Whifflet lunes new signals still covered
I have discovered that the delay in energising QS to Newbridge is because they realised that in addition to the ensuring that all the bridges etc met the new regulations, there were a large number of other bits of steel adjacent to the railway, every one of which has to be assessed for compliance! My informant confirmed the 23rd June.
Slowing down?
I don't know what individual or committee failed ask for a similar derogation from the new EU standards as had been asked for and given from the old ones. This failure has cost the country a fortune, and made future electrification schemes unaffordable until the relaxations can be reinstated.
The problem is not "the new EU standards" but the fact that the clearances were cut and pasted into the new British Group Standard without taking account of the recognition in the European documents that the British railway is built to narrower clearances and therefore may differ.
Plus it doesn't look good to say "We don't need to be *that* safe..."Because the HSE/ORR don't see it as a mistake?
No. No. For the love of God, no.Instead of overhead lines, could Scotrail have went down the 3rd rail option?
The A71 has now fully re-opened following 16 week programme of work to demolish and replace the road bridge next to the station in West Calder.
The bridge reconstruction was delivered in an intensive period of work from January to hit the 16 week programme and is part of wider activities on the Shotts line ahead of the electrification of the route by 2019
As well as work to demolish and reconstruct the bridge cleared for the electrification of the railway underneath, the work programme also involved extensive mining remediation work under the bridge abutments to ensure the ongoing integrity of the rebuilt structure.
Slightly OT, but does anyone know when NR plan on demolishing Consort House?
NR have notified the ScoGov that there will be a further delay in going live. Apparently there's a safey-critical component which is faulty and will have to be replaced along the entire length.
http://www.scotsman.com/news/transp...-rail-electrification-delayed-again-1-4449540
"Regrettably, it is now clear that a safety critical component is susceptible to failure and must be replaced. This will impact the energisation start date.
We are working extremely closely and collaboratively within the Scotrail Alliance to assess how the impact of this challenge can be minimised for passengers and we will keep your officials informed.”
Does anyone ken what the 'safety critical component' is?Apparently there's a safey-critical component which is faulty and will have to be replaced along the entire length.
From the description of the problem, I would have thought that the cost will fall on the manufacturer, or NR if they specified a substandard item. Certainly not ScoGov.
Does anyone ken what the 'safety critical component' is?
That was my first thought, but replacing them all would be a massive job.If its along entire length, insulators?
I would definitely agree with that assessment
I'm not so sure about that.In any case the supplier of a component is probably only liable for replacing the defective component, not for the cost of swapping them out or the costs arising from delays to completion of the project.