Thank you to my predecessors for initially creating and then taking on the updating of this thread.
This first post lists only those stations considered to have a good chance of being delivered in a reasonable timescale. I have taken the list ‘as is’ at December 2020 and will update it when there is new information from a reliable source, which essentially means a public statement by Network Rail or a TOC. Statements by a funding body, a development partner, a Local Authority or Government will also be considered.
Post 254 provides a list of all the stations discussed in this thread up to the end of December 2020 (65 in total). In preparing to take over the thread I have identified over 150 ‘proposed stations’ plus a number of ‘proposed lines’ where individual stations are not listed. Some of these proposals are very speculative (wouldn’t it be a good idea if …..), others were serious proposals which appear to have fallen by the wayside.
For the latest updates please refer to the latest thread posts, for the up-to-date comprehensive summary refer to the following table.
There is a separate thread for the more speculative proposals: New Stations and Schemes - a comprehensive list of speculative proposals
Note: Updates will be mentioned in a new post at the end of the thread, and reflected in the above table.
This first post lists only those stations considered to have a good chance of being delivered in a reasonable timescale. I have taken the list ‘as is’ at December 2020 and will update it when there is new information from a reliable source, which essentially means a public statement by Network Rail or a TOC. Statements by a funding body, a development partner, a Local Authority or Government will also be considered.
Post 254 provides a list of all the stations discussed in this thread up to the end of December 2020 (65 in total). In preparing to take over the thread I have identified over 150 ‘proposed stations’ plus a number of ‘proposed lines’ where individual stations are not listed. Some of these proposals are very speculative (wouldn’t it be a good idea if …..), others were serious proposals which appear to have fallen by the wayside.
For the latest updates please refer to the latest thread posts, for the up-to-date comprehensive summary refer to the following table.
There is a separate thread for the more speculative proposals: New Stations and Schemes - a comprehensive list of speculative proposals
| Opened in 2026 | Status | Location | Baker Atlas page / grid ref | Notes | |
| Northumberland Park [NOP] | opened 22 February 2026 | Northumberland Line | 54 B1 | Discussion here | |
| Darlaston [DAS] | opened 19 March 2026 | between Walsall and Wolverhampton | 76 A2 | Discussion here. | |
| Willenhall [WIA] | opened 19 March 2026 | between Walsall and Wolverhampton | 24 A2 | Discussion here | |
| Bedlington [BEJ] | opened 29 March 2026 | Northumberland Line | 54 A1 | Discussion here | |
| Kings Heath [KIH] | opened 7 April 2026 | between Birmingham New Street and Kings Norton (Camp Hill Route) | 24 B2 | Latest discussion here | |
| Moseley Village [MOV] | opened 7 April 2026 | between Birmingham New Street and Kings Norton (Camp Hill Route) | 77 D1 | Latest discussion here | |
| Pineapple Road [PIR] | opened 7 April 2026 | between Birmingham New Street and Kings Norton (Camp Hill Route) | 24 B2 | Latest discussion here | |
| Cambridge South [CMS] | opened 28 June 2026 | between Cambridge and Shelford | 27 C1 | Discussion here | |
| Okehampton Interchange [OKI] | opened 1 August 2026 | between Sampford Courteney and Okehampton | 4 D1 | Being discussed here and here. | |
| 2026 and beyond (dated) | Anticipated opening date | Status | Location | Baker Atlas page / grid ref | Notes |
| Balgray [BGY] (was Barrhead South) | 27 September 2026 | under construction | between Whitecraigs and Neilston | 86 C1 | Discussion here. |
| Bristol Brabazon [BBZ] (was North Filton) | 2026 | under construction | between Filton Abbey Wood and St Andrews Road | 75 B2 | Discussion here. |
| Winslow [WNO] | no date given | under construction | between Bicester and Bletchley | 26 D1 | Discussion here Previously 'late 2024' |
| White Rose [WRO] | January 2027 (possibly) | construction paused | between Cottingley and Morley | 42 B1 | Discussion here. New Stations Fund - 'round 4', was 'delayed', previously 'later in 2024', prior to that 'early 2024'. |
| Charfield | Spring 2027 | under construction | between Yate and Cam & Dursley | 16 B1 | Discussion here |
| Butetown [BUN] | mid 2027 | under construction | between Queen Street and Cardiff Bay | 74 B2 | General South Wales Metro discussion here. A completion date of mid 2027 is now being suggested, originally 2024. |
| Ravensthorpe [RVN] (relocation) | Summer 2028 | route works commenced | between Mirfield and Dewsbury | 42 B1 | Relocation as part of Trans-Pennine Route Upgrade |
| Pill [PIA] | late 2028 | route works commenced | branch from Parson Street | 15 C2 | Discussion here |
| Portishead [POH] | late 2028 | route works commenced | branch from Parson Street | 15 C2 | Discussion here |
| Birmingham Curzon Street | 2036 - 2039 | under construction | HS2 | 24 A2 | Previously 2029 - 2033 |
| Birmingham Interchange | 2036 - 2039 | route works commenced | HS2 | 25 B1 | Discussion here previously 2029 - 2033 |
| Old Oak Common | 2036 - 2039 | under construction | HS2 | 96 B1 | Previously 2029 - 2033 |
| Other proposals being progressed | Status | Location | Baker Atlas page / grid ref | Notes | |
| Cardiff Parkway | undated | planning permission granted | between Cardiff Central and Newport | 15 C1 | Discussion here. All previous completion dates (2022, 2023 and 2024) have passed with no spades in the ground. |
| Cottam Parkway | undated | planning permission granted | between Preston and Salwick | 40 B2 | Discussion here. A completion date of '2030 at the latest' has been suggested. |
| Cowley | undated | proposed | freight branch south of Oxford | 17 B2 | Discussion here. A completion date of 2030 has been suggested. |
| Crwys Road | undated | prior approval granted | between Queen Street and Heath High Level | 74 B2 | General South Wales Metro discussion here. Completion dates of 2023, 2024, 2025 and now 2028 have been stated. |
| Cullompton | undated | proposed | between Tiverton Parkway and Exeter St Davids | 4 C2 | Transport funding announcement, July 2025. A completion date of 2028 has been suggested. |
| East Leeds Parkway / Thorpe Park | undated | proposed | between Cross Gates and Garforth | 42 A2 | New Stations Fund - 'round 4'. A completion date of 2025 was envisaged. A new consultation has launched, discussion here. |
| Edginswell | undated | planning permission granted | between Newton Abbot and Torre | 3 B2 | New Stations Fund - round 3. A completion date of 2024 was suggested. |
| Elland [ELN] | undated | planning permission granted | between Brighouse and Halifax / Sowerby Bridge | 42 B1 | Discussion here. Completion dates of 2024, 2025, 2026, 2028 and now 2029 have been stated. |
| Gabalfa | undated | proposed | between Cathays and Llandaf | 74 B2 | A completion date of 2028 has been suggested. |
| Golborne | undated | planning permission granted | between Wigan North Western and Warrington / Newton-le-Willows / Patricroft | 41 C1 | Discussion here. A completion date of 2027 has been suggested. |
| Haxby P & R | undated | planning application submitted | between York and Malton | 48 D2 | Discussion here. New Stations Fund - round 3. A completion date of 2026 has been suggested. |
| Henbury | undated | planning permission granted | between Filton Abbey Wood and St Andrews Road | 75 B1 | A completion date of 2028 (previously 2025/26) has been suggested. |
| Leeds Bradford Airport Parkway | undated | proposed | between Horsforth and Bramhall Tunnel | 42 A1 | Most recent discussion here. A completion date of 2025 was previously suggested. |
| Littlemore | undated | announced | freight branch south of Oxford | 17 B2 | Discussion here. A completion date of 2030 has been suggested. |
| Liverpool Baltic [LVB] | undated | planning permission granted | between Liverpool Central and Brunswick | 80 C2 | Most recent discussion here. Completion dates of 2027, 2028 and now 2029 have been suggested. |
| Surrey Canal [SCE] [was Surrey Canal Road or New Bermondsey] | undated | planning permission granted | between Queens Road Peckham and Surrey Quays | 97 C2 | Discussion here. A completion date of early 2025 was previously suggested. |
| Waterbeach [WBC] (relocation) | undated | planning permission granted | between Waterbeach (current) and Ely | 27 C2 | A completion date of 2027 has been suggested. |
| Waverley (South Yorkshire) | undated | proposed | between Darnall and Woodhouse | 79 C2 | Restoring Your Railway: Ideas Fund Round Two. |
| Wellington [WLQ] | undated | proposed | between Taunton and Tiverton Parkway | 5 B1 | Transport funding announcement, July 2025. Completion dates of 2025, 2026 and now 2028 have been suggested. |
| Wixams | undated (was 2026) | construction paused | between Bedford and Flitwick | 26 D2 | Old discussion here, current discussion here. Construction paused, the Universal theme park proposals (may) significantly impact the proposed station. |
Note: Updates will be mentioned in a new post at the end of the thread, and reflected in the above table.