1. A downgrade never goes down well with passengers. It doesn't matter if the current type of train is better than used on a similar service in another part of the country, that sort of an excuse for a downgrade isn't accepted by passengers
Did the passenger numbers on the Airedale/ Wharfdale lines go down when younger Pacers were replaced by 1960s slam door 308s?
Or did passenger numbers go up because the older EMUs were more reliable and most passengers aren't snobs about "London cast offs"?
350s work well on WCML stopping services, they manage to do the services which call at Hartford and Winsford on a very busy double track section of the WCML. 319s are unproven on WCML stopping services
How are the 319s supposed to prove themselves on WCML stopping services I wonder, I guess they could experiment by using them on the MML for 25+ years to see if they can cope with 100mph running and various stopping patterns
I agree with
ExRes - the 319s have had an intensive life working on Thameslink, combining the long periods of fast running with the frequent stop/start nature of the Thameslink "core" - slotting between InterCity services on the MML, running "all stop" services, being reliable enough to cope with the intensive service patterns on the BML through East Croydon...
...maybe you are going to tell me that there's something much more challenging about the WCML and the Liverpool/ Manchester area, but I think that 319s are proven workhorses.
When all is said and done, once the decision to transfer those chosen members of the Class 319 fleet to Northern Rail, could then immediate action not have been taken to place these units into a rolling programme of full refurbishment on a reasonably staggered time schedule so as not to unduly cause service availability problems. Was not a similar co-ordinated rolling programme carried out on the Northern Rail Class 323 units ?
No, because there aren't enough units to go round as it is. The sooner they go into service the sooner they can start displacing DMUs to where they are needed. Now what was it people keep saying about the Todmorden curve?
I was not aware that the Class 319 units were currently scheduled to be run over the Todmorden chord.
I agree with
edwin_m - the delays to Thameslink have meant that the 319s couldn't come north sooner - the alternative would have been what - to delay the electrification around Manchester so that the wires only went up when the EMUs were available?
Either we need these EMUs urgently, or we postpone the electrification so that they all get a long period of refurbishment. People are certainly quick enough to complain when the infrastructure is ready but the trains aren't.
Well I think 200 new diesel carriages before the end of 2012 for the North and South West for additional capacity would have been of more benefit to passengers in both areas. But DfT wanted to find somewhere to send your old 319s.
It was the Labour DfT who in around 2010 decided to withdraw proposals for new DMUs and instead to electrify certain routes and cascade the surplus to requirements 319s to those routes. The Coalition government who took over put all electrification plans and new train orders under review, which delayed adding much needed capacity to the network. So what was originally 200 extra carriages by December 2012 is 40 extra carriages to date as so we're 160 short and 18 months further on in time
The "200 carriages" was one proposal - we've seen many proposals - most of them never happened. But the "200 carriages" (which wouldn't necessarily have been brand new and wouldn't necessarily have been a net increase of 200) have gained mythical status.
The problem with the 4 car 319s is it means some services which don't need extra capacity are going to get extra capacity*, simply because they are on electrified lines. Other services are already 4 car Sprinters so the 319s will not be any extra capacity.
* We already see such examples going through Stockport, a packed 2 car train on a Buxton/Chester service while a spacious 323 with not enough passengers to fill a 153 goes through on an Alderley Edge service
Surely it's good news that these 319s will free up lots of 156s for enhanced capacity on Buxton services then?
What a load of bull****. What matters is strengthening the services which are most overcrowded, not coming up with misleading statistics about number of carriages/seats provided like DfT do all the time.
Network Rail have flagged problems with 4 car EMUs being cascaded to the Bolton corridor not being configurable to the required formations, so it's something a major official organisation has flagged as a problem.
Once CP5 electrification is complete, we could see 7/8ths of the services through Bolton moving to EMU operation:
Manchester - Bolton - Preston (and beyond) x4
Manchester - Bolton - Wigan (with all Southport services running via Atherton) x3
...leaving only the hourly Blackburn/ Clitheroe service
...that'd mean capacity through Bolton of (7x4=) 28 EMU carriages per hour, plus the DMU for Clitheroe - do you not reckon that this would cope with capacity?