Kings Cross to Peterborough is way too long a route to be part of Thameslink, so the Peterborough to Horsham service should be resplit to be Kings Cross to Peterborough and not directly replaced south of London for now.
In the short term, the Bedford to Gatwick service should be extended to Horsham, and call at all stations Purley to Horsham, and the Victoria to Reigate service should be changed to be Victoria to Horsham and Reigate - 12 coaches Victoria to Redhill then divides with the front 8 coaches to Horsham (all stations exc Faygate) and back 4 to Reigate. This additionally solves the issue of the Victoria to Reigate service being 4 coaches.
The fasts and slows should become entirely self contained between Windmill Bridge Junction and north of Gatwick Airport, removing all conflicts on the fasts. The removal of the Peterborough to Horsham removes the unnecessary movement at Stoats Nest Junction.
Balcombe should have a proper contingency for a Southern service to always call there when there is disruption on Thameslink, being the only station south of East Croydon solely served by TL (and not warranting a Southern service to call all of the time).
Luton to Rainham is a route that goes so far away from the rest of the Thameslink network, and brings unnecessary unreliability to the Thameslink core and Southeastern network. The Luton to Blackfriars section can be merged with the Blackfriars to Sevenoaks service, bringing back a Luton to Sevenoaks service. Welwyn peak services can be binned off as there are simple alternatives to get to Moorgate (Circle/H&C/Met Line from Farringdon, Northern Line from E&C, walk opposite way from the city to Moorgate instead of City TL).
Littlehampton and East Grinstead peak services can be cut back to London Bridge (and can continue to be operated with 700s if no 377s are available).
My ideas should go a long way to solving reliability problems on Thameslink, with it contained to 3 lines south of London (BML, Sutton Loop, Catford Loop Line), losing the absurdly long Peterborough service, removing some unnecessary peak services, and making sure all stations are adequately served by other services if Thameslink is disrupted.
What’s going on with Thameslink?
Cancellations everyday, delayed. What’s going on with it? I usually use the section between London Bridge - East Croydon/Redhill. But everyday there seems to be a problem. They have been using the excuse shortage of train crew for ages now. These trains are DOO so it can only be drivers. Don’t...
Kings Cross to Peterborough is way too long a route to be part of Thameslink, so the Peterborough to Horsham service should be resplit to be Kings Cross to Peterborough and not directly replaced south of London for now.
In the short term, the Bedford to Gatwick service should be extended to Horsham, and call at all stations Purley to Horsham, and the Victoria to Reigate service should be changed to be Victoria to Horsham and Reigate - 12 coaches Victoria to Redhill then divides with the front 8 coaches to Horsham (all stations exc Faygate) and back 4 to Reigate. This additionally solves the issue of the Victoria to Reigate service being 4 coaches.
The fasts and slows should become entirely self contained between Windmill Bridge Junction and north of Gatwick Airport, removing all conflicts on the fasts. The removal of the Peterborough to Horsham removes the unnecessary movement at Stoats Nest Junction.
Balcombe should have a proper contingency for a Southern service to always call there when there is disruption on Thameslink, being the only station south of East Croydon solely served by TL (and not warranting a Southern service to call all of the time).
Luton to Rainham is a route that goes so far away from the rest of the Thameslink network, and brings unnecessary unreliability to the Thameslink core and Southeastern network. The Luton to Blackfriars section can be merged with the Blackfriars to Sevenoaks service, bringing back a Luton to Sevenoaks service. Welwyn peak services can be binned off as there are simple alternatives to get to Moorgate (Circle/H&C/Met Line from Farringdon, Northern Line from E&C, walk opposite way from the city to Moorgate instead of City TL).
Littlehampton and East Grinstead peak services can be cut back to London Bridge (and can continue to be operated with 700s if no 377s are available).
My ideas should go a long way to solving reliability problems on Thameslink, with it contained to 3 lines south of London (BML, Sutton Loop, Catford Loop Line), losing the absurdly long Peterborough service, removing some unnecessary peak services, and making sure all stations are adequately served by other services if Thameslink is disrupted.
Last edited by a moderator: