Network Rails North Wales Plans

Status
Not open for further replies.

Tracky

Member
Joined
18 Jul 2011
Messages
483
why is it vanity Tracky ? if the dosh is on the table go for it.Plus sprinters wont last for ever

The line does not warrant a more intensive service - Just a reliable one so the investment would never really generate a return. Dosh should be spent where it can have the biggest impact and make the better return.

The 150's are great units with life left but need looking after and to that end a layover at each end would do them some good. When they need replacing 20 years down the line I am sure a good diesel unit will be available. Maybe some second hand 172's...
--- old post above --- --- new post below ---
Or, better yet, Merseyrail who could then run a dual voltage Hooton to Chester to Crewe service.

Chester also needs an out-of-town parkway station with turnback platforms and electrified. Somewhere near Airbus would be good for rural North Wales.

My suggestion was based purely on the fact it could be done 'now' and Northern and LM have local fleets.

What would be sensible and improve the Wrexham Bidston line in one hit would be a spiral down from Shotton High Level to Low Level so that an additional service from Wrexham (making it half hourly to Shotton) could access the North Wales coast into Chester. Never happen though...
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
What would be sensible and improve the Wrexham Bidston line in one hit would be a spiral down from Shotton High Level to Low Level so that an additional service from Wrexham (making it half hourly to Shotton) could access the North Wales coast into Chester. Never happen though...

Wrexham to Colwyn Bay etc avoiding Chester? Surely that's missing out on a huge market!

A half hourly Wrexham - Shotton service would allow certain stops to be skipped which would allow the units to maintain a more reliable service (i.e. all stops in one direction, semi-fast in the other direction, like the Edinburgh - Shotts - Glasgow service).
 

Tracky

Member
Joined
18 Jul 2011
Messages
483
Wrexham to Colwyn Bay etc avoiding Chester? Surely that's missing out on a huge market!

A half hourly Wrexham - Shotton service would allow certain stops to be skipped which would allow the units to maintain a more reliable service (i.e. all stops in one direction, semi-fast in the other direction, like the Edinburgh - Shotts - Glasgow service).

No Wrexham to Chester via Shotton... As I said... additional service from Wrexham (making it half hourly to Shotton) could access the North Wales coast into Chester.

There is a lot of road traffic from the welsh border towns and villages into Chester. A market well worth tapping into...
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,411
Location
A typical commuter-belt part of north-west England
Actually somebody with a rather weak grasp of both geography and railways proposed just that a few years ago. When it was pointed out that it required a 3 mile tunnel through the Berwyns it sort of died ....Anyway have a look here for the proposal...

http://www.monbiot.com/2008/12/30/the-open-veins-of-wales/

I see that Rhaedr is mentioned in the body of that text. Much as I admire Pistyll Rhaedr, a railway connection bringing the tourists to that waterfall, I am sure would not be very cost effective.

The Mid-Wales Railway with its numerous railway stations was another part of a north-south route that once existed, but I am sure that sections of that line was prone to flooding. I would be interested to hear from anyone with personal knowledge of problems that once afflicted that particular line.
 

jones_bangor

Member
Joined
11 Mar 2011
Messages
856
As for the Wrexham Bidston line, there is no need for electrification, it is a vanity project. What is needed is improvements to the timetable by linespeed to allow a RELIABLE hourly service to be maintained with good quality 150s.

I agree with you there. The WG Minister seems to have now changed the record on electrification away from the rural Wrexham - Bidston line to the real deal, North Wales Coast. The Welsh Minister David Jones has certainly upped the stakes on that one and brought much needed focus.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
I agree with you there. The WG Minister seems to have now changed the record on electrification away from the rural Wrexham - Bidston line to the real deal, North Wales Coast

I think that the "real deal" is the bit in south Wales where the actual electrification is taking place. The Holyhead route is a sideshow in comparison.
 

jones_bangor

Member
Joined
11 Mar 2011
Messages
856
I think that the "real deal" is the bit in south Wales where the actual electrification is taking place. The Holyhead route is a sideshow in comparison.

No, Holyhead is waiting its turn (increasingly impatiently!!)
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
I think that the "real deal" is the bit in south Wales where the actual electrification is taking place. The Holyhead route is a sideshow in comparison.

No TBTC, I can assure you North Wales, is a real deal,long gone are the days when BR Et Al considered us to be second rate. Dont we need trains to use some of the Irish Midlands Wind Power that is on the cards,make North Wales Electrics a condition as part of the deal:) not too far fetched
My Farming fiends in the Irish Midlands will soon match a few in North Wales making a fortune out of wind farming, £5k a year per small turbine X (how Many) for doing nothing plus CAP:):)
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
I see that Rhaedr is mentioned in the body of that text. Much as I admire Pistyll Rhaedr, a railway connection bringing the tourists to that waterfall, I am sure would not be very cost effective.

The Mid-Wales Railway with its numerous railway stations was another part of a north-south route that once existed, but I am sure that sections of that line was prone to flooding. I would be interested to hear from anyone with personal knowledge of problems that once afflicted that particular line.

Are you getting mixed up with Carm to Aber? The Mid Wales line is in mainly upland areas away from regular flooding.
--- old post above --- --- new post below ---
No Wrexham to Chester via Shotton... As I said... additional service from Wrexham (making it half hourly to Shotton) could access the North Wales coast into Chester.

There is a lot of road traffic from the welsh border towns and villages into Chester. A market well worth tapping into...

Beeching's report stated that the line between Dee Marsh Jnc and Chester Northgate had the magic 10000 plus a year passenger figure that the report considered viable. Yet it was still closed, the Chester Northgate service use to alternate between Wrexham Central and Seacombe every other hour, so there was a viable service from Penyfordd, Hawarden, Shotton etc toward Chester.
--- old post above --- --- new post below ---
Actually somebody with a rather weak grasp of both geography and railways proposed just that a few years ago. When it was pointed out that it required a 3 mile tunnel through the Berwyns it sort of died ....

Anyway have a look here for the proposal...

http://www.monbiot.com/2008/12/30/the-open-veins-of-wales/

lack of knowledge is not confined to proposed railways the Chair of the Bevan Trust (a left leaning charity/think tank/pressure group) recently justified the demand to dual the A465 road by stating that the slow time of the bus between Merthyr and Abergavenny was caused by the narrowness of the road/congestion. She clearly did not realise despite the bus station in Merthyr being a stone throws from her office that the Stagecoach X4 doesn't travel directly along the A465 but pulls off every couple of miles and drops down into the heads of the valleys towns like, Tredegar, Ebbw Vale, Brynmawr doubling the distance traveled!
 
Joined
27 Jan 2011
Messages
203
Location
North Staffs/Cheshire border
lack of knowledge is not confined to proposed railways the Chair of the Bevan Trust (a left leaning charity/think tank/pressure group) recently justified the demand to dual the A465 road by stating that the slow time of the bus between Merthyr and Abergavenny was caused by the narrowness of the road/congestion. She clearly did not realise despite the bus station in Merthyr being a stone throws from her office that the Stagecoach X4 doesn't travel directly along the A465 but pulls off every couple of miles and drops down into the heads of the valleys towns like, Tredegar, Ebbw Vale, Brynmawr doubling the distance traveled!

Reminds me of the bus service in the village we used to live in in North Yorks. The only service that actually passed through the village took nearly an hour to get to Harrogate which was 7 miles as the crow flies. However the bus route seemed to seek out villages and hamlets all over the place on its way. Indeed it was reputed that you entered a different space/time continuum when you climbed on board.

However if you could get the 1.5 miles up onto the A61, the Leeds/Harrogate/Ripon road, you could catch a 36 double decker bus with leather seats upstairs and a satnav location display and you'd get into Harrogate in 15 mins.

That reminds me, I wonder how the campaign to re-open the Harrogate to Ripon line is going? Haven't heard anything about it for at least 5 years.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,857
How about starting a project (HS3?) for a high speed line between Holyhead and Cardiff that didn't cross the border into England at any point. What's the best guess at route and how many billions? Oh and passenger loading.
A better strategy would be see what old North South Lines could be reopened and whether the cost would ever add up.
I agree, a HSR would be overkill but it might be worth looking at a mix of reopened and (convential speed) new lines to link Wales north-south by rail.

I guess you probably could join some missing links to make a through north/south route but it probably wouldn't save any time compared to dragging out to England and down the Marches and it certainly wouldn't be transformational.
I partially agree. I doubt an internal Wales route would be much faster than the marches line for passengers going the full length of Wales from, say, Cardiff to Bangor, but a line through the middle of Wales certainly could be transformational for intermediate journeys, say Builth Wells to Porthmadog (or Holyhead).

The fact is that because of its geography Wales never really had a North coast - South coast railway route. Looking at what existed in the past the closest you could get by reistating old lines is still going to be Swansea-Carmarthen-Aberystwyth (reversal) - Cambrian coast (another reversal at Mach) - Afon Wen - Bangor. The route going up from Merthyr to Brecon would involve reversal at Brecon and at Moat Lane. Cardiff - Swansea District Line- Central Wales line- Builth Rd - Moat lane would only involve the reinstatement of that last section.
Looking at HS2, we see a north-south Y-Shaped HighSpeed 'network' for England. I say, how about a north-south Y-Shaped 'High Speed' 'network' for Wales, scaled down to reflect Wales' much smaller population. The key differences would be that the Welsh network would use sections of existing line (upgraded in many cases) and have a top speed of 90mph instead of over 200mph (operated by 2-car 158s instead of umpteen-car HighSpeed trains).

My proposal, gradients permitting, would be something like:
  • Merthyr - Brecon (electrified as part of ValleyLines)
  • Brecon - Builth Road (new alignment to around the half-way point)
  • Builth Road - Rhayader (principally a reopened route)
  • Rhayader - Llanidloes (new alignment, probably the most expensive part of the whole scheme)
  • Llanidloes - Moat Lane (principally a reopened route, but with chords linking to both Newtown and Machynlleth at Moat Lane rather than a station)
  • Welshpool - Gobowen via Oswestry (principally at reopened route)
  • Dovey Junction - Porthmadog (heavily upgraded existing line)
  • Porthmadog - Bryncir (all new route)
  • Bryncir - Caernarfon - Bangor (principally a reopened route, if the north Wales line is electrified then so to would be Caernarfon - Bangor, perhaps with later extension to Llanberis)
Some of the 'principally reopened' routes would have to divert to skirt the edge of settlements where properties have been built on the former railway. The service would be fairly simple:
  • Hourly/Half Hourly Cardiff - Brecon electric service
  • Hourly Brecon - Newtown class 158 service, continuing alternately (to Wrexham via Oswestry in one hour, Bangor/Holyhead in the next)
  • The existing every two hours Birmingham - Pwllheli class 158s would continue, and assuming the Aberystwyth - Birmingham hourly service is delivered, this makes the whole Cambrian hourly expect the Porthmadog - Pwllheli section
  • Caernarfon - Llandudno/Crewe/Chester hourly service (which could be electric, as outlined above)
  • Optional Newtown - Wrexham every two hours service to make the Welshpool - Wrexham route up to hourly as well

Carmarthen - Aberystwyth would be the next major Welsh new rail links project on my to-do-list, but if the promissed TrawsCymru bus service running hourly from 6am to 8pm does not matterialise I may have to move that new railway up my priority list. Neither scheme seems likely to go anywhere though, they are definately too optimistic to hold out much hope of them happening any time soon, but its nice to plan.

You would have the most severest gradients in the UK
What sort of gradients would be acceptable? Google Earth gives an avg. slope and Max slope for line placemarks, but I've no idea if figures like 10.7%, 5.6% or even 1.4% are suitable for railways. I don't really get gradients given as percentages at all.

In the case of Methyr - Brecon though, I wonder whether a Electrostar unit could be produced with the ability to operate as a rack-and-pinion train over a limited section of line and what this would increase the acceptable gradient to (and whether such a unit is at all practical)?

Carm - Aber does have a certain appeal. A few years ago the figure of £250m was being banded about.....sounds a bargain to me!
If £250m was quoted for Carmarthen - Aberystwyth I suspect that was for a simple reopenning, which WAG have rejected since (I think) the times at the time of clousure were slower than todays bus. Personally, I think things could be done a lot better today, Lampeter to Strata Florida (that vacinity, I don't know where the station was) looks pretty straight and hence could perhaps be built for 90mph capability, but the rest would need alot of straightening (including a tunnel towards the southern end) to make it worthwhile, which would add a lot of cost. The traffic in the morning into Aberystwyth is terrible though, so how about building a bus-only road (designed to be suitable for a rail alignment) from Llanfarian (where the worst of the traffic begins) into Aberystwyth on the understanding that, if a railway ever does arrive from Carmarthen, the buses will make way for the trains?

Swansea to Cardiff 25 mins or so, about half the current journey times and linking a lot of major conurbations that have tortuous services at present.
Since Swansea and Cardiff are really the only 'major conurbanations' that you mentioned, I'm going to pick up on this one. The CDF to Bridgend route is a rather twisty 20.2 miles Via Pontyclun and Pencoed and I sometimes find it rather tedious. It is also a rather busy section of line, so, if anyone ever decides it should be 4-tracked I'd say no. Instead, I'd put the extra two tracks in alright, but on a new, much more direct, formation from just west of St. Fagans most of the way to Bridgend (the present route would be retained for stoppers and freight). It probably wouldn't be a long enough distance to make it worth going to 125mph, but doing 100mph most of the way over a route 2 miles shorter than the present one might save nearly 10 minutes, probably at a much lower cost than a new HighSpeed line from Cardiff to Swansea.

-----------------------------------------------------------------

Sounds interesting, but the problem will be the mish mash of services and borders. If you take the rule of thumb that you need a half hourly service to warrant electrification then wiring the Holyhead line may come at the expense of most of the current services to Cardiff (being replaced with more to Crewe/ Manchester). Would certain people be prepared to accept that?
From various members of this fourm, it would seem that Holyhead - Cardiff trains aren't as well patronised along the marches as S. Wales - Manchester and trains running east-west along the north Wales coast. I also have my own concerns about the much needed hourly Cambrian main line service tying up more of Wales' class 158 fleet and further restricting diagramming. Therefore, in order to try and maximise diagraming flexibility (maintaining the number of 158s available away from the Cambrian and helping make the case for longer trains on busy services by limiting quieter runs on some diagrams and maximising busy runs on others), and improve the case for wiring the north Wales coast line without also wiring the marches, I would propose replacing the current service pattern with the following:

  • Aberystwyth/Pwlheli - Birmingham - Wrexham - Chester (every two hours)
  • Aberystwyth - Birmingham (every two hours)
  • Chester - Wrexham - Cardiff (every two hours)
  • Holyhead - Manchester Piccadilly (hourly)
  • Llandudno - Crewe (hourly)
  • Holyhead - Wrexham - Cardiff (two trains a day, each way) (express)
  • Plus of course Intercity services from Euston to Holyhead/Bangor, and maybe throw in some Llandudno workings too.

Since the Llandudno - Crewe service would replace the current Crewe - Chester shuttle, this may free up a 150. If it does, I'd use it to run a stopper between Llandudno and Bangor/Holyhead. Then you could remove the request stops (other than Conwy, which to me seems too important to be only served by a 2-hourly service that only stops on request) from the Holyhead services.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
From various members of this fourm, it would seem that Holyhead - Cardiff trains aren't as well patronised along the marches as S. Wales - Manchester and trains running east-west along the north Wales coast. quote Rhydgaled

It is a fact, In my opinion a Holyhead/Bangor service through the middle to Cardiff would not attract much trade, Cant think of anyone arriving at Holyhead by ferry going to South Wales.

You have put together a well thought out thread 42 Rhydgaled, top marks
 
Joined
27 Jan 2011
Messages
203
Location
North Staffs/Cheshire border
I totally agree mlw, an excellent thread by Rgd.

In a way your point hits the nail on the head. I doubt if anyone arriving at Holyhead at present is heading for South Wales, but surely that's what 'transformational' development is about? Changing the way people perceive, think about and do things, so maybe introducing such a line may gradually change long ingrained habits and bring the top and bottom of Wales closer.

Five or six years ago we showed one of our beardies at the Welsh Kennel Club Show at Builth (a tortuous journey from North Yorkshire). But then we drove up to Anglesey to collect a puppy from a breeder friend. I was staggered at the twists and turns we had to endure and the amount of time it took to get there. I'm certain it took less time to get from Gwalchmai to Harrogate than it did to drive from Builth to Gwalchmai the previous day.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
From various members of this fourm, it would seem that Holyhead - Cardiff trains aren't as well patronised along the marches as S. Wales - Manchester and trains running east-west along the north Wales coast. I also have my own concerns about the much needed hourly Cambrian main line service tying up more of Wales' class 158 fleet and further restricting diagramming. Therefore, in order to try and maximise diagraming flexibility (maintaining the number of 158s available away from the Cambrian and helping make the case for longer trains on busy services by limiting quieter runs on some diagrams and maximising busy runs on others), and improve the case for wiring the north Wales coast line without also wiring the marches, I would propose replacing the current service pattern with the following:

  • Aberystwyth/Pwlheli - Birmingham - Wrexham - Chester (every two hours)
  • Aberystwyth - Birmingham (every two hours)
  • Chester - Wrexham - Cardiff (every two hours)
  • Holyhead - Manchester Piccadilly (hourly)
  • Llandudno - Crewe (hourly)
  • Holyhead - Wrexham - Cardiff (two trains a day, each way) (express)
  • Plus of course Intercity services from Euston to Holyhead/Bangor, and maybe throw in some Llandudno workings too.

Two points here the Cambrian will not need two extra units if an hourly service is run on it - for the simple reason not as many 4 car formations will need to be run west of Shrewsbury. If its juts a few extras in the AM heading toward Salop and PM away form Salop we could be talking about all of one unit.
There's 3 South Wales 158 diagrams at the moment including 4 return trips up the Ebbw Vale branch allegedly due to WG prescribing that Pacers were not be run on it like other valley lines. There's 5 returns to Maesteg too, 158's are not short distance low speed commuter trains..
 

Holly

Member
Joined
20 May 2011
Messages
783
There is still a big need for a new parkway station outside Chester fairly near a main highway.

It would be a huge lost opportunity not to place it over the border in Wales. And make it part of some bigger scheme.
 

Dolge

Member
Joined
19 Aug 2010
Messages
21
Holly said:
There is still a big need for a new parkway station outside Chester fairly near a main highway.

It would be a huge lost opportunity not to place it over the border in Wales. And make it part of some bigger scheme.

Queensferry is the obvious site, with another one at Rossett when Wrexham to Chester is redoubled. But why should the Welsh Assembly pay to sort out Chester's traffic problems? Cheshire West and Cheshire Council have no interest in rail apart from London services.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
"There is still a big need for a new parkway station outside Chester fairly near a main highway.

It would be a huge lost opportunity not to place it over the border in Wales. And make it part of some bigger scheme".

Queensferry is the obvious site, with another one at Rossett when Wrexham to Chester is redoubled. But why should the Welsh Assembly pay to sort out Chester's traffic problems? Cheshire West and Cheshire Council have no interest in rail apart from London services.

With all respect Dolge, Welsh Govts TOC ATW Manage Chester Station.
--- old post above --- --- new post below ---
I totally agree mlw, an excellent thread by Rgd.

In a way your point hits the nail on the head. I doubt if anyone arriving at Holyhead at present is heading for South Wales, but surely that's what 'transformational' development is about? Changing the way people perceive, think about and do things, so maybe introducing such a line may gradually change long ingrained habits and bring the top and bottom of Wales closer.

Five or six years ago we showed one of our beardies at the Welsh Kennel Club Show at Builth (a tortuous journey from North Yorkshire). But then we drove up to Anglesey to collect a puppy from a breeder friend. I was staggered at the twists and turns we had to endure and the amount of time it took to get there. I'm certain it took less time to get from Gwalchmai to Harrogate than it did to drive from Builth to Gwalchmai the previous day.

It is my opinion, Politicians have tried to bring South & North nearer,but failed
Gerald the Flagship of ATW carries few if any in its First Class surrounds,Wagair is no more than a tourist flight,other than Politics, there seems little interest in bringing them closer,

I agree The Royal Welsh Showground is difficult to get to,from the North its 30 miles of bends from Newtown to Builth via Llandod, you are probably correct about timings,
 

Tracky

Member
Joined
18 Jul 2011
Messages
483
A parkway station for Chester would be near pointless...

1) Chester has a number of excellent Park & Ride schemes in place.
2) Chester Railway Station is a good walk from the centre.
 
Joined
27 Jan 2011
Messages
203
Location
North Staffs/Cheshire border
A parkway station for Chester would be near pointless...

1) Chester has a number of excellent Park & Ride schemes in place.
2) Chester Railway Station is a good walk from the centre.

And Mrs SDA tells me there are dedicated buses from the station to the centre. I believe she also protested that they used to be free but are now charged for.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
And Mrs SDA tells me there are dedicated buses from the station to the centre. I believe she also protested that they used to be free but are now charged for.


I thought there was (or still is) a middle ground that the shuttle bus service is still free if you can display a valid train ticket. Assuming it hasn't been eaten by the barriers, of course. (Being young and foolish I never waited for the bus and just started walking even when it was free to all!)
 

Polarbear

Established Member
Joined
24 May 2008
Messages
1,906
Location
Birkenhead
I thought there was (or still is) a middle ground that the shuttle bus service is still free if you can display a valid train ticket. Assuming it hasn't been eaten by the barriers, of course. (Being young and foolish I never waited for the bus and just started walking even when it was free to all!)

Nope, the free bus was withdrawn a while back when Helms of Eastham decided to launch a commercial service between the railway station & Frodsham Street in Chester.

Now it's a mess as Arriva sell cheap tickets on their Welsh services that start/end at the station for travel to/from the city centre. Stagecoach also run a limited service at peak times & these are as well as the Helms' service.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
Nope, the free bus was withdrawn a while back when Helms of Eastham decided to launch a commercial service between the railway station & Frodsham Street in Chester.

Now it's a mess as Arriva sell cheap tickets on their Welsh services that start/end at the station for travel to/from the city centre. Stagecoach also run a limited service at peak times & these are as well as the Helms' service.

Yes Arriva Bus Wales run a every 12 minute service Mon/Sat from Dawn to Dusk,then less frequent to Midnight, the stand is outside the station with a rolling departure timetable in the station, the every 12 minute service is to Wrexham http://www.arrivabus.co.uk/serviceInformation.aspx?id=2561 for chapter & Verse
 

Holly

Member
Joined
20 May 2011
Messages
783
... 1) Chester has a number of excellent Park & Ride schemes in place. )
2) Chester Railway Station is a good walk from the centre.
Those are largely for people travelling to Chester, not from Chester.
Few will drive to a park and ride to catch a bus to catch the train. They will just drive to a station somewhere else (typically Crewe) and park there.

Expanding the parking at Hooton station and extending long distance trains to turn back there instead of Chester would meet Chester and Wirral's needs (Hooton has the spare platforms needed). But that would not benefit drivers from inland North Wales (for example Llanrwst) where a station with lots of parking somewhere near Queensferry or Airbus definitely would.

It's criminal that some profiteer was allowed to kill the free bus. I understand the council now has to pay more to subsidize the pay-fare bus than it used to cost it to provide the free bus.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Regarding traffic to Manchester, electrification to Warrington would be sufficient, as the route to Manchester via Chat Moss will then be electrified once the current Manchester-Earlestown works are completed.

Current proposals for the Manchester-Chester via Warrington line is for the service to go to 2tph all day, with one being express to Victoria and continuing to Rochdale and beyond and the other being a stopper to Manchester Airport.

I imagine if the line was electrified Rochdale would then read Stalybridge.

And electrification from Chester to Crewe has already been suggested, in respect of freeing-up Virgin's diesel voyagers and replacing the Euston-Chester services with pendolinos.

Not quite. Virgin planned to use new electric trains as Voyager replacement on North Wales services but also planned to order brand new diesel locos for North Wales services, which would be quicker to attach and remove than the current ones.

Chester-Crewe is a Network Rail headache for electrification. The cost of standard continuous electrification is substantial due to their being 20-30 low bridges to deal with. The most viable solution is dis-continuous electrification which would mean West Coast trains running with two pantographs up on that section. However, that would likely meaning all ATW services on that section would remain as diesel due to the difficulty and expense in designing an up to 4 car EMU which works on two pantographs which would only be used on one line.
--- old post above --- --- new post below ---
Nope, the free bus was withdrawn a while back when Helms of Eastham decided to launch a commercial service between the railway station & Frodsham Street in Chester.

It's actually Aintree Coachline who operate the service (part of the same company.) There's an Aintree Coachline/Helms of Eastham employee who goes by the name of Tracy who's signed up to some forums defending the poor little defenceless Aintree Coachline and been quite abusive in reply to posts criticising what Aintree Coachline have done - in one case saying free town/city centre buses have contributed to the country going in to recession.
 

TDK

Established Member
Joined
19 Apr 2008
Messages
4,164
Location
Crewe
No Wrexham to Chester via Shotton... As I said... additional service from Wrexham (making it half hourly to Shotton) could access the North Wales coast into Chester.

There is a lot of road traffic from the welsh border towns and villages into Chester. A market well worth tapping into...

What is the point in that? You already have a service from wrexham to Shotton on 2 different routes and an hourly service to Chester what a waste of money!
--- old post above --- --- new post below ---
As regards to re-signalling the Marches route if the current state of the Shrewsbury to Crewe scheme is anything to go by then I wouldn't hold your breath!!!

No extra capacity just getting rid of traditional boxes and the capacity remains the same, how rediculous
--- old post above --- --- new post below ---
You would have the most severest gradients in the UK

Or the longest underground line
--- old post above --- --- new post below ---
The Bidston line will re-commence steel sleeper relaying again soon, once this is complete line speeds should be increased to make the timetable more realistic! As regarding 3rd rail electrification are steel sleepers a wise choice?

Are they actually alowed to lay "new build" 3 rail systems in the UK? I am sure I heard somewhere that they cannot. I would say light rail over this line would be a lot better and cheaper to run and also better for the passengers
--- old post above --- --- new post below ---
At the end of the day Wales is lightly populated and most of it is in the South Wales Belt.

.

Agreed but North Wales particularily Wrexham is only 45 minutes from Manchester and Liverpool and that is where the money lies, not north to south
 

TDK

Established Member
Joined
19 Apr 2008
Messages
4,164
Location
Crewe
with another one at Rossett when Wrexham to Chester is redoubled

Rediculous proposal, if anything expand the parking at Wrexham, cheaper and a much higher population, Chiltern have done a a great job of expanding car parks at mostly their own cost at their key stations!
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
Are they actually alowed to lay "new build" 3 rail systems in the UK? I am sure I heard somewhere that they cannot

This may be true, it may be an urban myth - supposedly you are only allowed to extend existing services (rather than build a brand new one), but I don't think I've ever seen evidence.

Replacement EMUs (when the 507/508s are withdrawn) will have to be dual voltage anyway, which helps the case for wiring the Wrexham line. Allowing direct services into Liverpool from Wrexham and parts of the Wirral peninsula would transform the line.

North Wales particularily Wrexham is only 45 minutes from Manchester and Liverpool and that is where the money lies, not north to south

Agreed - we should concentrate on providing these kind of practical links (and not playing politics).
 