Class 170101
On Moderation
- Joined
- 1 Mar 2014
- Messages
- 8,661
Whilst seats are seats and cancellations do happen everyday for various reasons the railway needs listen to its customers and act on reasonable concerns as at the moment, I would suggest, it is failing to so.We have done this before, the WCML has had plenty of disruption af Euston and will have plenty more when Handsacre is built. Im not sure what the engineering block has to do with them not liking IET seats or a train being cancelled. The seats are the seats and trains are cancelled every day.
I would suggest GWR need to look at extra options from Euston if possible or secondly could some services have been operated to Waterloo instead? Either IETs from Waterloo to Ealing Broadway via Kensington Olympia and SW Sidings, or perhaps IETs or Class 387s between Waterloo and Reading, and then onto GW destinations.