Passes second reading 452-41. Brilliant news.
Indeed I think we both have watching and waiting with anticipation
Passes second reading 452-41. Brilliant news.
Indeed I think we both have watching and waiting with anticipation![]()
Yes, I was sat watching it on tele for the last hour, I couldn't and wouldn't want to watch the whole seven hours though!
Good news if your support HS2 that is. It was interesting to hear what the MPs had to say on the matter.
I especially liked the comment as many people are travelling now as in the 1920s but we have half the size of network.
That could actually be considered as an argument for expanding the network to places not currently served by trains, which is something that is happening in some areas and should continue to happen in my opinion.
They also talked about overcrowding on the west coast route. That's not the only route that's overcrowded and not all overcrowded routes are getting the same parliamentary time as HS2. Perhaps the solutions to their problems are less controversial so don't need such parliamentary time.
My comments are not meant to be anti HS2. Just a reflection on the fact HS2 isn't the only rail project that would be useful.
Sent from my Nexus 5 using Tapatalk
It is unprecedented overall but are they giving the same parliamentary time to all the projects? I keep hearing about HS2 but is that because it's in the planning stages now and other projects are not.
Meanwhile, outside Parliament, the Anti Hs2 mob were protesting.
They claim to be a growing campaign.
They claim 540k homes & 1 million people are 'blighted' by Hs2.
They claim they have over 90 'action' groups.
They claim the majority of the UK opposes Hs2.
How many turned up?
Less than 100...
Pix here: http://paulbigland.zenfolio.com/p294940289
Not forgetting the new 'Infrastructure Planning Commission' (Development Consent Order) procedure for certain sized projects, as has just been used for the Ipswich Chord, and the Norton Bridge project which was confirmed only recently.
Then to cap it all off, Network Rail can do a huge amount of work within their boundary using 'permitted development rights'. Simplifying things a great deal, the original Acts used to build the railway in the first place normally included a perpetual right to modify, maintain and renew structures, embankments, cuttings etc.
It would be interesting to see if there's a published scale of sizes or costs that is used to decide between TWA Orders, Infrastructure Planning Commission or Parliamentary Bill procedures.
As I think we've discussed before, there was an opinion voiced that Chiltern shouldn't really have needed a TWA Order for the whole of the Bicester - Oxford line because it was a renewal, except for the new junction with their main route.
Well Stoke Council have now officially filed papers with the House of Commons petitioning the route of HS2 to be changed so that it doesnt go to Crewe but instead ends in Stoke 'saving' £5bn.
Almost 2,000 petitions have been sent to the Government opposing HS2 - putting a 2017 start date in jeopardy, campaigners revealed today.
In total 1,925 petitions have been received by the House of Commons with campaigners saying it will take at least two years for MPs on the HS2 Select Committee to examine the detail alone before Parliament has to vote on the project again.
Now that the deadline for petitions has passed it seems that there will be quite a few to get through. Will there be a process for condensing petitions asking the same thing, or does everybody get to have their say. I am sure that some people have guanine points to raise, but others may be just complaining that they don't like the project. Could they duplicate the number of committees to speed things up?
As seems to always be the case now, HS2 Ltd commissioned Arup to write a report on the possibilities of even longer tunneling in the Chilterns:
Chilterns Long Tunnel Options Review - January 2012
OK, I'll rise to it. That report of Arup's for HS2 compares the tunnelled options with international projects of similar complexity. All of them under mountains or the sea!
Here, the proposal is to put say 25km of tunnel under rural England. As the report says,"Unprecedented".
Do we really want to travel around this country like a mole? The 20km of tunnel from St.P to Barking is tedious and unsafe enough; and that has a good sized (some might say grossly oversized) station midway.
If a generally surface alignment is not acceptable, do we really want the project at all?
This report into solving the Chiltern AONB problem shows the project is getting out-of-hand. Perhaps that is the idea?![]()
Take the estimated cost of tunnelling, and then reduce it a bit, before dividing it up to pay each person who has moaned a share. Then watch them stop moaning!
Agreed. Tunnelling under London is one thing but rural England? It's nonesense.
Do we want to live (or travel) like that? That is the question.
Even the cold war and nuclear threat didn't drive us underground.
Underground railways will work no matter what the weather (no speed restrictions or closures due to ice build up and so on).
There would be no cable thefts due to the lack of unauthorised track access and the route can be shorter as tunnels can proceed in straight lines in most cases with no respect for the aboveground terrain.
If we can afford the tunnels then we should have them.
If HS2-1 was essentially all in tunnel construction would probably have started by now.