As Abellio is owned by the Dutch State Railway, I didn't think it had any shareholders.
As long as they run a decent enough service to maintain their profit and that the DFT don't blacklist them - why would they spend shareholders money for the sake of passengers.
If I was a shareholder and found out the managers had approved large sums for no return - I would not be too impressed.
Still think it is cheeky to announce Norwich trains as "9 carriages instead of 10" or even "8 carriages instead of 10"- those numbers include the DVT, which to a passenger is definitely not a carriage!
Exactly what I was going to say. Especially the bit about yard storage.
12.30up failed today causing chaos to late afternoon departures from London & those trying to get to NCFCs evening game at Carrow Road. Add to the earlier Cambridge line fatality knocking out 156 after this mornings 170 shortage & temporary failure of the short set covering locals & it's been a pretty rubbish day all round.
The dutch lot's only responsibility is to make a decent return for their shareholders, it is the DFT's responsibility to ensure a decent service can be provided. After the National Express disaster where they pocketed the money they should have spent on train repair this is far less than passengers deserve.
Realistically the 90's and Mk3's should be in line for replacement as they appear not to be a long term solution. Hand them back to the Rosco and add to the Hitachi order.
Last time I came past Ilford depot there were aprox 4 Mk3 s dumped at the back
A clear thinking fat controler would have refurbed them first so they could be put in service to allow 4 coaches to be refurbed with no impact on service
when the project is finished there would be spare stock to make up to 9 the remaining 8 car sets
also they should have 3 mk3 1st class coaches from the disbanded set used to make up the 9 car sets
I so wish I was the fat controler I would sort things out..May cost a bit but the Dutch railways can afford it
My only comment on that is that if the preservationists can restore barry wrecks to main line condition I am sure Iflord with all their resorses could patch them up as good as new
Thought GA got rid of that short set on drag that bombs to Yarmouth and back in emergencies
So why is the stock "knackered"? The 360's are only 10 years old. There have been quite a few failures of the GSMR cab radio recently.
I'm currently on the delayed 09.02 from Liverpool Street which has been held up behind the 09.00 to Norwich which has developed a fault. Yay!
Where have you been??
I've been to Norwich several times in the last 18 months and ain't seen it, it used to be parked up in the siding next to the station, failing that at Crown Point, just ain't seen it
I've been to Norwich several times in the last 18 months and ain't seen it, it used to be parked up in the siding next to the station, failing that at Crown Point, just ain't seen it
Well Norwich drivers are being trained on 37/4s in 6wks time. DBSOs return too hopefully.
Well Norwich drivers are being trained on 37/4s in 6wks time. DBSOs return too hopefully.
Are these in preparation for the Yarmouth Drags or just more traction knowledge for the DMU standby? Which TOCs 37/4s will be used as well?
Replacement contract for the DRS 47s. More should come out over the next few days. Sounds superb news to me. Should also give a couple more coaches back to the Mainline fleet to bolster things & stem the understandable backlash from commuters for the poorly managed overcrowding seen due to short formations.
Won't be replacing the DRS 47 that was used for thunderbird duties as a 90 now does it?
Replacement contract for the DRS 47s. More should come out over the next few days. Sounds superb news to me. Should also give a couple more coaches back to the Mainline fleet to bolster things & stem the understandable backlash from commuters for the poorly managed overcrowding seen due to short formations.
..........What I would say though is that timetabling/signalling/pathing, whatever it is, still leaves a lot to be desired. A considerable majority (at least 70%, possibly more) of services on the fast GE lines are late by 2-3 minutes or more. That's not a day-ruiner really, though it can be annoying if it causes you to miss a connecting tube that's not very frequent, but it does give off a pretty negative impression, and I do have to add a few minutes of 'delay time' into my journeys on GA, whereas I don't bother on c2c. If it happens, it happens. This situation has got no worse with GA vs NXEA, but hasn't really got any better either.
The only [timetable] change I was annoyed by was the removal of the direct Peterborough service. I can understand its removal, but it was handy for a couple of people I know to commute from Colchester to Peterborough on a single train. I would have at least thought they could make the Ipswich - Peterborough service 1tph after killing off the direct link to London. Apparently not.
Replacement contract for the DRS 47s. More should come out over the next few days. Sounds superb news to me. Should also give a couple more coaches back to the Mainline fleet to bolster things & stem the understandable backlash from commuters for the poorly managed overcrowding seen due to short formations.
Ipswich - Peterborough hourly needs two more DMUs. Simply none available, people have tried.
You know things are getting bad when you're using 50 year old technology to improve reliability![]()
As things are a bit confusing: are the 37s coming from DRS complete with carriages including a DBSO, or is that a load of crossed wires just there?