Southeastern metro fleet replacement/improvement

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

frankmoh

On Moderation
Joined
7 May 2025
Messages
820
Location
London
6 or 7?

Interesting.

How long has the typical turnover been from one unit to the next?
According to my searches on this website, the first blue 376 was spotted on the 15th of April this year.

Assuming this was the day they were first in service, this means there has been roughly 6.4 days between livery applications. So about a week.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,398
Location
Taunton or Kent
Could this loco move precede a scrap drag? The last loco move from Rectory Jn was to then take Networkers to Kingsbury, however this is normally a Tuesday or Thursday drag, but the loco move timing suggests a Wednesday move. It could also be a 175 drag to Wolverton, but I think this is less likely as two units moved earlier this week:


UPDATE: Drag to Booths scheduled for Wednesday:


Reported to be trailing only 140 tonnes, so probably the equivalent of 4-cars only.
 
Last edited:

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
I have just watched an interview with the managing director of South Eastern Rail, Steve White, and credit goes to the YouTube channel Green Signals and Richard Bowker for interviewing Steve White. Here is the interview itself.


The talk about rolling stock is from around minute 28. He mentioned that they are preparing "the final business case", to be submitted "next year" to the treasury and the DfT

They are really taking their time. Anyway good luck with getting anything from the treasury....
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,041
Location
West Wiltshire
The talk about rolling stock is from around minute 28. He mentioned that they are preparing "the final business case", to be submitted "next year" to the treasury and the DfT

They are really taking their time. Anyway good luck with getting anything from the treasury....
The concept of a Final Business Case just seems plain wrong. Normally just have a Business Case, which either stacks up or doesn't work.

Describing it as a Final something sounds like it is a last chance option before a project runs out of options and dies.

And what is with submitting next year, even if wrote 5-10 pages a day would expect to produce a case within months (even faster if pay someone external to produce it)
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,648
The concept of a Final Business Case just seems plain wrong. Normally just have a Business Case, which either stacks up or doesn't work.

It is standard Governement capital investment procedure. To be fair, it is also standard private industry capital investment procedure too. As an example, see the ‘Final Investment Decision’ milestone taken by companies building windfarms / solar farms etc.

The stage before is ‘Outline Business Case’ where you have a good idea what you want and what the benefits are, but need to do a fair bit of work to get more certainty on the costs and risks. In this case, it will involve tendering for the trains (and any other elements, eg maintenance, depots, finance, associated infrastructure works etc).
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Regardless it's been a very slow process from the invitation to tender being first issued in 2022. Two years later came a shortlist. Is it normal for a tender to take four years to reach final business case status?

At this rate new stock in service by 2030 IF the Treasury agrees? And that is far from a given
 
Last edited:

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,160
At this rate new stock in service by 2030 IF the Treasury agrees? And that is far from a given
No chance. Northern is ahead of Southeastern in the queue for new passenger rolling stock, and even with the tender exercise ongoing, the first Northern vehicles will only be entering service in 2030.
 

PaulJ

Member
Joined
20 Jun 2011
Messages
169
No chance. Northern is ahead of Southeastern in the queue for new passenger rolling stock, and even with the tender exercise ongoing, the first Northern vehicles will only be entering service in 2030.
But the North get nuffink! It's always the south first in the queue!!
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,041
Location
West Wiltshire
At this rate new stock in service by 2030 IF the Treasury agrees? And that is far from a given

If you want a timeline, this appears as part of overnight GBR announcements. The long term strategy starts once GBR established
The government will develop a long-term industrial strategy for rolling stock, which will support manufacturing and ensure a stable pipeline of work. Once established, GBR will take a whole-system and long-term approach to using rolling stock across the network, providing certainty to manufacturers and rolling stock companies across the country and globally. Taking this approach to rolling stock will enable greater certainty and lower risk for the supply chain and will be a better way to secure value for money.
 

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
If you want a timeline, this appears as part of overnight GBR announcements. The long term strategy starts once GBR established


I can't see any timeline spelled out there.

Because in truth there isn't one. At the moment the government seems to be in a money saving mode, so they will probably postpone things as much as possible, without necessarily openly announcing it.

Networkers will have to soldier on for years to come. Which isn't great as they simply keep failing. I don't know if they can cope with another decade of service.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,398
Location
Taunton or Kent
Drag to Booths scheduled for Wednesday:


Reported to be trailing only 140 tonnes, so probably the equivalent of 4-cars only.
Reported on RailCam to be 465920 and 465934.
 

andyjhatton

Member
Joined
8 Apr 2023
Messages
106
Location
Dartford
At the moment the government seems to be in a money saving mode, so they will probably postpone things as much as possible, without necessarily openly announcing it.
I thought that (most of) the idea of the RoSCo model was that such capital expenditure is kept off the public books?
So the govmernment in theory would only be paying for subsidising potentially higher leasing costs of new stock, not putting up hundreds of millions up-front.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
804
Location
London
Regardless it's been a very slow process from the invitation to tender being first issued in 2022. Two years later came a shortlist. Is it normal for a tender to take four years to reach final business case status?

At this rate new stock in service by 2030 IF the Treasury agrees? And that is far from a given
It's not unheard of to take that long. The invitation to tender wasn't in November 2022, that was the first procurement notice. For the HS2 rolling stock, the equivalent notice was in April 2017 and the contract award only in December 2021 four and a half years later. Steve White has posted on Twitter/X "early next year" for the metro fleet to be finalised which would be three and a half years.

The Northern trains one is hoping to award "late spring 2026" which would be either 3 years or 2 years depending how you count the restart. Restarts can often use a lot of the same work and be completed quicker if the restart is for an adjustment to minimise the risk of the outcome being challenged. That is on the assumption the timelines haven't slipped since being announced in January.

Southeastern won't have been running this procurement in a vacuum, they will have a good idea what's required to get approval. The existing fleet is becoming more costly and will be demonstrated to be poor value for taxpayers. The challenge is likely the short vs long term cost differences.
I thought that (most of) the idea of the RoSCo model was that such capital expenditure is kept off the public books?
So the govmernment in theory would only be paying for subsidising potentially higher leasing costs of new stock, not putting up hundreds of millions up-front.
They'd need to pay for both fleets during the transition period, any depot modifications and the testing/training costs too. All of those costs would need to feature in the business case and generally will be upfront resource or capital expenditure.
 

Ridgeblog

Member
Joined
20 Apr 2021
Messages
61
Location
Welling
Do we know what routes exactly these proposed new trains are likely going to serve, will it be inner or outer suburban through Kent?
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,398
Location
Taunton or Kent
Do we know what routes exactly these proposed new trains are likely going to serve, will it be inner or outer suburban through Kent?
Primarily the inner suburban. Some outer suburban may also feature, such as to Tunbridge Wells. Having part of the fleet ordered with an enhanced interior for outer-suburban operation, like the 465/9s did, would be useful, as routes that are relatively long, but with frequent calling points, need higher acceleration stock, including the Maidstone East line and some Chatham mainline services. SE would have to order at the top end of their tender size to make this possible though.
 

andyjhatton

Member
Joined
8 Apr 2023
Messages
106
Location
Dartford
Aren't the Networkers mostly on the longer distance routes. They have toilets and more seating than the 707 and 37X fleets.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
804
Location
London
Aren't the Networkers mostly on the longer distance routes. They have toilets and more seating than the 707 and 37X fleets.
Not so much anymore, most of their longer distance work have been taken over by mainline 375/377 fleets. Tunbridge Wells and Gillingham are the remaining frequent long distance work for them. 376s and 707s don't go beyond Gravesend or Sevenoaks in service.

Within the metro area many London Bridge routes interwork and have a mix of all of networkers, 376 and 707s. Victoria/Blackfriars is nearly all networkers due to length restrictions with a few notable exceptions.
 

Jturner98

Member
Joined
2 Jan 2021
Messages
318
Location
Kent
Although this might warrant opening a new thread I saw 375627 at Waterloo East the other day with a camera fitted to the front valance. So maybe the 375s are now getting a mod like the 377s have.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
804
Location
London
Although this might warrant opening a new thread I saw 375627 at Waterloo East the other day with a camera fitted to the front valance. So maybe the 375s are now getting a mod like the 377s have.
Southeastern have recently expanded their infrastructure monitoring cameras onto the mainline fleet after the successful trial on the metro trains. That might be the camera you saw and if so only a proportion of the fleet will get them. Southeastern has a press release here if interested in more information.
Earlier this year, a pilot programme installed thermal imaging cameras on the front of a small number of Class 707 ‘City Beam’ trains. They successfully spotted 41 overheating incidents and prevented over 9,000 minutes of delays for customers.

The technology is provided by AIVR tech company One Big Circle and is now being expanded to include 20 Class 375 ‘Electrostar’ Main Line trains alongside the 12 Class 707 ‘City Beam’ trains already fitted. Other UK train operators have used similar technology but South Eastern Railway is the first to permanently install on-board cameras on this scale.
 

Phil R

Member
Joined
18 Jan 2020
Messages
162
Location
Guildford
Southeastern have recently expanded their infrastructure monitoring cameras onto the mainline fleet after the successful trial on the metro trains. That might be the camera you saw and if so only a proportion of the fleet will get them. Southeastern has a press release here if interested in more information.
Yes it is. High numbered units in each subfleet getting this, which might give the impression it's more of a full fitment, but it's not.
 

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
Mention of fleet replacement in Steve White speach:


“We want to do a Greater Anglia. We want to buy a new fleet of trains and use that as the catalyst for transforming the railway, and we're going to buy the right train for our railway, not the right train for the operator,” he said.

“Network Rail have been fully involved in the design and specification of this train. It will carry an onboard battery that will allow us to operate in the event of a trespasser and the event of a failure of the third rail power supply.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,398
Location
Taunton or Kent
Mention of fleet replacement in Steve White speach:

Pursuing this makes me wonder if Southeastern will then proceed to either fit batteries to the rest of the fleet, and/or withdraw trains without them? 707s could probably have them retrofitted, and maybe 376s, though the latter being older might make them more likely to be replaced. They don't want a situation where the power supply fails, only to find the train(s) affected are the existing stock that doesn't have them. I doubt 375s, 377s and 395s have the underfloor space.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
804
Location
London
Pursuing this makes me wonder if Southeastern will then proceed to either fit batteries to the rest of the fleet, and/or withdraw trains without them? 707s could probably have them retrofitted, and maybe 376s, though the latter being older might make them more likely to be replaced. They don't want a situation where the power supply fails, only to find the train(s) affected are the existing stock that doesn't have them. I doubt 375s, 377s and 395s have the underfloor space.
They probably don't want to let perfect get in the way of the good. We may have already seen the last third rail (or perhaps any EMU) fleet order without backup battery capable of providing traction power for small distances. While other fleets not having that capability will create limitations, it's much easier to fit batteries on fleets designed for it from the start. The business case will be less good for other units, from new the capability will pay for itself quickly.

The replacement fleet will be of significant size and there's a reasonable chance these units will be the first to encounter a problem on metro routes. For emergency isolations, in most cases some units will benefit from getting to a station they wouldn't otherwise have been able to. For power supply issues, these units could potentially rescue others or give additional flexibility before a fix. A supply problem on the approach to Charing Cross suddenly you've got a lot more units that can traverse the route, fewer to divert to Cannon Street and the possibility of diverting some Cannon Street formations of the replacement fleet to Charing Cross.

In the ice/snow emergency timetable, first workings switched to empty currently could potentially go back to passenger if made up of this fleet as it's far less likely passengers will be stranded between stations. The trains won't be stuck and require assistance for most metro routes too with batteries to get back to base making it easier for the treatment train to treat the iced up routes. Where conditions aren't good the 376/707 trains would need to be cancelled but other replacement fleet trains could continue operating if only small areas where battery power was required.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,236
Mention of fleet replacement in Steve White speach:

I'm sure every train operator would love to do a "Greater Anglia" but someone has to take the displaced midlife (or newer) trains. I can't see both the 376s and 707s being needed elsewhere.
 