Sonik
Member
In terms of maximising the oversite potential including of the HS2 station it was realised that the size of the slab over the total station area needed to be maximised. A micro 6 platform HS2 station is fairly useless and much of the usable over site building height is limited by protected site lines in places hence there needs to be a coherent all Euston station redevelopment to get any decent about of revenue from over site development (look at Lord H.'s comments over the last year carefully).
Really interesting, I hadn't picked this up but it makes sense.
One of the key messages is that TfL are viewed as being responsible for (funding) any linkages to Euston Square
Hendy mentioned before that the HS2 station *looks* very expensive for what it is, because it includes the (very costly) LUL upgrade.
The LUL station needs sorting out regardless, so arguably it should be a separate project with it's own budget. Exactly this was done at TCR before Crossrail arrived, so there is precedent.
Last edited: