northwichcat
Veteran Member
But it can be changed while Northern is still the TOC, which is the key part in getting more capacity on that route.
Do you mean Network Rail can change the infrastructure in the next 12 months even though they have not announced any plans to and are running behind schedule with infrastructure plans they have announced?
There would need to be platform lengthening at most stations between Manchester and Preston if 8 car 319s were used. However, platform lengthening at stations like Blackrod should be easier.
Last edited by a moderator:
