Will they ever sort out the weekend timetable? Even to Chester on a Saturday, it's dismal.
[/QUOTE] Jones Bangor/The WG aren't really pushing for North Wales electrification, I don't think the current Transport Secretary gets rail, and is very road focused....he seemed quite good when he first got the job, but I suspect now it's beyond his capability to deliver for rail - the current Wrexham - Saltney redoubling is the result of his predecessors hard work. Cheryl Gillan, ex Welsh Secretary, delivered South Wales wires.....
The driver is there now because the Welsh Secretary - part of UK Government and an MP for Clwyd West on the route - is pushing hard.
If the North Wales route was electrified, would this mean reinstatement of the lines to the North of Prestatyn station as I suspect that with electrification you could increase line speeds, but there would be a need for further points where slower trains can be passed?
The north of Prestatyn is actually in the sea [!], but I gather there are plans to reinstate the up through line at Rhyl, allowing up trains as well as down, to pass here.
I haven't heard of any plans to restore the four-track formation anywhere else along the coast.
Maybe I should have phrased it as the North Side of the station where the tracks where removed.![]()
That was platform one, two & three were the island, not sure if they have been renumbered? with defunct platform four to the South.
The days when Euston Holyhead had a simple change of engines at Crewe! Sometimes with decisions on stock procurement, we have gone backwards. The case for North Wales Electrification is more aspirational than necessary.Although if I lived along the route, then clearly I would not want to be missing out!
The north of Prestatyn is actually in the sea [!], but I gather there are plans to reinstate the up through line at Rhyl, allowing up trains as well as down, to pass here.
I haven't heard of any plans to restore the four-track formation anywhere else along the coast.
Will they ever sort out the weekend timetable? Even to Chester on a Saturday, it's dismal.
Mostyn's loops are to be reinstated, with Holywell Jn's loops taken up. The down platform avoiding line at Abegele will be removed as well. It strikes me as a little odd to provide platform avoiding lines at busy Rhyl while removing them from quiet Abergele. I can only assume that this is to provide for more Junction-Chester fast services in the future.
Ah, thank you for that information.
Presumably then the down line at Abergele will be slewed to serve the platform[like the up]. That will at least remove the current severe restriction for the turnout on to the platform line.
from North Wales Rail website 5th Feb written by Charlie Hume the Editor
The broken rail discovered at Llysfaen on Friday 25 January and caused major delays that evening. Single-line working was introduced between Rhyl and Llandudno Junction until the break could be repaired. This could have been a lot worse, as the train following would have passed over it at 85 mph, but instead only the front bogie of the following train ran over it at low speed after being asked by the signaller at Abergele to examine the line.
It can be seen that the failure as occurred at a welded joint. It has to be said that in these days of ultrasonic testing such breaks in service are very rare.
It would probably be better and cheaper to take up the current passenger loop line and extend the platform to the current through line as they did at Bisceter North on the Chilterns
The line does not warrant a more intensive service - Just a reliable one so the investment would never really generate a return. Dosh should be spent where it can have the biggest impact and make the better return.
The 150's are great units with life left but need looking after and to that end a layover at each end would do them some good. When they need replacing 20 years down the line I am sure a good diesel unit will be available. Maybe some second hand 172's...
--- old post above --- --- new post below ---
My suggestion was based purely on the fact it could be done 'now' and Northern and LM have local fleets.
What would be sensible and improve the Wrexham Bidston line in one hit would be a spiral down from Shotton High Level to Low Level so that an additional service from Wrexham (making it half hourly to Shotton) could access the North Wales coast into Chester. Never happen though...
Thanks, should have looked at Nat Rails site,but time & tide etc.
There is an article on todays North Wales Rail Newsboard, about the broken rail between Abergele & Colwyn Bay link http://www.nwrail.org.uk/nwnews.htm for pics
Copy below from the article
Shrewsbury-Chester Rail Users Association
A Public Meeting will be held on Wednesday 6 March 2013 starting at 19:30 in St Marys Church Social Club, Regent St, Wrexham when the subject will be: Track re-doubling, opportunities after 2015. The speaker will be Mr Michael Bagshaw, Commercial Director, Arriva Trains Wales. Followed by a Question and Answer session. Visitors are most welcome to attend.
I've seen suggestions for an aspiration for an hourly Cardiff to Holyhead service
Suggestions from whom? And did they have any suggestions as to where the rolling stock would come from?I've seen suggestions for an aspiration for an hourly Cardiff to Holyhead service which I'm pretty sure is not what folk between Shrewsbury and Chester want.
That's an interesting one. Anything to do with WAG paying what seems to be the full cost for Gerald (does anyone know if it really is the full cost?) and ATW keeping all the fares revenue (something I've heard several times on here, from Meroldlliw I believe)? Speaking of which, does ATW keep all fares revenue from the other WAG-funded increment to the present service, the Fishguard runs?ATW made 22% of all TOC profits in the UK in 2011 so I hope Mr Bagshaw doesn't try the we've no money excuse.
Suggestions from whom? And did they have any suggestions as to where the rolling stock would come from?
I'm sure Meroldlliw will fill you in.
I've seen suggestions for an aspiration for an hourly Cardiff to Holyhead service which I'm pretty sure is not what folk between Shrewsbury and Chester want.
ATW made 22% of all TOC profits in the UK in 2011 so I hope Mr Bagshaw doesn't try the we've no money excuse.
I have mentioned this before but would a Manchester service be better say from New Street instead of Holyhead, surely this would increase revenue?
Would extending this to Wrexham be an option i wonder? Wrexham has the platform capacity.
From a passenger and a revenue point of view it would certainly be better for NE Wales/NW Shropshire to have a direct link to Manchester. Chester-Warrington-Manchester is corridor that needs more seats and it has been suggested that one of the 6tph Trans Penine expresses post northern hub terminates at Chester in addition to the hourly ATW N Wales Coast trains via Warrington. Would extending this to Wrexham be an option i wonder? Wrexham has the platform capacity.
From the NW Coast newsletter:
Does anyone have more information on this? Opportunities after redoubling, both this one and the one closer to (my) home, between Llanelli and Swansea, will be interesting, the lack of spare rolling stock (other than perhaps a 150 or two) means I doubt either will bring any immediate service level improvement other than allowing trains to stop at Gowerton, unless of course they use LHCS (the ATW mark2s are still spare aren't there). At least both schemes should reduce the effects of disruption.
However, at present I am not at home in Pembrokeshire during the week, I'm up near Manchester. Therefore, Wrexham is slightly more accessible to me than it would be if I was home. What time is the talk likely to finish, and how far is it from Wrexham General? So I can see if it's feesible for me to go.
If I don't make it, I hope somebody else will remind Mr Bagshaw about the spare mark2s, and the inappropriateness of class 150s for long-distance or express services.
http://heretothereshop.com/blog/?p=1232 - I see that one arm of Arriva (the buses) are competing with another arm (AWT) with free wifi/ leather seats coming to the Wrexham - Chester service in April.
Hope that doesn't scupper the railway investment.
I hope that they at least stop some of them at Hereford...
No Arriva Bus wont scupper the investment, after all its only a 12 mile run Wrexham to Chester,