/business-44312684
So it's basically irrelevant and shouldn't affect their WCP bid then? (The article seems to suggest it will).
Stoke didn't have an announcer as such, platform staff did it between them. But some preferred it more than others!
Auto announcements now at Crewe too, so seems to be spreading.
I can't see the original article (I don't have a Times subscription, and it's only showing me a preview), but I would be surprised if it did. The most likely way for it to affect their bid was if the new CEO changed strategy when it came to rail.
Tim O'Toole getting the boot suggests that it is seen as pretty serious. SWR hasn't reached crunch point yet and GWR continues to experience very poor performance (not all their own fault), which looks unlikely to change for some time. Nor are their US problems over IMO. Judging by the share price, the City has experienced some level of panic.The main FirstGroup losses are on Greyhound in the US (a one-off restructuring cost of £277m), and £106m provision on TPE over the rest of the franchise.
GWR and SWR are making "solid contributions" to profits.
Tim O'Toole is being replaced as CEO.
Nothing to panic about overall.
As HS2 (High Speed 2) works are now getting under way in one form or another i thought it time to share my thoughts and what i would like to see on the initial opening of HS2 phase 1 to Birmingham Curzon Street and re-joining the WC (West Coast) just North of Lichfield.
At that time WCP (West Coast Partnership) should have the following rolling stoke to utilise.
Class 390 EMU x 56 (35 x 11 car & 21 x 9 car)
Class 221 DEMU x 20 (All 5 car)
Class ??? EMU x 54-60 (Classic compatible) 200 metre length.
Some sort of Hybrid traction may come along at some point to replace 221s which would make sense but time will tell.
Was just thinking of some sort of frequency ex London Euston in the Down direction(heading North) so there would be a similar frequency in the opposite direction varying by time of day.
Euston - Manchester Piccadilly 4 TPH (Trains per hour). 2 via HS2, 1 via Crewe & 1 via Stoke-on-Trent. 2 via WC, 1 via Crewe & 1 via Stoke, and beyond to Blackpool North via Bolton at certain times.
Euston - Birmingham 6 TPH. 3 via HS2 to Curzon St., 1 via HS2 to New St, 1 via WC to New St and beyond maybe to Shrewsbury/Chester.
Euston - Liverpool 2 TPH. 1 via HS2, 1 via WC.
Euston - Blackpool North. 6 TPD (Trains per day). 2 via HS2, 4 via WC, certain trains could be via Manchester & Bolton.
Euston - Edinburgh/Glasgow. 2 TPH. 1 via HS2, 1 via WC. Certain trains could go via Manchester, Bolton, Wigan North Western.
Euston- Shrewsbury. 1 TPH via WC. Could extend to Chester at certain times.
Euston - Chester/North Wales. 2 TPH, 2 via WC. Could still split at Chester for Wrexham/Shrewsbury & Bangor/Holyhead maybe Llandudno, alternating through the day at certain times.
Would there be a need for a North Wales to Scotland via Warrington Bank Quay service? Maybe, maybe not, would be interesting.
I realise it is early days but new Rolling stock needs to be in testing in 2024 and initial opening of HS2 phase 1 is end of 2026 and time does move on rather quickly at times and as others have said being new railway there is no reson to think it will be late!![]()
As i say these are just thoughts i've had on having a few beers on another hot day, i have no proper idea if the sums would add up.
Interesting times whether good or bad.
Euston- Shrewsbury. 1 TPH via WC. Could extend to Chester at certain times.
Euston - Chester/North Wales. 2 TPH, 2 via WC. Could still split at Chester for Wrexham/Shrewsbury & Bangor/Holyhead maybe Llandudno, alternating through the day at certain times.
Would there be a need for a North Wales to Scotland via Warrington Bank Quay service? Maybe, maybe not, would be interesting.
Shouldn't the talk around HS2 be stored in its special little cupboard away from the real stuff?
https://www.railforums.co.uk/forums/future-high-speed-rail.165/

All the Manchester HS2 trains are expected to go via Crewe.Euston - Manchester Piccadilly 4 TPH (Trains per hour). 2 via HS2, 1 via Crewe & 1 via Stoke-on-Trent. 2 via WC, 1 via Crewe & 1 via Stoke, and beyond to Blackpool North via Bolton at certain times.
No way of getting to New St from HS2 whatsoever.Euston - Birmingham 6 TPH. 3 via HS2 to Curzon St., 1 via HS2 to New St, 1 via WC to New St and beyond maybe to Shrewsbury/Chester.
2 via HS2 was the last planEuston - Liverpool 2 TPH. 1 via HS2, 1 via WC.
No HS2 trains will get to BlackpoolEuston - Blackpool North. 6 TPD (Trains per day). 2 via HS2, 4 via WC, certain trains could be via Manchester & Bolton.
Possibly, Liverpool to Scotland will get some sort of improvement I would imagine.Would there be a need for a North Wales to Scotland via Warrington Bank Quay service? Maybe, maybe not, would be interesting.
You won't be able to do that either, no connection at all at Washwood Heath.And there is no track connection planned between HS2 and NR in the Birmingham area, except by shunting through the depot, so you can't run to New Street via HS2.
Last I heard was Stoke is served by a Macclesfield HS2 terminator.Stoke will also be served on a loop to Crewe.
The Scotland trains are intended to run through Crewe as double sets, ultimately non-stop between London and wherever they split for Glasgow and Edinburgh but that may not be until Phase 2B. None of this is confirmed yet if I recall correctly the plan is for the Crewe splitters to be a Liverpool with a Preston and a second Liverpool which might just detach a set to return south. By doing this they reduce by one the number of paths further south, which makes room for an hourly train from London to Stafford, Stoke and Macclesfield. So there's scope to run the set that turns back at Crewe somewhere else, with Chester or beyond being the obvious candidate if it was electrified. No reason why the Preston working couldn't continue to Blackpool - perhaps there or Lancaster in alternate hours?It might not be until Crewe is reached by HS2 in 2027, but isn't the plan now to run 400m HS2 trains to Crewe and split for Liverpool/Scotland?
Stoke will also be served on a loop to Crewe.
Then there's the Birmingham-Manchester/Scotland services routed via HS2 to Crewe (impacting XC services).
I'm sure these will be phased, but WCP will have to work all this out with DfT, HS2 Ltd and NR.
The southern WCML will also want its benefits from more capacity for local/regional services (which will impact current LNWR services).
Through services to Chester/North Wales have never been included in HS2's plans, they are only interested in electric classic-compatible services.
Euston-Blackpool via Manchester/Bolton seems unlikely, given the constraints through the Oxford Road corridor (unless the station upgrades go ahead).
Things will be easier to understand when the WCP franchise is awarded.
That would require electrification of EWR or yet more bi-modes on a part of the network that doesn't really need them otherwise. There is also a need to provide for journeys between London and the non-HS2 stations north of MK so there will still be plenty of through trains between Euston and Rugby or beyond. I rather doubt there will be a through train between Manchester and MK because the three London-Manchester paths are replaced by three HS2 paths and unless digital railway achieves miracles there won't be capacity for anything more though Stockport. It would be possible after Phase 2B by taking a HS2 service from Manchester and changing at Crewe or either Birmingham station, but how it working in phases 1 or 2A depends on the West Coast franchise service pattern.There doesn't need to be much duplication of HS2 services on the WCML, even after adding many new stops. End-to-end passengers are going to use HS2. If you're an intermediate passenger, e.g. Manchester to Milton Keynes, then there's no reason your train has to go to Euston. You'd be better served by a train that then heads onto EWR down to Oxford and Reading. Meanwhile, the path from Milton Keynes to Euston can be used by a dedicated commuter service, even if on the same stopping pattern. EWR provides a fairly useful split location between London commuter and longer-distance regional and InterCity services after HS2 opens, and redirecting trains means opening up fast links which aren't available today (e.g. Northampton/Trent Valley to the GWML). A same-station interchange would be available at Milton Keynes and other EWR band stations onto the commuter trains which serve the smaller stops heading into London for the limited number of passengers interested in those journeys.
Until the WCP franchise is awarded and the diggers have moved in on the main line work, maybe.
After that, it becomes part of the real world.
It's a bit like the BBC News web site which has main headings for UK and World, but can't bring itself to have a category called Europe.![]()
That's the problem, Europe is considered just another part of the World (the Brexiteers view).
I think they would broadly want to keep the trains per hour the same and my suspicion would be that they would cut over one route in its entirety at a time. The HS2 services are so much quicker that if, for example, 2TPH to Manchester went via HS2 and 2TPH by the existing route then the latter would be of little interest to end-to-end passengers so the effective frequency would be less. Also there is unlikely to be capacity for extra trains at somewhere like Stockport where trains via either route would have to pass through. And there is no track connection planned between HS2 and NR in the Birmingham area, except by shunting through the depot, so you can't run to New Street via HS2.
My guess would be to start with 3TPH to Birmingham only, because they are fully contained on HS2 infrastructure so there is relatively little to go wrong while everyone gets used to things. There is no capacity conflict for Birmingham so the existing 3TPH could continue to run for a while and would be a useful fallback if it all goes wrong. Then the other routes would transfer, with the corresponding existing services replaced at the same time by whatever the new service pattern is on the existing route.
In my view it would be a good investment to spend very little ensuring there is a straight bit of track somewhere around Water Orton so that if needed in the future a flying junction onto the Derby line could be put in. That would allow HS2 sets to continue into New Street and on to Wolverhampton/Shrewsbury or (the big opportunity in my view) towards Bristol. But the big fat fly in the ointment is that those destinations would need to be electrified.I must admit i didn't realise there would be no connection between HS2 & Birmingham New Street. A missed opportunity, maybe!
But the big fat fly in the ointment is that those destinations would need to be electrified.
Or the classic compatible sets (or portion of) could be the magic B word!
![]()
Ahhh but don't RENFE in Spain have such Ultra high speed trains that are Bi-mode, both electric and diesel but maybe not at 225mph on electric!!
RENFE are part bidders for the WCP. :-0
The RENFE Class 730 or S-730[4] (Spanish: Serie 730 de Renfe, manufacturer's designation Talgo 250) is a high-speed dual-gauge, dual-voltage and hybrid (electric and diesel) trainset consisting of 11 Talgo VII tilting coaches and two power cars, used on Alvia services.[5][6] The class have been nicknamed patitos (ducklings/little ducks), due to the shape of the train nose.[7] They are an upgraded version of RENFE Class 130, in order to extend high-quality services to parts of Spain not on the electrified network, so these hybrid trains can run with both electric and diesel power.
I must admit i didn't realise there would be no connection between HS2 & Birmingham New Street. A missed opportunity, maybe!
Isn't there going to be a light rail type thing as in like a tram type connection between the two?
The plan is to build a junction on the Metro line at the corner of Bull Street and Corporation Street and carry on down Bull Street to the HS2 station and beyond. However I think it's a simple junction facing towards Snow Hill so there is no curve to allow trams direct between New Street and Curzon Street.Isn't there going to be a light rail type thing as in like a tram type connection between the two?
Booked onto the 840am Glasgow to Euston this Friday , was like 10 available seats on the seatmap in standard , ive never seen it so full. Is this service usually rammed ?