How can we engineer trees?![]()
im no expert but why in the 21st century and in a 1st world country we cannot cope with a windy day?
On the Southern network, trees are down at Hassocks, Keymer Junction, Pulborough, Lancing, Bosham, Seaford, Balham (6 in this area) and the Redhill - Tonbridge line has a lot.
Cheds and Dad are booked from Newcastle to London at 1128 on Monday, which might not turn out to be the best timing ever!
Any EastCoast specialists who could provide info nearer the time or Monday morning will be thanked...
And take care all those out and about if this is really difficult.
How many on the Uckfield line, or haven't they ventured down it yet? Althought wouldn't surprise me if they are using the Class 171s to carry crew to check other lines as they can still run with the current off, which must make the process easier.
The BBC have posted this photo of a pedestrian footbridge at London Bridge station where the roof has partially collapsed
![]()
lol someone needs to invent something to stop falling trees. is it my imagination was HEX running Ok all this morning?
From the BBC "Bob Crow, general secretary of the RMT transport union, has attributed the virtual rush-hour shutdown on the railways to staff numbers being "hacked to the bone"."
![]()
I'm due to travel from Huddersfield to Alton today via Northern, East Coast and then South West Trains. I'm travelling on a EC & connections advance, and both East Coast and SWT have said that tickets for today can be used tomorrow instead.
I'm assuming that I can travel tomorrow even though I also have to use Northern, but I just wanted to double check!
I'm due to travel from Huddersfield to Alton today via Northern, East Coast and then South West Trains. I'm travelling on a EC & connections advance, and both East Coast and SWT have said that tickets for today can be used tomorrow instead.
I'm assuming that I can travel tomorrow even though I also have to use Northern, but I just wanted to double check!
Latest from Southern: A partial service is expected to begin shortly. Train planners are currently preparing a timetable.
Service to operate between London and Brighton - Calling at Clapham Junction, East Croydon, Gatwick Airport, Haywards Heath and Brighton ONLY.
im no expert but why in the 21st century and in a 1st world country we cannot cope with a windy day?
Damage at Faversham station.
![]()
Any clues if Redhill will get a service?
Quite possible but HEX only runs a few miles of track. If the weather was ok and the line was clear then HEX may well have run ok.
But on the lines like ECML, MML, BML, SWML etc there are many many trees blocking lines and damaging wires and so trains can't run over them. Therefore those lines can't run.
You seem to be having difficulty grasping that there are genuine problems out there today and seem to believe that his is just the railway being lazy and making no effort or un any trains.
And it's not just a bit of wind, we were talking 60-80mph winds, as high as 99mph in some costal areas apparently. That's not a windy day often seen in the UK by any means...
I did not think that even this particular person who would try to make political capital out of a situation where the weather can cause landslides and over 50 trees (at least, most probably more) to be blocking railway lines and roads.
Perhaps he will organise some form of industrial action to teach the weather a lesson...:roll: