• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Stagecoach East Scotland

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

overthewater

Established Member
Joined
16 Apr 2012
Messages
9,125
Why on earth are there running the extra X59 up to Glenrothes? seems like a waste, those Extra X59 would be better off going up To Cowdenbeath depot.

Has anyone else notice No mention of the X54.....

It seem the last No19 at night will be coming off.
 
Last edited:

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
hmmm just had a skip through there twitter - think the 747 needs something larger - X London bendies? Radicle for them I know but its a victim of its own success it would seam. x54 is slow enough without going through there too and will Rosyth traffic not be catered for by 19? ↲ x52 would make sense terminating at haymarket Id say and maybe 1 of the x59s should be decker subject to weather?
 

Liam

Established Member
Joined
29 Dec 2010
Messages
1,245
Any ideas how many new vehicle will be required, and what will they be? B13's?
--- old post above --- --- new post below ---
Has Anyone else notice some of the Glasgow buses will not operate Via Forth Valley Hospital, Also most coaches will wait in Glasgow for 20mins layover. plus Everything swaps over!

Didn't notice the draft timetable links. X52 does go into the Bus Station.

Only really the X27 to FVH during the day. Makes sense bus between St Andrews, Vic, QM (nearly) and FV Hospitals, like the X42 and 333 Hospital link or whatever they call it.

See they have also solved the Bawbee Bridge problem, sending everything via Diageo, presume Dysart, Boreland, Standin Stane Road?
 
Last edited:

overthewater

Established Member
Joined
16 Apr 2012
Messages
9,125
Any ideas how many new vehicle will be required, and what will they be? B13's?

Its been said 9 new B13 are coming, Plus there need an extra 6 coaches or buses for the extra work. im sure there are coaches sitting in reverse somewhere.

I never notice the X27 being changed, I did say that bridge might be a problem ;) I will say this, this change of route will pee off a few people.
 

Liam

Established Member
Joined
29 Dec 2010
Messages
1,245
Suppose the X60 will remain unchanged, for now anyway.
 

Liam

Established Member
Joined
29 Dec 2010
Messages
1,245
The X27 can be rather busy via Methilhill.

Still got the 6, 44, 48 and 49. Only lost the fast Kirkcaldy bus, 6 takes 10-15 minutes longer. Maybe X58 will extend to Leven to replace it, doubt it though.
 

overthewater

Established Member
Joined
16 Apr 2012
Messages
9,125
X27 Coach that arr at 08.19 extends to the Univ???
--- old post above --- --- new post below ---
Roadworks at the ferrytoll are due to start next year problely around this time. Details will appear in January.

Citylink service should be moving to halbeath to help free up much needed space at the ferrytoll. Overall it seems to been alright the plans and should be I introduced towards the end of November.
 

Liam

Established Member
Joined
29 Dec 2010
Messages
1,245
If tickets bought on MB/CL could be used on Stagecoach services then it makes sense to go into Halbeath rather than Ferrytoll. There are already enough services from Ferrytoll into Edinburgh, but not enough from Halbeath. Wonder if the Megabus Sleeper will continue to call at Ferrytoll or move to Halbeath also.

Will long stay be permitted at Halbeath? Ferrytoll used to be useful for free airport parking. It still is, but with the 7 day limit it's not so good anymore for hoildays etc.
 

overthewater

Established Member
Joined
16 Apr 2012
Messages
9,125
If tickets bought on MB/CL could be used on Stagecoach services then it makes sense to go into Halbeath rather than Ferrytoll. There are already enough services from Ferrytoll into Edinburgh, but not enough from Halbeath. Wonder if the Megabus Sleeper will continue to call at Ferrytoll or move to Halbeath also.

Will long stay be permitted at Halbeath? Ferrytoll used to be useful for free airport parking. It still is, but with the 7 day limit it's not so good anymore for hoildays etc.

From what Im hearing there may infact Stop all overnight parking in Ferrytoll to free up much needed space and instead direct people to use Halbeath. Sleeper should be staying at Ferrytoll, ( never say never) Someone did say a few of the coaches peak coaches may also stop at the ferrytoll....

The problem with allowing Mb/SC tickets to be swaped with stagecoach service is it could lead to overcrowding. On many services can be full with long distance passengers.
 

overthewater

Established Member
Joined
16 Apr 2012
Messages
9,125
It a shame neither the following ideas could not be done:

* Continue to operate into Charlotte sq towards the bus station.
* Then down Frederick Street. ( new stops ) Down onto Queens street non stop to the bus station, which will help speed up the services.
 

Jamester

Member
Joined
9 Jul 2010
Messages
155
It a shame neither the following ideas could not be done:

* Continue to operate into Charlotte sq towards the bus station.
* Then down Frederick Street. ( new stops ) Down onto Queens street non stop to the bus station, which will help speed up the services.

The fewer stops the better. A stop at the west end and ONE other stop before the bus station should be sufficient. But there'll be one on Prince's Street and I guess 2 others before the bus station. I remember a time where the first stop after departing the bus station was on Charlotte Square. The passengers are pampered now.

I don't fancy the idea of going down Frederick Street. Those cobbles are slippy when wet, not to mention when it's freezing!
 

overthewater

Established Member
Joined
16 Apr 2012
Messages
9,125
It seems all the coaches from the current X27 will move to Glenrothes for use on the X52 and extra X59. I've heard Double deckers will be used for Leven - St Andrews section come November.

Glenrothes will be full, hence the reason for the 32 at Aberhill. Is there not any more land that could be brought to expand Glenrothes or Aberhill?
 

DunsBus

Established Member
Joined
12 Jan 2013
Messages
1,813
Location
Duns
It a shame neither the following ideas could not be done:

* Continue to operate into Charlotte sq towards the bus station.
* Then down Frederick Street. ( new stops ) Down onto Queens street non stop to the bus station, which will help speed up the services.

The only problem with that suggestion is that the paving at the Queensferry Street/Hope Street corner has recently been reinstated, traffic is at the moment being allowed two-way through this corner by means of temporary traffic signals allowing alternate one-way working. When the bus gate opens this access will become restricted. I also seem to remember that one of the triaxle coaches got stuck turning in to South Charlotte Street from Princes Street a few years back so doing this would be a no-no. (There are also plans for public realm improvements in Charlotte Square once the trams are up and running.)
 

Liam

Established Member
Joined
29 Dec 2010
Messages
1,245
It seems all the coaches from the current X27 will move to Glenrothes for use on the X52 and extra X59. I've heard Double deckers will be used for Leven - St Andrews section come November.

Glenrothes will be full, hence the reason for the 32 at Aberhill. Is there not any more land that could be brought to expand Glenrothes or Aberhill?

Glenrothes, no. They expanded it a few years ago. Aberhill, well it right beside a scrappies, but there is waste ground at the back of the depot.

If only there was a big empty depot in another Fife town that wasn't seeing much use..... :roll:
 

overthewater

Established Member
Joined
16 Apr 2012
Messages
9,125
Glenrothes, no. They expanded it a few years ago. Aberhill, well it right beside a scrappies, but there is waste ground at the back of the depot.

If only there was a big empty depot in another Fife town that wasn't seeing much use..... :roll:

I wonder if the land next door will get built for a new depot?
 

Stan Drews

Established Member
Joined
5 Jun 2013
Messages
2,151
It seems all the coaches from the current X27 will move to Glenrothes for use on the X52 and extra X59. I've heard Double deckers will be used for Leven - St Andrews section come November.

Glenrothes will be full, hence the reason for the 32 at Aberhill. Is there not any more land that could be brought to expand Glenrothes or Aberhill?

I understood that Cowdenbeath would be operating the X52, so I'd expect some of the older B7s that get replaced at Aberhill to move there.
 

Stan Drews

Established Member
Joined
5 Jun 2013
Messages
2,151
I wonder why X52 coaches all start in Glenrothes the mornings.

According to the draft timetables on the company's website, the two X52 workings start/finish at Halbeath P&R, which would fit with the info I heard re Cowdenbeath operating these workings. It is also much closer to enable driver reliefs to take place.
I would however expect Glenrothes to be working the extra X59 short workings, at least one of which appears to be the existing peak journey "filled in".
 

overthewater

Established Member
Joined
16 Apr 2012
Messages
9,125
According to the draft timetables on the company's website, the two X52 workings start/finish at Halbeath P&R, which would fit with the info I heard re Cowdenbeath operating these workings. It is also much closer to enable driver reliefs to take place.
I would however expect Glenrothes to be working the extra X59 short workings, at least one of which appears to be the existing peak journey "filled in".

It seems the First and last journeys each way on the X52 are operated by Glenrothes depot, While the Daytime runs must be Cowdenbeath.

That is whats causing some confusment.
 

Liam

Established Member
Joined
29 Dec 2010
Messages
1,245
https://twitter.com/StagecoachEScot/status/375578716279427072

Road accident on A91 West of Strathmiglo. Service 23 diverted via Falkland, Leslie, Milnathort. Delays of 45 minutes expected

https://twitter.com/StagecoachEScot/status/375599611429531648

Service 23 now diverted via B936 to Newburgh, A913 passed Aberargie then A912 to Gateside & terminating at Tillycoultry due to accident


So are folk required to use First services between Tillicoultry and Stirling? I think its £3.40 single.
 

Top