ModernRailways
Established Member
- Joined
- 21 Apr 2011
- Messages
- 2,180
Did that hit that train or is it just clear of the line? Obviously you can't run anyway with it hanging by splinters.
It's struck the train.
Did that hit that train or is it just clear of the line? Obviously you can't run anyway with it hanging by splinters.
It's struck the train.
![]()
It's struck the train.
![]()
Funnily enough the Mem said something similar last night. It's alright for the general publc being advised to alter travel plans or delay their journey where necessary, but rail staff are still expected to turn up. Obviously employers don't think the staff will be affected by adverse weather.What about when it comes out in the next few days just how many RMT members weren't injured or killed by being made to work in such conditions?
As I said before about anyone else trying to get to work, any employer has a duty of care and would be ill advised to force staff to come in at any cost (literally any cost) so even if you had shed loads of spare staff just sitting around, you still couldn't do much more to get everything clear.
In any case, the winds are continuing through rush hour. It's not a case of the high winds being last night and the railway taking too long to clear up. Even now there must be many places where staff are working in an element of danger to clear the debris.
If I was Bob, I'd have capitalised on thanking the efforts of members (and rail staff in general) and even complimenting Network Rail and the train operators taking things seriously. Doesn't he realise the power of PR, by making him not always look like a total imbecile?
Errr, with wind and trees blowing down during a short space of time, the problems are almost everywhere at once.
And, other countries do get affected, but do you think some trees on lines in Bravaria are going to make the BBC news. The high speed line between Hannover and Berlin is still partly shut from the floods a few months back, not seen much of that in the Sun.
Dammed if we do, dammed if we dont.
Send out trains in dark, trains get stuck or worse, passengers moan, but you knew it was coming.
Wait until its light and the wind has died. Complete over reaction.
If not being nanny state is to send out trains full of people, in high winds, in the dark, during bad rain, perhaps to their deaths and stuff the consequences. Hello Nanny.
I feel sorry for those working nights and unable to get back home![]()
Seems we get trees cleared up and bam. More trees at London Rd (btn), Polegate and Folklington now on the line.
10.19 from Brighton already 6 mins down
Below some photos from Guildford station. Interestingly NRE list two trains as delayed, the 8.38 and 8.48, both FGW services. Someone at SWT has simply removed them so it's great to see that they are not just leaving the system on autopilot. They had in the past only put up those running as opposed to those running and those cancelled but it doesn't matter, as long as all those shown as running but are not running are not displayed. I think that policy needs to be extended to NRE.
Such a small island, and so many variations.
Part of what the RMT has said could be seen to be true; LU managed to get its service up and running quickly because of the Emergency Response Unit and also the number of mobile operational managers who can get to site quickly, assess the issue (and possibly fix it themselves, such as removing lighter branches from the line), and then work to get the service recovered quickly.
The Brighton Main Line is open again with trains having the following calling pattern: Brighton, Haywards Heath, Gatwick Airport, East Croydon,Clapham Junction and Victoria only
Trees could keep falling for the rest of the day. Wont take much for unstable trees to fall in a bit of wind - thats why additional trees will fall.
Within the next 30 minutes only 103 trains cancelled according to SWT's journey check. Just shows how many trains are usually run within any 30 minute period during the day.
They are attempting to run a 10am service from Guildford to London. It departed 19 minutes late and just 16 minutes late from Woking. Very surprised it made up any time at Woking, given the conditions out there.
Not much good for the 30 or so passengers stuck at Horley
Traffic permitting, it's a bit easier to mobilise units to stations and track around London by road than some of the rail network.
I also wonder if even LUL has enough staff to cope with what the railway network is? There are no overhead wires to bring down either. And of course there's then the fact that a lot of the network is underground and should be fairly safe, flooding excepted.
Surely Network Rail have emergency response teams too - but they're probably spread quite thin and might have to drive a lot further from incident to incident?
However, having people on trains that go along the line to clear off trees sounds like a great idea - but the problem is there are still trees coming down even now.
Trees could keep falling for the rest of the day. Wont take much for unstable trees to fall in a bit of wind - thats why additional trees will fall.
Still having leaves on can't help matters. They really get thrown about a lot more than when they've fallen off.
Many trees around here have really shifted a lot of their leaves, but by no means all.