Cheers, got the royal seal of approval then ;)

This might be a stupid question but what does the test train do is it just checking the OHLE works or does it shock the positioning and stuff?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,917
Location
Mold, Clwyd
Cheers, got the royal seal of approval then ;)
This might be a stupid question but what does the test train do is it just checking the OHLE works or does it shock the positioning and stuff?

You'll need an expert for that. ;)
The timings only allow for a single pass of about 15 minutes each way Parkside-Ordsall Lane, so whatever it does it must be doing it at speed!

I imagine the plan for using a VT Pendolino is to use one of the couple which are fitted with pantograph monitoring equipment.
This has been invaluable for checking OHLE quality on the WCML on a daily basis using normal service trains.

--- old post above --- --- new post below ---

Progress noted today:
There are now a couple of mast bases east of St Helens Junction on the Up as well as the Down.
Excavations in advance of concrete bases extend further east, and have also started in the cutting between Huyton Quarry and Whiston.
On the Wigan branch, masts extend a short way east of Bryn on both lines, with excavations beyond (and on both platforms at St Helens Central).
There is also serious groundwork going on at Springs Branch Jn, on the west side of the WCML.
This might be for electrical switchgear for the line towards St Helens.
Roby station has gained some ugly jacks to hold the P1 canopy up; it's not obvious if they are temporary for the duration of the station upgrade or not.
 
Last edited:

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
You'll need an expert for that. ;)
The timings only allow for a single pass of about 15 minutes each way Parkside-Ordsall Lane, so whatever it does it must be doing it at speed!

I imagine the plan for using a VT Pendolino is to use one of the couple which are fitted with pantograph monitoring equipment.
This has been invaluable for checking OHLE quality on the WCML on a daily basis using normal service trains.

--- old post above --- --- new post below ---

Progress noted today:
There are now a couple of mast bases east of St Helens Junction on the Up as well as the Down.
Excavations in advance of concrete bases extend further east, and have also started in the cutting between Huyton Quarry and Whiston.
On the Wigan branch, masts extend a short way east of Bryn on both lines, with excavations beyond (and on both platforms at St Helens Central).
There is also serious groundwork going on at Springs Branch Jn, on the west side of the WCML.
This might be for electrical switchgear for the line towards St Helens.
Roby station has gained some ugly jacks to hold the P1 canopy up; it's not obvious if they are temporary for the duration of the station upgrade or not.

Glad to hear it, especially within my neck of the woods! 8-)

Any more news of the Parkside to Ordsall Lane energisation yet?
 

Phil6219

Member
Joined
15 Jul 2011
Messages
578
Location
Manchester, UK
It is indeed a test train booked to run on Friday :) No idea what's on it but it should be once again testing the OHLE.

What little remains of Seedley station can be seen from Langworthy Road bridge, all that's left is a little bit of concrete and brickwork on the embankment. I only know of it as that's where I spent quite a bit of time as a youngster watching the trains with my Grandad.

Out of interest how are things progressing with the Bolton electrification?

Phil 8-)
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
It is indeed a test train booked to run on Friday :) No idea what's on it but it should be once again testing the OHLE.

What little remains of Seedley station can be seen from Langworthy Road bridge, all that's left is a little bit of concrete and brickwork on the embankment. I only know of it as that's where I spent quite a bit of time as a youngster watching the trains with my Grandad.

Out of interest how are things progressing with the Bolton electrification?

Phil 8-)

Bolton, think the contracts have been let for bridge and structure amendments.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,659
Location
Nottingham
Mentor is a converted Mk1 coach with a pantograph and observation windows. It has probably been updated several times since I visited it in the early 90s and I would guess it now has equipment to monitor the OLE geometry and to record it on high speed video. Thus it can confirm that the OLE position is within spec, probably with or without a rasied pantograph though not both at the same time.

What it probably can't do, unless the modifications have been drastic, is act as a load bank to check that the OLE and power feeds work correctly when close to their maximum rated current.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,917
Location
Mold, Clwyd
For what it's worth, there are a couple of TP Class 350 ECS trips booked in the early hours of Saturday 7 December (Ardwick-Carnforth and back, 5T01/02).
http://www.realtimetrains.co.uk/train/N19341/2013/12/06/advanced
And one late on Sunday 8 December (Ardwick-Preston, 5T91).
Search for "Astley" and "Non-passenger" and you should get the details of the odd-ball workings via Chat Moss.

All the similar planned workings up to now have been cancelled.
--- old post above --- --- new post below ---
It is indeed a test train booked to run on Friday :) No idea what's on it but it should be once again testing the OHLE.

The test diagram does not seem to have been activated today, although I suppose there's still time.
EDIT: "Cancelled at the request of the customer"
 
Last edited:

507 001

Established Member
Joined
3 Dec 2008
Messages
2,174
Location
Huyton
Don't think the line has been energised yet, when I drove along the M602 last night they were still fiddling with the wires using cherry pickers!
 

steverailer

Member
Joined
15 Feb 2013
Messages
169
Don't think the line has been energised yet, when I drove along the M602 last night they were still fiddling with the wires using cherry pickers!

The line is energised, just switched off at night and work done under a 'C' form, same as the rest of the electrified rail network:roll::roll:

They'll be 'fiddling' with it for another couple of months at least, its called snagging. The line is safe for use, its just little niggly adjustments and the such like
 
Last edited:

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
It wouldn't make sense if it wasn't a 350. What would be the point of running a 185 like that? (Drivers already have route knowledge and clearance over that route.)
 

nw-sparks

Member
Joined
10 Oct 2013
Messages
272
Location
Liverpool
Well, it ran! About 15 minutes early across Chat Moss.

I hope someone was out to confirm it was actually electric!
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
Well, it ran! About 15 minutes early across Chat Moss.

I hope someone was out to confirm it was actually electric!

I think there will be someone out there!

A new era has started!
--- old post above --- --- new post below ---
It's now arrived at Wigan.

Just need confirmation now that it was a 350.
--- old post above --- --- new post below ---
Well, it ran! About 15 minutes early across Chat Moss.

I hope someone was out to confirm it was actually electric!

Looks like the second test train is doing good too.

It went past Astley a few minutes ago according to the link.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,634
Location
Rochdale
Heading back to Preston at 00:33. Finally we have joined the modern age, now for the rest of the un electrified lines :lol:
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
Well isn't this all exciting! Be interesting to see what happens now! Testing to become more regular i imagine they have to make sure its right before chucking passenger services on it.
 