They (22) haven't currently got a home after March 2020. They weren't allowed to be bid into Northern so weren't in their plans.
Is there ANY chance at all of them being converted to EMU's, like what they wanted to do with the voyagers? Then they could make themselves useful in a lot more places.
Plenty of upcoming franchise competitions would likely be grateful for modern, capable DMU stock - is there a weight restriction with the 185s that might prohibit their use in other areas? I seem to recall they are quite heavy relative to other DMUs.

Also a wild and crazy idea here. The electrification of the GWML has apparently fallen back again and GWR are not happy because timetables have already been produced to run bi-mode trains and a single diesel mode would not maintain the diagrams. Could this mean a group of trains sat around doing nothing? Why not retain the HST's for the period of time until electrification is complete and deliver the early AT300's to TPE first where thy could be put into service as soon as available and the increase in capacity is sorely needed.
I know I am living in cloud cuckoo land but it is a dream I have![]()
I am sorry but I can't understand what you are saying
Bi-modes are due to be delivered to work on GWR's electrified lines and non electrified lines which is what they were designed to do
What you want is for them to instead be delivered to work on TPE's electrified and non electrified lines
What is the difference?
Anyhow the Angel HSTs' release cannot be delayed for they must go to the Scotrail Franchise on time
Brian
Failing that, let TPE keep the whole fleet so that every service can be 6-car throughout. Would need some platforms extending but once it's done other won't need doing again!
First will have their business plan and will not be interested/able to afford to lease the whole fleet.
What happens to the spare ones is not their problem.
We'll see if Wales & Borders are interested, but the class 185 limitations will apply - 3-car will be too small and 6-car too big.
Unlike class 175s, speeds between Ludlow and Crewe will also be affected by the speed differentials - eg Shrewsbury-Crewe would be 70mph rather than 90mph.
As 185s have unit deselect, there's no reason that the current planned platform extensions need to be increased (though with only a few months to go before TPE start serving Slaithwaite and Deighton, they need to get a wiggle on even for single 185s).
I thought it was already established that some of the 185s were staying on routes they already operate on that are transferring to Northern namely Barrow, Windermere, Blackpool to Manchester Airport.
TPE keeping the remaining 185s for Cleethorpes to Manchester Airport services.
Unit deslect won't help here. Deselecting a three car train means no doors open. You need Selective Door Opening (SDO) for these stations.
I was talking about unit deselect for 6-car trains. Current plans are for intermediate stations between Manchester and Leeds to be extended to take 3x23m trains so that TPE semi-fasts can call. With my proposal for most or all services to be 6-car, unit deselect would be fine as long as everyone is informed which part of the train to be in for the stations concerned. The alternative is all semi-fasts being single 185s which means overcrowding to the extent seen earlier will become even more commonplace than it is currently.
Unit deslect won't help here. Deselecting a three car train means no doors open. You need Selective Door Opening (SDO) for these stations.
But all other North TPE trains will be formed of 5 carriages, a big improvement on currently, so that ought to help with over crowding on that route.
South TPE has to be the priority for doubling up 185s as it's one of only two fast trains per hour between Manchester and Sheffield. There will be enough 185s to double up every service on South TPE, there will also be enough to double up some North TPE semi-fasts, but not all of them. With some clever diagramming I bet you could use three extra 185s on the North route purely for strengthening purposes and end up doubling up all of the main peak time trains heading east from Manchester and West from Leeds in the evening (ie. 17:00-18:00) and vice versa for the morning.
--- old post above --- --- new post below ---
Just regarding 185s losing time compared to 175s on the Crewe-Shewsbury line because of not running at Sprinter speeds..would the superior acceleration of 185s not make up most of the time lost?
Well they definitely have selective door opening. Is this different from Unit Deselect?
The issue is primarily with the semi-fasts. What's essentially going to happen is that each 185 will have the equivalent of a 3-car Pacer worth of extra passengers in the peak, with probably half that off-peak, between Leeds and Manchester. The new 5-car stock will be running 3 of the 5 hourly services of which only one will call at Dewsbury, it may well take some of the traffic from the slower services but realistically it will barely scratch the surface with passenger numbers still being very much on an upward trend.
Like I say though, if TPE retain 29 185s; then assuming 4 are kept aside for maintenance; 14 to cover all South TPE diagrams as doubled up services; and 8 to cover all of the North TPE semi-fasts then it'd leave 3 extra to strengthen these semi-fasts which would go a long way to providing extra capacity on most/all of these semi-fast services.
You're right, but this whole thread is full of suggestions for where the remaining 185s could go, all with issues over linespeeds or a drop in capacity per carriage based on what currently runs those services. The 185s were designed the way they are precisely to cope with the gradients and intensive service on North TPE, where the only weight issues are between Selby and Hull and those restrictions are minor enough that the better acceleration is enough to negate them...
So why not keep them there, so that everyone who wishes to travel can actually fit? For years demand has outstripped capacity on the route and this is only going to get worse, so why not try to solve that problem? Rather than paring everything down to the bare-bones (which has worked SO well for the last 20 years!) it's about time we had a bit of "gold plating" on the route!
Come on, Gideon... Put your money where your mouth is on the so-called Northern Powerhouse!
There has to be compromise though - there simply isn't enough rolling stock nationwide to strengthen every peak time service running. The extra 22 185s that FTPE won't be keeping could be put to good use elsewhere and provide additional capacity, especially if the first class bit is ripped out to provide a solid standard 3-car train. Pretty sure TPE will have done the maths and think that 29 185s will be sufficient for South TPE and the North semi-fasts.
I'm more unsure about only 44 of the new trains being ordered, considering these will have to cover all North fast services and the West Coast Scottish services (with additional Liverpool services to come). Considering around 5-6 will need to be kept aside for maintenance, covering all diagrams with 38 units seems a bit tight, especially given how busy the Scottish services are now, with the possibility some may need strengthening to 10 cars.
As I've posted in one of the threads previously a TPE director has said 6 car operations will be introduced between Manchester and Sheffield.
I agree 12 x 5 car trains seems a bit insufficient for West Coast Scottish services especially when you consider that stock will have to cover a limited Liverpool-Glasgow service as well.
Only between Manchester and Sheffield or was it not stated whether it would cover the whole route?
If 12 are going to be used for the Scottish services, how many will be used for North TPE? I'd have thought 30 would be needed to cover all the diagrams, but that would only leave 2 for maintenance which seems a very tight stretch.
The numbers do look a bit tight using some back of the envelope calculations, however I don't think that First would have proposed the number of trains they have if they couldn't make the diagrams work.If 12 are going to be used for the Scottish services, how many will be used for North TPE? I'd have thought 30 would be needed to cover all the diagrams, but that would only leave 2 for maintenance which seems a very tight stretch.
The numbers do look a bit tight using some back of the envelope calculations, however I don't think that First would have proposed the number of trains they have if they couldn't make the diagrams work.
There has to be compromise though - there simply isn't enough rolling stock nationwide to strengthen every peak time service running. The extra 22 185s that FTPE won't be keeping could be put to good use elsewhere and provide additional capacity, especially if the first class bit is ripped out to provide a solid standard 3-car train. Pretty sure TPE will have done the maths and think that 29 185s will be sufficient for South TPE and the North semi-fasts.
I'm more unsure about only 44 of the new trains being ordered, considering these will have to cover all North fast services and the West Coast Scottish services (with additional Liverpool services to come). Considering around 5-6 will need to be kept aside for maintenance, covering all diagrams with 38 units seems a bit tight, especially given how busy the Scottish services are now, with the possibility some may need strengthening to 10 cars.