transmanche
Established Member
- Joined
- 27 Feb 2011
- Messages
- 6,021
The trains have been delivered and are performing well
Has any rolling stock introduction gone smoothly with 100% reliability from day one?No they are not.
I have suffered many delays from cancelled services where something has gone wrong with these unreliable things.
Class 458. At first, they were so unreliable that SWT was going to return them to the RoSCo. Later on, they were the first units to achieve over 100,000 miles per failure.