The first D78s to the GOBLIN line then until completion of electrification, 172s to Chiltern and the 170s back to TPE. Problem solved.
Wot no smiley?
The first D78s to the GOBLIN line then until completion of electrification, 172s to Chiltern and the 170s back to TPE. Problem solved.
If the 319's mean I am more likely to get a 142 or 150 than a 156 on the Oxford Road to Lime Streets because the 156's are going to FTPE I won't be very impressed. What an amazing improvement that would be.
On paper it should not change as at least six 156s work on MIA/MCV/WGN/WBQ diagrams.
Merseytravel fund the use of 6 x 156s on Liverpool to Wigan/Manchester Airport services. However, at present only 2 are used on Airport services and the other 4 are used on Wigan services. Wigan services won't be switching to electric until September. 2 x 156s will be freed up from the Cumbrian Coast (as mentioned already) so only 4 x 156s are being freed up in time for the May timetable change by a combination of the introduction of 319s and 2 x loco-hauled sets.
September? I thought May was the working plan for Wigan / Preston services.
DfT said:Refreshed electric trains, providing faster, smoother and greener journeys, will be rolled out on busy commuter routes between Liverpool and Manchester Victoria from May, at a faster rate than previously planned. In addition, refreshed electric trains will be rolled out on the Liverpool to Preston route in the autumn. This will free up existing diesel trains to create additional capacity elsewhere on the norths network.
Only Liverpool-Victoria from May (plus Liverpool-Airport which should have happened before May.)
We all know that the Wigan branch was running behind, personally I did not realise it was that far behind![]()
Merseytravel fund the use of 6 x 156s on Liverpool to Wigan/Manchester Airport services. However, at present only 2 are used on Airport services and the other 4 are used on Wigan services. Wigan services won't be switching to electric until September. 2 x 156s will be freed up from the Cumbrian Coast (as mentioned already) so only 4 x 156s are being freed up in time for the May timetable change by a combination of the introduction of 319s and 2 x loco-hauled sets.
But the MIA service is diagrammed for 3 X 156.
Is the wigan branch far behind and why.
From the spreadsheet it looks near enough done.
Although the viaduct and the merging sections will be a pain it can't take them that long can it :/
Northern have put signs up at the stations between Piccadilly and the Airport saying "Bigger, Better, Electric". What a load of nonsense, the line has been electrified for decades, and the current trains are newer, and almost as large as the "new" ones. I can't imagine a 319 having much cause to stop at these places either, except possibly during engineering works, but then it's usually the South TPE that picks up extra the calls.
Northern have put signs up at the stations between Piccadilly and the Airport saying "Bigger, Better, Electric". What a load of nonsense, the line has been electrified for decades, and the current trains are newer, and almost as large as the "new" ones. I can't imagine a 319 having much cause to stop at these places either, except possibly during engineering works, but then it's usually the South TPE that picks up extra the calls.
Craig Harrop said:In developing the business case for the Northern Triangle electrification programme, the DfT identified that the Class 319 sets which were to be released by the Thameslink programme could possibly provide a value-for-money source of rolling stock. It was noted at this point that in their current state these units could not meet the sectional running times that can be achieved by the 323s so either a new timetable or significant re-engineering, with a traction upgrade, would be required to enable them to match the Class 323 acceleration curve if they were to be considered for use in South Manchester.
This may well be old news, but I heard the fairly distinctive sound of the retrofitted door buzzers they use on the 317/321 demonstrators coming from a 319 at Farringdon this evening. Is this going to be standard fit to every unit or just the ones staying with GTR (for now?) - the unit in question was in the white Thameslink livery...
It's not just about when the wires are up. Northern need to obtain clearance to use 319s on Wigan services and have enough Wigan crews trained on 319s.
The mind boggles if a 5-year old plan to introduce 319s to Wigan line services has left any clearance issues on the line.
For most of the last 2 years the Wigan line has been ahead of the Earlestown route in electrification progress.
It might also depend where the rework issues are.
It can only be shortage of stock that prevents early conversion.
And nobody ever mentions Warrington BQ services.
So how are the 319's cleared for Liverpool-Manchester ?319s are not cleared for Liverpool-Wigan yet - the wires aren't ready so it's simply not possible for them to have been cleared. Hopefully it should just be a case of putting a 319 on the line for a test, finding there's no issues with them running at Sprinter speeds on the line and then doing the necessary paperwork.
There is actually a slight difference between 150s and 319s. 319s carriages are slightly wider (1") and slightly shorter. The slightly shorter shouldn't cause any issues but slightly wider sometimes can (which is why 153s are banned from some routes which 156s are cleared for.)
So how are the 319's cleared for Liverpool-Manchester ?
They can't be properly cleared for the whole route, unless you mean Liverpool-Crewe-Manchester.
On the subject of 319 movements, this may be a naive question but I'll ask it anyway. Who would crew the movement of the 319 scheduled to travel from Wolverton to Allerton today? Presumably it has to be manned by people who are signed for that route (or parts of it) and who are also passed to drive the 319. Who would meet BOTH requirements at this time?
On the subject of 319 movements, this may be a naive question but I'll ask it anyway. Who would crew the movement of the 319 scheduled to travel from Wolverton to Allerton today? Presumably it has to be manned by people who are signed for that route (or parts of it) and who are also passed to drive the 319. Who would meet BOTH requirements at this time?
On the subject of 319 movements, this may be a naive question but I'll ask it anyway. Who would crew the movement of the 319 scheduled to travel from Wolverton to Allerton today? Presumably it has to be manned by people who are signed for that route (or parts of it) and who are also passed to drive the 319. Who would meet BOTH requirements at this time?
One of the freight companies, I think GBrF, do the moves between Bedford and Wolverton/Allerton/Hornsey so guess them.