Manchester77
Established Member
Another test train?
http://www.realtimetrains.co.uk/train/U95926/2013/12/06/advanced
http://www.realtimetrains.co.uk/train/U95926/2013/12/06/advanced
Another test train?
http://www.realtimetrains.co.uk/train/U95926/2013/12/06/advanced
What provides traction for the test train?
Cheers, got the royal seal of approval then
This might be a stupid question but what does the test train do is it just checking the OHLE works or does it shock the positioning and stuff?
You'll need an expert for that.
The timings only allow for a single pass of about 15 minutes each way Parkside-Ordsall Lane, so whatever it does it must be doing it at speed!
I imagine the plan for using a VT Pendolino is to use one of the couple which are fitted with pantograph monitoring equipment.
This has been invaluable for checking OHLE quality on the WCML on a daily basis using normal service trains.
--- old post above --- --- new post below ---
Progress noted today:
There are now a couple of mast bases east of St Helens Junction on the Up as well as the Down.
Excavations in advance of concrete bases extend further east, and have also started in the cutting between Huyton Quarry and Whiston.
On the Wigan branch, masts extend a short way east of Bryn on both lines, with excavations beyond (and on both platforms at St Helens Central).
There is also serious groundwork going on at Springs Branch Jn, on the west side of the WCML.
This might be for electrical switchgear for the line towards St Helens.
Roby station has gained some ugly jacks to hold the P1 canopy up; it's not obvious if they are temporary for the duration of the station upgrade or not.
No idea what's on it but it should be once again testing the OHLE.It is indeed a test train booked to run on FridayNo idea what's on it but it should be once again testing the OHLE.
What little remains of Seedley station can be seen from Langworthy Road bridge, all that's left is a little bit of concrete and brickwork on the embankment. I only know of it as that's where I spent quite a bit of time as a youngster watching the trains with my Grandad.
Out of interest how are things progressing with the Bolton electrification?
Phil![]()
It is indeed a test train booked to run on FridayNo idea what's on it but it should be once again testing the OHLE.
Don't think the line has been energised yet, when I drove along the M602 last night they were still fiddling with the wires using cherry pickers!
Three test runs tonight??
http://www.realtimetrains.co.uk/train/Y80214/2013/12/08/advanced
http://www.realtimetrains.co.uk/train/N65415/2013/12/08/advanced
http://www.realtimetrains.co.uk/train/N26833/2013/12/09/advanced
Were loaded into the timetable database on Friday.
5T91 is on the move. Fingers crossed!

Well, it ran! About 15 minutes early across Chat Moss.
I hope someone was out to confirm it was actually electric!
Well, it ran! About 15 minutes early across Chat Moss.
I hope someone was out to confirm it was actually electric!
Looks like the second test train is doing good too.
It's the same train, coming back.