androdas

Member
Joined
3 Aug 2011
Messages
310
Location
The Winning
The press releases (haven't watched the video) don't actually mention funding being approved.
Northumberland County Council official video here:
at around the 1:00 mark the leader of the council Glen Sanderson confirms that the minister has fully funded the project and the council has provided more money towards it as well.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,712
at around the 1:00 mark the leader of the council Glen Sanderson confirms that the minister has fully funded the project and the council has provided more money towards it as well.

Both those statements can’t be correct - if the minister (ie central Government) has fully funded the project, then the council wouldn’t need to provide more money!
 

WesternBiker

Member
Joined
26 Aug 2020
Messages
692
Location
South Cambridgeshire
Northumberland County Council official video here:
at around the 1:00 mark the leader of the council Glen Sanderson confirms that the minister has fully funded the project and the council has provided more money towards it as well.
Presumably he meant "all the money [they said they would] ...". Or that the Council money "to help it on its way" covers non-core expenditure?

As ever, it would be nice to see all the costs and funding clearly side by side.
 

androdas

Member
Joined
3 Aug 2011
Messages
310
Location
The Winning
Presumably he meant "all the money [they said they would] ...". Or that the Council money "to help it on its way" covers non-core expenditure?

As ever, it would be nice to see all the costs and funding clearly side by side.
It would be nice and make things a lot clearer. I think with this project being led by Northumberland CC rather than central government they are funding a lot of the enabling works such as Highways / car park improvements.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,088
Location
West Wiltshire
Don't think it has been linked yet, the planning application for Charfield, South Gloucestershire station was approved last week

 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,744
Updates:
Charfield - planning permission granted, as per preceding post.
Beaulieu Park - under construction- as per post in that thread.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,515
Location
Northampton

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
You mean East Linton, I think.
Oops. Senior moment, Corrected

== Doublepost prevention - post automatically merged: ==

Rarely have I seen a photo of a person less comfortable in PPE. I'd like to know what the explanation was for an uncovered footbridge in Scotland though.
Why? We're not in the Arctic and East Linton will be drier than a lot of England and Wales.
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,744

A photo op for the local MSP for Reston Says that it's opening in March 2024, but a response suggests that the replacement of Markle LC may delay this.

Is there an election soon?

2022 press release when work started:
Planned to be complete in 2023.

Previous note on the Scotland's railway website:
We would anticipate that the station will be open by March 2024 – the end of our current five-year funding period – at the latest. We will though work with our stakeholders and partners to pull this date forward if possible.
 

gazr

Member
Joined
24 Mar 2014
Messages
560
According to RTT, the 3Alpha (CRS) codes for the three new Birmingham stations are Kings Heath (KIH), Moseley Village (MOV) and Pineapple Road (PIR), if someone can verify and update OP.

Edit: The 3Alpha for Beaulieu Park (BEU) (in the OP) is already assigned to Beaulieu Road, so I'm guessing that is an error?
 
Last edited:

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,744
According to RTT, the 3Alpha (CRS) codes for the three new Birmingham stations are Kings Heath (KIH), Moseley Village (MOV) and Pineapple Road (PIR), if someone can verify and update OP.

Edit: The 3Alpha for Beaulieu Park (BEU) (in the OP) is already assigned to Beaulieu Road, so I'm guessing that is an error?
My mistake, no code allocated yet for Beaulieu Park, at least not in RTT where I source the information.
The other three noted and updated along with Willenhall [WIA].
 

mr_moo

Member
Joined
7 Sep 2009
Messages
648
Location
Cambridgeshire
Not sure if Cambridge South counts as being under construction now? There's a big compound, works on site, piles going in the ground, materials storage etc all going on. Mainly associated stuff at present - OLE, cabling, site clearance etc etc - no civils works for platforms etc yet, but I think that's still 'under construction'?
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,744
Not sure if Cambridge South counts as being under construction now? There's a big compound, works on site, piles going in the ground, materials storage etc all going on. Mainly associated stuff at present - OLE, cabling, site clearance etc etc - no civils works for platforms etc yet, but I think that's still 'under construction'?
Yes. If a project has moved beyond putting up a boundary fence, a compound and basic site clearance that'll do me.
 

gazr

Member
Joined
24 Mar 2014
Messages
560
Found another possible error. Cambridge South - I very much doubt CMS is the CRS as it's assigned to Cambridge Carriage Servicing Depot (unless this is no longer used?)
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,744
Realtime Trains has it as CMS.
Found another possible error. Cambridge South - I very much doubt CMS is the CRS as it's assigned to Cambridge Carriage Servicing Depot (unless this is no longer used?)
 

SargeNpton

Established Member
Joined
19 Nov 2018
Messages
1,726
"CMS" being allocated to a carriage sidings would be unlikely. Locations that are not for passenger use would normally have a CRS code in the X__ series.

In my source data I can, however, see CMS allocated to Cambridge South, with TIPLOC CAMBSTH and NLC 3181.
 

gazr

Member
Joined
24 Mar 2014
Messages
560
"CMS" being allocated to a carriage sidings would be unlikely. Locations that are not for passenger use would normally have a CRS code in the X__ series.

In my source data I can, however, see CMS allocated to Cambridge South, with TIPLOC CAMBSTH and NLC 3181.

Thanks for the info. I was going off info found on this site: http://charlwoodhouse.co.uk/rail/liverail/full/CAMBSTH/21/03/23 (which I have found to be a very useful resource)

Apologies :oops:
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
Construction of the new Barrhead South station is now due to start in Spring 2024, with completion 18 months later. The council is to give further details tomorrow.

To avoid confusion, this is on the (already electrified ) line to Neilston, not the (being wired) line to Barrhead.
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
Weekly notice states that 'Portway Park & Ride (P&R)' [sic] will be brought into use on 3 April. That doesn't necessarily mean first public trains then.
 

ian1944

Member
Joined
13 Dec 2012
Messages
691
Location
North Berwick
Is there an election soon?

2022 press release when work started:


Previous note on the Scotland's railway website:
Craig Hoy is a Tory ex-cooncillor for East Lothian. He is now in the happy position of blaming every thing bad on the (SNP) Scottish government and attaching everything good to the (Tory) UK government. Lest I be accused of bias, I think they're all shameless opportunists.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,350
Location
Yorkshire
Planning Permission was granted for Elland on 28 February.
Was this a new application or a renewal of previous permission to prevent it lapsing? Either way, there's still the small matter of funding to be secured I believe, unless that's already been approved by the Mayoral office.

I wonder how often people will book tickets to Elland thinking it's convenient for a certain football ground. I remember reading years ago a property column in the Grauniad which described Elland as "a suburb of Leeds" despite having plenty of photos and maps included in the article which showed their error! ;)
 

AndyHudds

Member
Joined
17 Jun 2012
Messages
601
Was this a new application or a renewal of previous permission to prevent it lapsing? Either way, there's still the small matter of funding to be secured I believe, unless that's already been approved by the Mayoral office.

I wonder how often people will book tickets to Elland thinking it's convenient for a certain football ground. I remember reading years ago a property column in the Grauniad which described Elland as "a suburb of Leeds" despite having plenty of photos and maps included in the article which showed their error! ;)
You know everything moves at a glacial pace in West Yorkshire on the railway.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,088
Location
West Wiltshire
Seems the proposed Devizes station has become seen as poor value for money, and therefore presumably won't be proceeding for time being

 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
Seems the proposed Devizes station has become seen as poor value for money, and therefore presumably won't be proceeding for time being

It's not 'poor value for money', but is in a rather interesting situation. It's reasonable value for money if a suitable train service existed already and is just an add-on. It's only poor value if the station has to fund the new service too (with other infrastructure changes to make it work).
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,515
Location
Northampton
It's not 'poor value for money', but is in a rather interesting situation. It's reasonable value for money if a suitable train service existed already and is just an add-on. It's only poor value if the station has to fund the new service too (with other infrastructure changes to make it work).
It's not the only station in that position. However if the existing service can't be amended suitably, how else should the changes be billed if the sole driver would be to enable a service at a new station?
 

Top