• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Northern rolling stock changes post electrification

Status
Not open for further replies.

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Not being unkind, but 92m train lengths being required at both New Lane and Bescar Lane does seem to have shades of "overkill".

We've been here before

http://www.railforums.co.uk/showpost.php?p=1365530&postcount=8
http://www.railforums.co.uk/showpost.php?p=1365540&postcount=9

And if we're talking about village stations getting 4 car length trains.

Mossley Down, Greenfield Down, Marsden, Slaithwaite, Mouldsworth, Delamere, Cuddington, Greenbank, Plumley Down, Ashley Down, Hathersage and Grindleford are to get 96m platforms - long enough for modern 4 car trains like Turbostars.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
There was a while when it was strongly rumoured that the Manchester to Stoke stopper would be in the hands of LM 350s (with them running a through service to/from Birmingham, with half of the XC trains diverted via Crewe to compensate).

I don’t remember any complaints at the time that these four coach 100mph EMUs wouldn’t be able to cope with the timings of the three coach 90mph 323s.

Now that four coach 100mph 319s are strongly rumoured to be coming to the Stoke route, it’s oft repeated that they won’t be able to accelerate as well as the 323s and will therefore struggle. This was never mentioned when 350s were discussed.

The only real difference I can think of between these four coach 100mph EMUs is that the 350s are shiny and modern whilst the 319s are older (insert diatribe about “London cast offs” here).

319s manage to deal with the frequent stops/starts of the Thameslink core, they manage to intermingle with 125mph services on the southern reaches of the MML, they manage a few nifty gradients (as referenced by Chief Planner)...

One thing with Airport services is you get a lot of business travellers. A selling point of the train to business travellers is you can work while you're travelling if there are table seats. Lose the table seats and you might lose the type of passenger who'll make more journeys to/from the Airport than the average leisure traveller

Like the Airport travellers who use 319s to get to/from Gatwick and Luton in large number?

The interior of the 319s seems to be good enough for them (?) – or are Mancunian travellers different? Bearing in mind that Manchester Airport already sees Pacers on some departures...

This 319-hating is getting silly.
They are only 3 years older than the saintly 323s which have a very similar passenger environment (2+3).
If LM sent all its 323s to Northern instead of the 319s, would that make everybody happy?
I also fail to see how a 4-car train replacing a (mostly) 2-car train is some kind of unacceptable capacity reduction.
319s are not displacing 185s, and the (nice) 156s will be cascaded to other Northern routes.
What's not to like?

This.

There are plenty of Northern routes where the “spare” 156s could improve things (Clitheroe to Manchester on a 150? Bradford to Manchester on a 142? Sheffield to Lincoln on a 142? Occasional references to Pacers on the Mid Cheshire line?)

Agreed about the 323s being “saintly” too – I’m sure that they were seen as unloved EMUs a few months ago (problems coping with leaves, the “middle seats” being unused and therefore a waste of space) – but now that 319s are on the horizon the 323s are much praised!

Hold on here before I fall off my seat laughing, people complain about overcrowding and not enough seats on services in the north and now that they are getting more trains which offer more seating theyre complaining about that too as they may not get a table?

:lol::lol::lol::lol::lol:

Yup – these longer faster trains aren’t good enough.

Imagine a world where people were getting excited about the fact that 100mph 319s are capable of slotting in between the Virgin services from Wigan to Preston a lot better (than 75mph 156s), which may mean scope for a better service, imagine a world where people were getting excited about four coach trains replacing the (often) single DMUs?

But, now that the 319s are arriving, the 156s have become the “gold standard” of DMUs – almost always running in four coach formation too (if reports on this thread are anything to go by)!

Imagine (for a moment) if it were the other way round - with two coach 75mph trains replacing four coach 100mph trains - we'd no doubt see a few complaints from enthusiasts about "downgrading"...

You can do as much falling off seats as you like. Replacing 156/158/185 services with unrefurbished 319s is a downgrade as far as the average Northern user is concerned. Replacing Pacers with 319s is still a downgrade as the North was due to have new diesel stock as Pacer replacements. Replacing 319s with new anything is an upgrade for London commuters if there is still ten years life left in dual voltage 319s. This does not go down well with Northerners, with an ever widening North/South divide, only having 319s foisted upon them to improve the business case of Thameslink in the south.

Always nice when someone decides to be the voice of “the average Northern user”.

I’d imagine that a significant amount of those “users” (or passengers) couldn’t tell you whether their last journey was by EMU or DMU though.

And the “new diesel stock for the north” idea was one of many unfunded suggestions that the railway has had in recent years – never a promise, never a manifesto commitment – everywhere has its share of such hard luck stories, things that were never delivered or were delivered late.

Look at the SWT 450s that were taken away (and became LM 350s) – with SWT only belatedly getting the promised capacity in the form of cascaded 455s (or “unwanted London cast-offs” as they’d have been known, if they’d gone oop north).

Look at “Thameslink 2000”, and the delays its had...

Well the country seems to be able to afford new rolling stock for the South East.

Routes that have a good business case can generate new rolling stock.

Routes that see less than half of the operating costs met through the farebox (with a subsidy of forty pence per mile) cannot justify new rolling stock.

Nothing to do with any north/south thing.

319s WILL REPLACE 158s ON YORK/SELBY-HUDDERSFIELD CORRIDOR POST 2018. This is retrograde

Are they electrifying the route through Bradford and Brighouse by then? Or are you imagining lots of 158s on the route through Dewsbury?

Imagine Paddington-Cardiff or Euston-Manchester on a 350

Imagine Euston to Crewe on a 350? People seem to cope. But then people cope with a 450 from London to Portsmouth or a 321 from London to Norwich or a 319 from London to Brighton.

Again the North fobbed off with inferior products for the job in hand. Southerners just have no idea about the North

319s aren’t bad units – they’ve been good enough for a very high profile demanding route through London for a long time after all.

The “south” could easily have kept 319s and withdrawn other stock.

it's pretty clear that they will initially go into service with their existing interiors, basic but serviceable, and it's up to the new franchise to decide what do to after that

That sounds like about all that was ever going to happen – Northern aren’t going to shell out large sums at this stage of the franchise cycle – the new TOC will want to put their “stamp” on everything anyway

As to the north-south thing, 15 years ago practically every unit working in Northern England was newer than practically every unit working south of London (with the exception of the Networkers). It's all down to renewal cycles and sensible use of resources.

True

Arguably is the word, newish DMU which intercity style seating, or clapped out very grubby 25 year old EMU with suburban seating, I know which I prefer

Are they definitely going to be clapped out and very grubby? Has that been confirmed?

I don’t remember the same level of complaints about second-hand stock Northern has acquired from elsewhere (LM 150s, FSR 322s etc), but then they weren’t “London cast-offs”, so seemingly didn’t have the same stigma.

And “Intercity style seating”? I thought that the frequent complaints about 185s was that the doors meant that they couldn’t be “Intercity style”?
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
There was a while when it was strongly rumoured that the Manchester to Stoke stopper would be in the hands of LM 350s (with them running a through service to/from Birmingham, with half of the XC trains diverted via Crewe to compensate).

I don’t remember any complaints at the time that these four coach 100mph EMUs wouldn’t be able to cope with the timings of the three coach 90mph 323s.

Now that four coach 100mph 319s are strongly rumoured to be coming to the Stoke route, it’s oft repeated that they won’t be able to accelerate as well as the 323s and will therefore struggle. This was never mentioned when 350s were discussed.

It was Porterbrook (who own the 319s) who actually raised the concerns along with a proposed solution - remove a trailer car and re-engineer them.

350s work well on WCML stopping services, they manage to do the services which call at Hartford and Winsford on a very busy double track section of the WCML. 319s are unproven on WCML stopping services.

Like the Airport travellers who use 319s to get to/from Gatwick and Luton in large number?

The interior of the 319s seems to be good enough for them (?) – or are Mancunian travellers different? Bearing in mind that Manchester Airport already sees Pacers on some departures...

Three points:

1. A downgrade never goes down well with passengers. It doesn't matter if the current type of train is better than used on a similar service in another part of the country, that sort of an excuse for a downgrade isn't accepted by passengers.

2. In the North alternatives to rail aren't always slower. National Express offer services between Liverpool City Centre and Manchester Airport which take 50 minutes. Although, not as frequent as direct rail services. Offer a train people don't like and more may switch to the coach and then NX may be able to justify an increased frequency.

3. In their Regional Market Study Network Rail said Pacers were unsuitable for Airport-Southport services so they shouldn't be used as a benchmark.

Imagine Euston to Crewe on a 350? People seem to cope

They cope because they are travelling for something like £10 and know it would be something like £70 to travel at the same time on Virgin. If you offered £1 flat fares to travel on Pacers then they wouldn't be so unpopular.

I don’t remember the same level of complaints about second-hand stock Northern has acquired from elsewhere (LM 150s, FSR 322s etc), but then they weren’t “London cast-offs”, so seemingly didn’t have the same stigma.

Telegraph and Argus said:
Five “new” electric trains used on the Airedale and Wharfedale lines were sent south from Scotland, he said.

He added: “We find it unreasonable that the fare increases in Yorkshire are higher than the rest of the country when we are not getting new trains. We are not getting the big investment, which is largely in London and the South East. What we are getting is extra trains but they are 20 to 25 years old.”

James Vasey, chairman of Bradford Rail User Group (BRUG), also criticised the fleet. He said: “The problem is that Northern gets hand-me-downs from all over the country, then they get lumbered with fixing them, meaning they cannot run some at peak times.

“Everything we get is usually second hand and, unfortunately the south of England comes first. There is a north-south divide.”
http://www.thetelegraphandargus.co....s__chronic__overcrowding_on_rush_hour_trains/

There's been loads of complaints about the ex-LM 150s at Northern but it was mainly they are in a vastly inferior state to Northern's other 150s. Even more complaints in the South West where the cascade re-introduced 3+2 seating.

The same Telegraph and Argus article comments about the ex-LM 150s but as they wrongly claim they were previously used in London & Birmingham I haven't copied the quote.
 
Last edited by a moderator:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,392
Location
A typical commuter-belt part of north-west England
We've been here before

http://www.railforums.co.uk/showpost.php?p=1365530&postcount=8
http://www.railforums.co.uk/showpost.php?p=1365540&postcount=9

And if we're talking about village stations getting 4 car length trains.

Mossley Down, Greenfield Down, Marsden, Slaithwaite, Mouldsworth, Delamere, Cuddington, Greenbank, Plumley Down, Ashley Down, Hathersage and Grindleford are to get 96m platforms - long enough for modern 4 car trains like Turbostars.

You can add both Plumley (down) and Ashley (down) to my views on both New Lane and Bescar Lane. I note that Goostrey is not deemed worthy of such an improvement to a more modern platform type.
 
Last edited:

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
You can add both Plumley (down) and Ashley (down) to my views on both New Lane and Bescar Lane. I note that Goostrey is not deemed worthy of such an improvement to a more modern platform type.

It doesn't necessarily mean a new platform, unless a new platform is cheaper than extending the existing one.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,904
Location
North
But it was only 2 coaches and was overflowing, even before the crowds got on at St Helens and Huyton.
Lately these trains have seen more 150s on the route, too, so 156 not guaranteed.
Do you want 2 coaches with tables or 4 coaches back to back?

Your displaced 156 will end up on, say, the Liverpool-Oxford Road via CLC service, currently usually a 142.

No, it was 2x2-car 156. I changed at Huyton for Huddersfield into a crush loaded 150. My point is that a 319 will be inferior to a 156 already operating on that route but marginally better than a 150. I want a train that is fit for purpose and an old unrefurbished 319 is not it when refurbed was promised.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,347
Location
Yorkshire
Not being unkind, but 92m train lengths being required at both New Lane and Bescar Lane does seem to have shades of "overkill".

The alternative though, would be to no longer stop trains at these two stations and replace these calls with buses- effectively closing the stations... Or, introduce a shuttle from Southport-Wigan to pick up these stops using a 142/153. Extending the platforms might seem like a waste of money, but presumably less of a waste than the alternative.

We've been here before

http://www.railforums.co.uk/showpost.php?p=1365530&postcount=8
http://www.railforums.co.uk/showpost.php?p=1365540&postcount=9

And if we're talking about village stations getting 4 car length trains.

Mossley Down, Greenfield Down, Marsden, Slaithwaite, Mouldsworth, Delamere, Cuddington, Greenbank, Plumley Down, Ashley Down, Hathersage and Grindleford are to get 96m platforms - long enough for modern 4 car trains like Turbostars.

Mossley, Marsden and Slaithwaite are definitely busy enough to justify 4-car trains. Can't comment on the others listed as I'm not familiar with them but there may well be a few other smaller stations that fall into the same situation as Bescar Lane/New Lane- where the platforms have to be extended to fit in with other busier stations on the route. Deighton is one that springs to mind immediately as is Cottingley (unless it continues to be served by the service via Brighouse as it has been since the recent timetable change), though surprisingly not Ravensthorpe which still has long unused sections of platform at the Leeds end!
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,610
Location
Nottingham
There was a while when it was strongly rumoured that the Manchester to Stoke stopper would be in the hands of LM 350s (with them running a through service to/from Birmingham, with half of the XC trains diverted via Crewe to compensate).

I don’t remember any complaints at the time that these four coach 100mph EMUs wouldn’t be able to cope with the timings of the three coach 90mph 323s.

Now that four coach 100mph 319s are strongly rumoured to be coming to the Stoke route, it’s oft repeated that they won’t be able to accelerate as well as the 323s and will therefore struggle. This was never mentioned when 350s were discussed.

The only real difference I can think of between these four coach 100mph EMUs is that the 350s are shiny and modern whilst the 319s are older (insert diatribe about “London cast offs” here).

The 350 has 50% of axles motored, whereas the 319 only has 25%, meaning that it will have better acceleration in the lower speed ranges (but probably not as good as the 323 with 66%).

The 350 and the 323 have AC motors which sustain acceleration a lot better through the upper end of the speed range than the DC motors on the 319.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,392
Location
A typical commuter-belt part of north-west England
The alternative though, would be to no longer stop trains at these two stations and replace these calls with buses- effectively closing the stations... Or, introduce a shuttle from Southport-Wigan to pick up these stops using a 142/153. Extending the platforms might seem like a waste of money, but presumably less of a waste than the alternative.

Whilst I am not decrying rural stations having platform improvements to access full current train lengths, can someone with knowledge explain to me why a reopened station at Conan Bridge (the former Conan station) had a brand-new platform of the current modern specification constructed of such an inordinately short length, considering the length of the trains that serve that particular station.

Is it one law for Scotland and one law for England, so to speak ?
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Yeah we should just be bloody grateful we are getting anything! That is that one settled! :roll:

Stop moaning that huge swathes of the north are served by 142's, that most of Merseyside is served by some of the oldest units in the country. Don't you know that a couple of routes in the South East have slightly older units!

:roll: :roll: :roll:

I'm not moaning just slightly fed up that people complain they're getting old trains ie the 319s and moan the south always gets new trains.

I am aware the South East has slightly older trains, I do work day in and day out with them <D
 

fowler9

Established Member
Joined
29 Oct 2013
Messages
8,380
Location
Liverpool
:roll: :roll: :roll:

I'm not moaning just slightly fed up that people complain they're getting old trains ie the 319s and moan the south always gets new trains.

I am aware the South East has slightly older trains, I do work day in and day out with them <D

Ha ha, fair play mate. It will be interesting to see them in Liverpool, especially since they will be based down the road from my house in Allerton.
 

b0b

Established Member
Joined
25 Jan 2010
Messages
1,371
350s work well on WCML stopping services, they manage to do the services which call at Hartford and Winsford on a very busy double track section of the WCML. 319s are unproven on WCML stopping services.

319s were most certainly used on the Rugby / Milton Keynes to Gatwick Airport services when Connex got their hands on them early in the franchise.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,312
Location
Herts
If the North really objects to the 319's - good enough for endless years of Bedford - Brighton , then maybe they should stay south and relieve overcrowding here as well as the new units coming here. More than a bit weary of this knocking of these units.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
If the North really objects to the 319's - good enough for endless years of Bedford - Brighton , then maybe they should stay south and relieve overcrowding here as well as the new units coming here. More than a bit weary of this knocking of these units.

Damn right, I'm sure there's places the DfT could use the 319s instead.....<D
 

fowler9

Established Member
Joined
29 Oct 2013
Messages
8,380
Location
Liverpool
If the North really objects to the 319's - good enough for endless years of Bedford - Brighton , then maybe they should stay south and relieve overcrowding here as well as the new units coming here. More than a bit weary of this knocking of these units.

The thing is that whilst I reckon they will improve some services it is easy to say people should be grateful for 319's when you are having them replaced with brand new trains. When was the last time the north got new trains and binned off the old ones to Londons commuter belt?
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,320
Imagine (for a moment) if it were the other way round - with two coach 75mph trains replacing four coach 100mph trains - we'd no doubt see a few complaints from enthusiasts about "downgrading"...

Apart from the speed difference, we had that type of situation 30+ years ago. 2 coach dmus replaced loco hauled stock, or even earlier, centre cars were removed from 1st generation 3 car dmus. Not a popular move for many passengers having to endure greater overcrowding.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,297
Location
Back in Sussex
How are the 319s supposed to prove themselves on WCML stopping services I wonder, I guess they could experiment by using them on the MML for 25+ years to see if they can cope with 100mph running and various stopping patterns, otherwise yes, keep them in the south where they're actually wanted
 

fowler9

Established Member
Joined
29 Oct 2013
Messages
8,380
Location
Liverpool
Pendolinos, with the old 90s/Mk3s going to Liverpool St-Norwich.
Other Mk3s ended up with Chiltern and the HST operators.

That is just assuming the entire country is Londons commuter belt. This is part of the problem. I meant people who live near where they work, not nutters who commute every day from Norwich.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,347
Location
Yorkshire
When was the last time the north got new trains and binned off the old ones to Londons commuter belt?

The DMUs that replaced 2-SUBs on Tyneside (which subsequently joined their classmates down South) were fairly new... But then again the 2-SUBs themselves were of a similar age, so I'm not sure it counts!
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,033
That is just assuming the entire country is Londons commuter belt. This is part of the problem. I meant people who live near where they work, not nutters who commute every day from Norwich.

It was more the point that if you ignorred the outer half of the lines mentioned there are a lot of commutours in the south east that use those trains. Yes there are the odd nutter that commutes from Norwich and Birmingham, but those services call at lots of stations between there and London, many of which are within a reasonable commute.

Using your logic anyone who gets on one of these services isn't counted as a commuter from the south east, even if they get on at High Wycombe or Chelmsford.

Likewise anyone from Reading who benifitted from extra Mark 3's isn't a commuter from the South East. In which case the works at Reading can't be counted in the south east's projects. Meaning that South West (?) has had about £1bn of investment in it, which is why they aren't getting new trains anytime soon.
 

po8crg

Member
Joined
6 Feb 2014
Messages
559
I know people that commute to Manchester on Pendolinos (from Stockport)
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,392
Location
A typical commuter-belt part of north-west England
When all is said and done, once the decision to transfer those chosen members of the Class 319 fleet to Northern Rail, could then immediate action not have been taken to place these units into a rolling programme of full refurbishment on a reasonably staggered time schedule so as not to unduly cause service availability problems. Was not a similar co-ordinated rolling programme carried out on the Northern Rail Class 323 units ?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,610
Location
Nottingham
When all is said and done, once the decision to transfer those chosen members of the Class 319 fleet to Northern Rail, could then immediate action not have been taken to place these units into a rolling programme of full refurbishment on a reasonably staggered time schedule so as not to unduly cause service availability problems.

No, because there aren't enough units to go round as it is. The sooner they go into service the sooner they can start displacing DMUs to where they are needed. Now what was it people keep saying about the Todmorden curve?
 

Moonshot

Established Member
Joined
10 Nov 2013
Messages
3,806
I know people that commute to Manchester on Pendolinos (from Stockport)

Yes there is ....and the main reason for that is that Virgin offer a season ticket ( exclusive to Virgin Services ) that is cheaper than the standard one. Clearly a case where competiton provides excellent value and choice to the customer.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
I know people that commute to Manchester on Pendolinos (from Stockport)

Virgin offer Virgin only tickets which are cheaper than the Any Permitted tickets to fill up the mass of empty seats not required north of Crewe/Stoke for Intercity passengers.
--- old post above --- --- new post below ---
319s were most certainly used on the Rugby / Milton Keynes to Gatwick Airport services when Connex got their hands on them early in the franchise.

So before the VHF WCML timetable was introduced? 158s used to be used on Liverpool-Birmingham and beyond services but whether they could be now is a different question.
--- old post above --- --- new post below ---
If the North really objects to the 319's - good enough for endless years of Bedford - Brighton , then maybe they should stay south and relieve overcrowding here as well as the new units coming here. More than a bit weary of this knocking of these units.

Well I think 200 new diesel carriages before the end of 2012 for the North and South West for additional capacity would have been of more benefit to passengers in both areas. But DfT wanted to find somewhere to send your old 319s.
 

Moonshot

Established Member
Joined
10 Nov 2013
Messages
3,806
As a Northern employee who will no doubt be working these trains once they are put in service, I really couldnt give a damn what they look like or how old they are.....the fact that we are getting some extra carriages to try and accomadate passenenger growth is very welcome. I m certain that more passengers will appreciate actually getting a seat !!
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,392
Location
A typical commuter-belt part of north-west England
No, because there aren't enough units to go round as it is. The sooner they go into service the sooner they can start displacing DMUs to where they are needed. Now what was it people keep saying about the Todmorden curve?

I was not aware that the Class 319 units were currently scheduled to be run over the Todmorden chord.
 
Status
Not open for further replies.

Top