Maybe along with my plans from the first post, the Peterborough to Horsham service could become peak only, running in both directions in both peaks, to directly replace the GN Peterborough peak extras and to provide 6tph to Redhill during the peaks.I agree. Rainham is duplicated by HS1 and Crossrail, it is top of my list to junk. It adds big risk for a tiny benefit.
The problem with Peterborough is not the length of journey. It is the interaction with the ECML, particularly through 2 busy 2 track sections, and the lack of options for turning short. I'd want to make Thameslink to/from Peterborough peak hours only, but that may be difficult due to lack of platforms at Kings Cross.
I would keep Welwyn GC-Sevenoaks and run it all day. It has never made sense to me that nearly all of the GN/Thameslink services were pushed through the Digswell 2 track section. Welwyn GC is a blindly obvious place for Thameslink trains to start/terminate, and Sevenoaks is good as a south of the river destination for Welwyn GC trains, because both Welwyn GC and Sevenoaks are restricted to 8 cars.
Cambridge-Brighton plus Welwyn GC-Sevenoaks gives 4 trains per hour off peak through the Canal Tunnel, and Peterborough line passengers have options for travelling through the core via changes at Finsbury Park.
I'll let you 3rd rail people fret about Windmill Bridge-Three Bridges!
And my 20 trains per hour in the peak would be everything except Luton-Rainham and Cambridge-Maidstone. The first thing I'd d would be to formally bury Cambridge-Maidstone.
Welwyn to Sevenoaks all day is a very good idea, solves nearly all of the issues of the Peterborough service while still providing 4tph through the canal tunnels.
I would then run the Luton to Orpington service all day to replace the Rainham service north of Blackfriars.