Nym
Established Member
Batman, replaces the wrong stock for pacer scrapping though, we need reigonal diesel stock, LDPE diesel can be life extended HSTs for a few more years.
Batman, replaces the wrong stock for pacer scrapping though, we need reigonal diesel stock, LDPE diesel can be life extended HSTs for a few more years.
I never thoguht about that. And you'd give Leicester, Loughborough and East Midlands Parkway a direct train to Yorkshire.
If Sheffield-Leeds was to be completely electrified we could see a third tph being put in to Leeds from London
I never thoguht about that. And you'd give Leicester, Loughborough and East Midlands Parkway a direct train to Yorkshire
This could happen now TBF and doesn't need electrification. Like my favourite train for sneaking into London in the morning, the 06:34 Leeds > St Pancras, which usually has £22 advances available until a couple of days before, by which time the cheapest EC advance with a comparable arrival in London costs a King's ransom.
If Sheffield-Leeds was to be completely electrified we could see a third tph being put in to Leeds from London, the times probably couldn't come close to competing but you never know.
I'm sure many people would use the slower service if the fares were low enough e.g. Leeds - London 'EMT Only' for £20 less than the EC fare.
Replace the Nottingham and Corby Diagrams with electrification and a new order for Cl390s to fill the gap until after the HS2 decision is taken, if tilting cannot be implemented on the MML in the medium term they could then be sent to ICWC and more suitable stock purchased.
Isn't Nottingham one of the big bugbears with MML electrification, as there is not enough overhead room so they'd need to dig, build new platforms etc. etc.?
How many diesel units are going to be freed by building HS2? Many of the routes that will use HS2 in the future already use electric traction. It's also possible that the HSTs could remain in service until 2035 by which time the 22x units will be getting on a bit and any cascade of them would only be a short term fix.I get the feeling that it will either have the MML done or an exception on some stock until 2025 (HSTs) until HS2 and MML Electrification frees up a shed tonne of LDPE DEMU/EDMU Units.
There's more to "Yorkshire" than Leeds...![]()
Really? Don't BBC Look North think the opposite?
There's more to "Yorkshire" than Leeds...![]()
Can this new order of class 390s be built with windows this time please?
Not the REAL Look North (based in Newcastle)
The one in Leeds is Look Yokshire!![]()
Yorkshire is so big it has it's own variations within it's own county.
In the statement, which was published alongside updated versions of the National Infrastructure Plan and the Plan for Growth, George Osborne announced £5 billion of investment in infrastructure, of which £1.4 billion was additional investment in rail infrastructure. We have been talking to the Government throughout this process, and headlines of particular relevance to Network Rail include:
o £290 million to electrify the North Transpennine route from Manchester to Leeds – Network Rail will develop the scheme in more detail and begin early enabling works where these can be delivered efficiently
o £270 million for a link between Oxford and Bedford – Network Rail will develop the scheme with the existing consortium
o £390 million of enhancement and renewal works to improve stations and infrastructure, improve resilience against extreme weather and tackle problems more quickly – this includes additional contributions to the NRDF and Access for All funds, plus the acceleration of structures renewals
‘As we know, rail freight plays a crucial part in our economy. This has been unambiguously recognised by the Government today, with relevant announcements including:
o Network Rail has been asked to support the development of a network of strategic rail freight interchanges (SRFIs), working with the wider logistics industry to speed up the delivery of SRFI sites to meet business demand; assist with funding; and establish appropriate delivery vehicles for rail infrastructure elements of such proposals.
o The Government will also support Network Rail in investing £55 million in the Strategic Freight Network, including the Ely-Soham doubling scheme, which will remove a bottleneck on the Felixstowe-Nuneaton route, and gauge clearance of additional freight routes in the Midlands between Syston Junction and Stoke.
‘The Chancellor also announced funding for other improvements affecting the railway, including:
o £5 million to set up a nationwide taskforce to target metal thieves and scrap metal dealers who illegally trade in stolen metal
o £45 million to extend smart ticketing across London and the South East
o £80 million to support the Southern Rail franchise’s procurement of 130 new carriages
o £290 million to limit the increase to regulated rail and Transport for London fares in January 2012 to RPI+1% rather than RPI+3%
The Hull TPE would need to become a Liverpool (rather than the possible Chester) to stay EMU.
Really? Don't BBC Look North think the opposite?
You sure about that?
seems like Sheffield is in some sort of black hole which no one can see.
we might know what 'North Transpennine' means, but most people/journos etc. won't, so it makes sense for the government to identify two big cities in the north and use them as the terms of reference for the project. Manchester & Leeds makes sense.
Not electrifying to Hull, Scarborough and Middlesbrough would be lunacy, so I'm sure they'll be part of it.