So does this mean that there will eventually be two lines between Beddau and Cardiff? One via Pontyclun and the other via Creigiau?
Ah I see, I thought though according to SEWTA there would be enough capacity for at least an hourly service via Pontyclun - running through to Ebbw Vale?
So does this mean that there will eventually be two lines between Beddau and Cardiff? One via Pontyclun and the other via Creigiau?
I think that unlikely for the foreseeable future. A direct route via Pontyclun would miss out on some significant catchment areas. There is also the problem of capacity on the SWML and the need to install a new junction at Pontyclun; the line has been severed for some time. Going via Creigiau would allow the old formation to be renovated without interfering with any existing traffic. Only the reinstatement of the junction at Waterhall will require an engineering posession.
I think that unlikely for the foreseeable future. A direct route via Pontyclun would miss out on some significant catchment areas. There is also the problem of capacity on the SWML and the need to install a new junction at Pontyclun; the line has been severed for some time. Going via Creigiau would allow the old formation to be renovated without interfering with any existing traffic. Only the reinstatement of the junction at Waterhall will require an engineering posession.
Yeah I see what you mean. I suppose there would be more operational benefits via Creigiau - for example if the Metro system doesn't take off it could become part of the Valley Lines network, instead of terminating at Cardiff if it went via Pontyclun. I think there would need 3 bridges to be rebuilt from memory, over the A473, the A4119 and the M4, as well as demolition of a row of houses in Fairwater? Please correct me if Im wrong!
I know there was the issue with the bridge over the M4 I am not sure of the other bridges although with the new By-pass opened a bridge would be neccesary over the A473.
I suppose you might be able to avoid demoishing a row of houses in Fairwater if you use on street running with the use of tram-trains depending on the position of the houses
There will undoubtedly be a need for bridge work but I'm not sure of the position at Fairwater. Happily the rest of the rout is unobstructed. It is unclear from reading the report as to whether this might be light or heavy rail. This scheme was first mooted, in a joint study by BR and the Local Authorities, around about 1980. At that time it was definitely heavy rail. We shall see.
Hopefully it will be light rail using tram-train technology as what was proposed by the Cardiff Business Partnership with various new stations around Cardiff including at Ely Bridge, Callaghan Square and Rover Way/Newport Road
This appears in the report:
Priority No 1. Beddau - Cardiff, new rail line on disused rail corridor.
and further down the table:
Priority No 5. Caerphilly - Newport, new rail line on disused rail corridor.
Light Rail comes in at No 4:
Cardiff Queen street - Callaghan Square - Cardiff Bay - Cardiff Enterprise Zone - Cardiff Central.
On Page 27:
''The new services and routes would be developed incrementally alongside and following Valley Lines electrification and will build on the benefits of rail electrification. The more major developments - anticipated to deliver substantial benefits - e.g. the Cardiff Bay Area rapid transit system - require significant further technical development and value for money consideration.''
Wow, I'd never thought that the Beddau line would be 1st priority! Good news then. And correct me if I'm wrong but it will be heavy rail, If so, that would be even better as it would then easily become an extension of the Valley lines network. Good news about the Caerphilly to Newport line too.
The proposed service will not touch Pontyclun. (see attachment). It will have stations at Beddau; Llantrisant; Creigiau; Park & Ride at M4 Jc 33 and a station, yet to be named in North West Cardiff.
Let us hope that both schemes go ahead because they have every chance of being useful additions to the network.
--- old post above --- --- new post below ---
For M4 Jc 33 read 34. The proposed station at Jc 33 is an extension of the Coryton line.
I think the document said these schemes were post 2015 - Lets hope they come to pass. The infrastructure around Beddau/Llantrisant/Talbot Green can't cope with road traffic now - the new Church Village bypass is slowly but surely grinding to a halt in certain places. Lets hope the Welsh Government mandarins don't go for the cheap option and install 'cycle routes' or new road schemes which have their uses but are not a long term solution.
Most certainly the by-pass has become a victim of its own sucess. Things have become terrible at Talbot Green especially at Rush Hour. It regulary used to take me 15-20 minutes to get from the roundaboout at Junction 34 to the roundabout with the A473 by-pass
It takes me 15 mins now to get from Tonteg to Nantgarw...doesnt sound too much but just 2 miles. Don't get me started on Talbot Green...
Would need some interesting works around Tonteg and through the villages...tram train starts looking good?Starts sounding like an attempt to reconstruct the whole LLTVR might be a good ideaWould need some interesting works around Tonteg and through the villages...tram train starts looking good?
Ian
The Caerphilly to Newport line used to split, the Up Line taking one route and the Down another. This meant places like Waterloo or White Hart Halt were served in one direction only.
Starts sounding like an attempt to reconstruct the whole LLTVR might be a good ideaWould need some interesting works around Tonteg and through the villages...tram train starts looking good?
Ian
Took a ride on the City Line the other day, just as we passed Fairwater station and the Waterhall junction now lies under a housing estate, I hope those people know about what is being proposed!