tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Wait a minute, no you wouldn't, you could operate it with exactly the same paths as there already are: The Middlesborough XC service could run in the path on the fast lines of the current Newcastle XC service, and the Middlesborough local service could run in the path on the slow lines currently used by the Middlesborough TPE service, providing that they work out alright in terms of time apart from each other.

That sounds easiest - just swap the "Leeds - Newcastle" bit of XC with the "Leeds - Middlesbrough" bit of TPE, no new paths/units needed.

Middlesbrough retains its link to Leeds, the Edinburgh XC traffic is now on the "via Doncaster" service (extended north of the Border) that is roughly 15 minutes faster.

Leeds - Newcastle is now part of a half-hourly Manchester - Newcastle EMU service (rather than two different TOCs).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Batman

Member
Joined
27 Jun 2011
Messages
497
Location
North Birmingham
Wait a minute, no you wouldn't, you could operate it with exactly the same paths as there already are: The Middlesborough XC service could run in the path on the fast lines of the current Newcastle XC service, and the Middlesborough local service could run in the path on the slow lines currently used by the Middlesborough TPE service, providing that they work out alright in terms of time apart from each other.

No, because there will be a second TPE tph to Newcastle.

Correct me if I'm wrong, but I believe the corrent services that opperate between York and Northallerton are;

2tph EC - 1 to Edinburgh, 1 to Newcaslte.

2tph XC - 1 to Glasgow, 1 to Newcastle.

2tph FTPE - 1 to Newcastle, 1 to Middlesborough.

So 6tph in total.

Under the proposal there will be 7 tph between York and Northallerton as follows;

2tph EC - as present.

2tph XC - 1 to Edinburgh, 1 to Newcastle.

3tph FTPE - 2 to Newcastle and the York - Middlesborough stopper.

So an extra parth will be required.

So whole reason why this problem came up is the removal of Scraborough and Middlesborough from the main FTPE network because of electrification and the need to provide a service at local stations between Middlesborough and Northallerton.
 

4SRKT

Established Member
Joined
9 Jan 2009
Messages
4,409
Well, obviously I forgot about Yarm. It would just get the XC workings.

Are paths really much of an issue on the 4-track section of the ECML between York and Northallerton? I seriously doubt it, especially on the slows.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
I would hope for a second pair of Platforms at Northallerton so TPE trains can stop using that flat junction but I suppose thats a pipe dream.

I agree with that, and it's not all that difficult compared with some of the other huge costs involved. I'd also want a platform on the up goods loop at Darlington, and not a closure of the loop like they did as Swindon, so that goods trains can still use it. Still, that would require a big, new footbridge and lots of facilities, so it's less likely.
--- old post above --- --- new post below ---
That sounds easiest - just swap the "Leeds - Newcastle" bit of XC with the "Leeds - Middlesbrough" bit of TPE, no new paths/units needed.

Middlesbrough retains its link to Leeds, the Edinburgh XC traffic is now on the "via Doncaster" service (extended north of the Border) that is roughly 15 minutes faster.

Leeds - Newcastle is now part of a half-hourly Manchester - Newcastle EMU service (rather than two different TOCs).

That sounds quite convenient, I like it.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
That sounds quite convenient, I like it

It would mean no additional trains needed, it would speed up the Birmingham - Edinburgh journey and it would allow Middlesbrough to retain its Leeds link.

Bad news if you live in Sheffield (as a second Newcastle service an hour is probably of more use than a service to Teesside), but I'm trying not to be selfish :lol:
 

philjo

Established Member
Joined
9 Jun 2009
Messages
3,011
New stations for Kirkstall Forge & Apperley Bridge also approved.
an EMU stopping service from Bradford FS to York could operate to create an East-West Leeds "crossrail"
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,069
Location
Redcar
Table 3.C (Page 46) of the National Infrastructure Plan mentions North Trans Pennine electrification rather than just Manchester - Leeds, so it does seem like the wires will be going onto Hull/Middlesbrough at least.
 

Statto

Established Member
Joined
8 Feb 2011
Messages
4,061
Location
At home or at the pub
Imo, it's short sighted that the Liverpool-Manchester via Warrington line isn't included in the Electrification programme as well as the line via Chat Moss, Warrington branch is heaving most of the day, also a handy diversion if the Chat Moss route is off, & vice versa.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,782
Location
Somewhere, not in London
But not accessable from the future TPE network without a reversal at Oxford Road, and the path will be used to provide an additional semi fast terminating at Manchester Aiport or Piccadilly, meaning less national passengers on the local route, kind of like what is happening with Bolton.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
But not accessable from the future TPE network without a reversal at Oxford Road

Statto mentioned it as a diversion. During engineering works now Liverpool TPE services divert via Victoria and Newton-le-Willows instead of via Piccadilly and Warrington Central. In the future the reverse will be true if they electrify the Warrington line and if they don't they will need to use more replacement buses during engineering works.
 
Last edited by a moderator:
Joined
26 Oct 2010
Messages
187
Location
Darlington
I agree with that, and it's not all that difficult compared with some of the other huge costs involved. I'd also want a platform on the up goods loop at Darlington, and not a closure of the loop like they did as Swindon, so that goods trains can still use it. Still, that would require a big, new footbridge and lots of facilities, so it's less likely.
--- old post above --- --- new post below ---


That sounds quite convenient, I like it.


If they ever proceed with the Tees Valley Metro (which lets face it they won't). I believe that they are going to build new terminating platforms here to avoid the Darlington-Saltburn trains having to cross the mainline.

If there was any money for this though, I would seriously alter the entire layout of Darlington station, retaining only the original parts of the engine shed, moving the station west so it straddles the fast lines, with bay platforms on the far west side for terminating services (perhaps a bay platform for Bish services too under the existing engine shed). And then convert under the existing eastern side of the station into parking and office space.

But this isn't really for this thread. I just carried on typing. :oops:
 

Statto

Established Member
Joined
8 Feb 2011
Messages
4,061
Location
At home or at the pub
Statto mentioned it as a diversion. During engineering works now services Liverpool TPE services divert via Victoria and Newton-le-Willows instead of via Piccadilly and Warrington Central. In the future the reverse will be true if they electrify the Warrington line and if they don't they will need to use more replacement buses during engineering works.

My feeling is that the line via Warrington as well as Chat Moss should be electrified, not doing so is short sighted.
 

PhilipW

Member
Joined
6 Feb 2008
Messages
761
Location
Fareham, Hants
My feeling is that the line via Warrington as well as Chat Moss should be electrified, not doing so is short sighted.

It probably will be in the long run. I rather think that Network Rail have their hands full at the moment doing what is already announced. The decisions have been made, let's see Network Rail deliver them.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,782
Location
Somewhere, not in London
And the CLC will become an inter-reigonal link important to Warrington, Liverpool, Manchester and Salford, where as the Chat Moss is of National importance as part of the TPE network from Newcastle to Liverpool and Manchester to Scotland, therefore given priority.
 

PR1Berske

Established Member
Joined
27 Jul 2010
Messages
3,025
Geek that I am - if Apperley Bridge is built, there's enough three letter codes free to allocate to it :D 8-)


Kirkstall Forge could be KIS (KIR already taken)


Now, back to the proper discussion :D
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
XC used to serve local stations between Macclesfield and Stoke before an all day Manchester-Stoke stopper was introduced in 2008.

Just Congleton I think once every two hours. No calls were made at any point at Kidsgrove or Longport.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I wonder if this is just a case of the following logic....

We are electrifying Liverpool-Victoria, but thats difficult on terminating services.
So we extend the electification to Stalybridge so they can turnaround there.
If we are extending it to Stalybridge why not extend it all the way to Leeds.

£270m budget for North TPE makes this by length by far the most expensive electrification scheme.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Also notice that this strengthens (ever so slightly, but every little helps) the case for letting Bombardier convert the Voyagers to bimode.

Offtopic but look at standard-hour Voyager services:

Birmingham–Glasgow/Edinburgh: 100% under wires.
London–Chester (pan down at Crewe): 88% under wires.
London–Holyhead (pan down at Crewe): 60% under wires.
Bournemouth–Manchester (pan up at Coventry): 39% under wires (assuming dual voltage isn't possible)
Southampton/Reading–Newcastle (pan up at Doncaster): 32%/37% under wires
Bristol–Manchester (pan up at Birmingham): 48% under wires
Plymouth–Edinburgh/Glasgow:
(pan up at York pre-electrification): 36%/43% under wires
(pan up at Wakefield post-electrification): 42%/49% under wires
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Also notice that this strengthens (ever so slightly, but every little helps) the case for letting Bombardier convert the Voyagers to bimode.

Offtopic but look at standard-hour Voyager services:

Birmingham–Glasgow/Edinburgh: 100% under wires.
London–Chester (pan down at Crewe): 88% under wires.
London–Holyhead (pan down at Crewe): 60% under wires.
Bournemouth–Manchester (pan up at Coventry): 39% under wires (assuming dual voltage isn't possible)
Southampton/Reading–Newcastle (pan up at Doncaster): 32%/37% under wires
Bristol–Manchester (pan up at Birmingham): 48% under wires
Plymouth–Edinburgh/Glasgow:
(pan up at York pre-electrification): 36%/43% under wires
(pan up at Wakefield post-electrification): 42%/49% under wires

Interesting figures, but are you forgetting that Reading - Oxford will be electrified too? Or are you saying that you wouldn't bother putting the pantograph up for such a short section?
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Or are you saying that you wouldn't bother putting the pantograph up for such a short section?

Indeed I am (although I think it was a mistake not to extend the Thames Valley electrification to Banbury and Basingstoke so all the Thames Turbos can be cascaded). I'm also not bothering raising the pantograph for Bristol Temple Meads–Parkway :lol:
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Indeed I am (although I think it was a mistake not to extend the Thames Valley electrification to Banbury and Basingstoke so all the Thames Turbos can be cascaded). I'm also not bothering raising the pantograph for Bristol Temple Meads–Parkway :lol:

...or Barnt Green to Birmingham New Street :lol:
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,269
Also notice that this strengthens (ever so slightly, but every little helps) the case for letting Bombardier convert the Voyagers to bimode.

Offtopic but look at standard-hour Voyager services:

Birmingham–Glasgow/Edinburgh: 100% under wires.
London–Chester (pan down at Crewe): 88% under wires.
London–Holyhead (pan down at Crewe): 60% under wires.
Bournemouth–Manchester (pan up at Coventry): 39% under wires (assuming dual voltage isn't possible)
Southampton/Reading–Newcastle (pan up at Doncaster): 32%/37% under wires
Bristol–Manchester (pan up at Birmingham): 48% under wires
Plymouth–Edinburgh/Glasgow:
(pan up at York pre-electrification): 36%/43% under wires
(pan up at Wakefield post-electrification): 42%/49% under wires

No Pan up at Wakefield to Leeds? Isnt that roughly half an hour of electric running you are throwing away there?
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
If you dawdle a bit, Wakefield Westgate is maybe 15 minutes from Leeds. Timing in the power change, then putting the pan down again at Leeds and back up at York would be a bit wasteful, but with any luck Leeds to York will be pushed for as an early part of North TP for the flexibility it would bring to the ECML generally.
 

calc7

Established Member
Joined
8 Aug 2011
Messages
2,097
No Pan up at Wakefield to Leeds? Isnt that roughly half an hour of electric running you are throwing away there?

Often done it in 10-11 mins, especially when going out of Leeds.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,782
Location
Somewhere, not in London
Need I mention that the only inconvenience is starting and stopping generators, could just have all the generator idle for the time under wires if it's a short time, then fire up properly to generate when the wires end...
 

Batman

Member
Joined
27 Jun 2011
Messages
497
Location
North Birmingham
I've state on other threads before that when the MML is electrified, Sheffield to South Kirby junction needs to be electrified as well, so that XC services can pan up at Derby.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,269
I've state on other threads before that when the MML is electrified, Sheffield to South Kirby junction needs to be electrified as well, so that XC services can pan up at Derby.

If Sheffield-Leeds was to be completely electrified we could see a third tph being put in to Leeds from London, the times probably couldn't come close to competing but you never know.
 

Batman

Member
Joined
27 Jun 2011
Messages
497
Location
North Birmingham
If Sheffield-Leeds was to be completely electrified we could see a third tph being put in to Leeds from London, the times probably couldn't come close to competing but you never know.

I never thoguht about that. And you'd give Leicester, Loughborough and East Midlands Parkway a direct train to Yorkshire.

I still think MML electrification should have taken priority over Trans Pennine.

So does this now make it almost certain that the MML will be the next big electrification project to be announced, possible in the 2015 spending review?
 