It's become evident over the last 4 or 5 months that there's something up at GA. We had the understandable issues after the St. Jude's Storm when certain services were booked as short-formed while a large number of units had pantograph repairs, but there are still big problems.

I can't remember the last time I walked through Liverpool Street on my way home and didn't here an announcement about a cancellation, delay or short form due to unit failure. I was 15 late into LST this morning due to a broken-down train.

What's going on? I know the stock is knackered but why is it so prevalent all of a sudden?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Dave1987

On Moderation
Joined
20 Oct 2012
Messages
4,563
It's become evident over the last 4 or 5 months that there's something up at GA. We had the understandable issues after the St. Jude's Storm when certain services were booked as short-formed while a large number of units had pantograph repairs, but there are still big problems.

I can't remember the last time I walked through Liverpool Street on my way home and didn't here an announcement about a cancellation, delay or short form due to unit failure. I was 15 late into LST this morning due to a broken-down train.

What's going on? I know the stock is knackered but why is it so prevalent all of a sudden?

So why is the stock "knackered"? The 360's are only 10 years old. There have been quite a few failures of the GSMR cab radio recently.
 

doris

Member
Joined
7 Jun 2011
Messages
7
Service has gone completely down the pan over last 6 months. No money being invested + various cost saving activities like overtime bans etc.

Paint jobs at the expense of fixing traction motors and fixing the leaking roof seals in half the mk3s is a joke.

Not hiring in mk3s from elsewhere to prop up the ldn-nor whilst paint jobs ongoing is another example of penny pinching / poor management.

Complaints to mp's / dft etc have gone through the roof of late, so let's hope we see the back of the Dutch lot sooner rather than later. Trouble is the same inept middle management will stay.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Still think it is cheeky to announce Norwich trains as "9 carriages instead of 10" or even "8 carriages instead of 10"- those numbers include the DVT, which to a passenger is definitely not a carriage!
 

Pugwash

Member
Joined
17 Nov 2011
Messages
336
The lack of investment in rolling stock goes back to national express, sticking plasters go on every time instead of a full over haul, this combined with that there is not enough reserve or spare stock to allow trains to go away for a full overhaul.

GA need to realise their fleet utilisation rate is not sustainable.
 

317666

Established Member
Joined
4 Sep 2009
Messages
1,775
Location
East Anglia
GA need to realise their fleet utilisation rate is not sustainable.

It probably wouldn't have been quite as bad if they hadn't sent all the 317/7s off-lease :roll: Presumably more cost-cutting as they were expensive to lease.

With regards to DVTs being counted as a coach, perhaps passengers should try to sit in the luggage compartment and explain to the guard that the announcements said it was a coach :lol:
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
What should happen (for passengers sake):
The new franchise to be let on a long franchise with the requirment that a substantial fleet upgrade be carried out, without large ticket price hikes. In fantasy world:
a 317 & 321 "super refurb", using the new gangway cab design proposed for the 319s, to a single common standard, allowing them to be used a single fleet. As part of this, bring in the FCC, LM and Northern 317, 321 & 322 fleets, giving up the 360s. All air conditioned, wifi, AC motors, plug sockets (and in my fantasy world, no 1st class).

Mark 3 fleet: Take up one of the "Driving carriage instead of DVT" options. Expand fleet so that all formations are "10 carriage", all with the same 1st/catering/standard configuration. Power doors. Plug sockets. Wifi.

Diesel fleet: Use cascades, swaps etc to standardise fleet to a single class, mix of 2 & 3 car units- probably 170s. Single class, as with the EMU fleet.


What will actually happen:
Operator will get away with minimal fleet investment but big ticket hikes.
 

slick

Member
Joined
5 Feb 2006
Messages
175
Location
Scotland
I cant account for the GE side but on the west anglia we have had dozens of failures recently related to GSMR radio. Basically there has been a software upgrade accross alot of the fleet and according to our fitters there were still bugs in the update which causes a GSMR failure code to arise which in turn makes the unit unfit for service. Ive had more train failures recentley due to GSMR problems than I have in past 5 years with other problems combined. 2 weeks ago there were four in one day on the 315s.
 

Dave1987

On Moderation
Joined
20 Oct 2012
Messages
4,563
Service has gone completely down the pan over last 6 months. No money being invested + various cost saving activities like overtime bans etc.

Paint jobs at the expense of fixing traction motors and fixing the leaking roof seals in half the mk3s is a joke.

Not hiring in mk3s from elsewhere to prop up the ldn-nor whilst paint jobs ongoing is another example of penny pinching / poor management.

Complaints to mp's / dft etc have gone through the roof of late, so let's hope we see the back of the Dutch lot sooner rather than later. Trouble is the same inept middle management will stay.

Overtime bans? Where did you get that from?

I believe the mk3 are being reprinted while they have a major maintenance done.

Also there have been a few chips found in pantographs recently.
 
Last edited:

Pugwash

Member
Joined
17 Nov 2011
Messages
336
so let's hope we see the back of the Dutch lot sooner rather than later. Trouble is the same inept middle management will stay.

It's not the fault of the 'dutch lot' the DFT will award the franchise to whoever offers to pay them the most money, the GA franchise pays out millions to the DFT every year, and the DFT will want to maximise that. Most of the MP's are in safe seats - so don't expect them to care.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
It's not the fault of the 'dutch lot' the DFT will award the franchise to whoever offers to pay them the most money, the GA franchise pays out millions to the DFT every year, and the DFT will want to maximise that. Most of the MP's are in safe seats - so don't expect them to care.
And its not 'middle management' but much higher up that at Abellio that a)signed up to pay big money back and b)won't spend anything they don't have to...
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,833
Location
East Anglia
With regards to DVTs being counted as a coach, perhaps passengers should try to sit in the luggage compartment and explain to the guard that the announcements said it was a coach :lol:

They can try. Train wouldn't move an inch :p
 

colchesterken

Member
Joined
12 Oct 2010
Messages
768
Last time I came past Ilford depot there were aprox 4 Mk3 s dumped at the back
A clear thinking fat controler would have refurbed them first so they could be put in service to allow 4 coaches to be refurbed with no impact on service
when the project is finished there would be spare stock to make up to 9 the remaining 8 car sets
also they should have 3 mk3 1st class coaches from the disbanded set used to make up the 9 car sets
I so wish I was the fat controler I would sort things out..May cost a bit but the Dutch railways can afford it
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
It's not the fault of the 'dutch lot' the DFT will award the franchise to whoever offers to pay them the most money, the GA franchise pays out millions to the DFT every year, and the DFT will want to maximise that. Most of the MP's are in safe seats - so don't expect them to care.

Well the 'Dutch lot' did put the bid together, and the DfT bought it, so equal responsibility there. As for the middle management, well they can only work with what they are given. Meanwhile making the remaining load 9s into load 10s (including DVT) is OK until you try to park them at Norwich and find some of the sidings aren't long enough :|
 
Last edited:

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,833
Location
East Anglia
Well the 'Dutch lot' did put the bid together, and the DfT bought it, so equal responsibility there. As for the middle management, well they can only work with what they are given. Meanwhile making the remaining load 8s into load 9s is OK until you try to park them at Norwich and find some of the sidings aren't long enough :|

Exactly what I was going to say. Especially the bit about yard storage.

12.30up failed today causing chaos to late afternoon departures from London & those trying to get to NCFCs evening game at Carrow Road. Add to the earlier Cambridge line fatality knocking out 156 after this mornings 170 shortage & temporary failure of the short set covering locals & it's been a pretty rubbish day all round.
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
Sorry, got in first! You do wonder if train failures are are a result of the units being worked more intensively with less overall maintenance opportunity. However GA do run a large number of trains, mostly over the same routes, so any failure will be magnified.

And then there are things outside your control such as the meltdown of the Central Line this morning causing delays to the Shenfield metro while everyone tried to squeeze aboard.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,833
Location
East Anglia
Sorry, got in first! You do wonder if train failures are are a result of the units being worked more intensively with less overall maintenance opportunity. However GA do run a large number of trains, mostly over the same routes, so any failure will be magnified.

And then there are things outside your control such as the meltdown of the Central Line this morning causing delays to the Shenfield metro while everyone tried to squeeze aboard.

It was astonishing how many punters where cramming into the Metros this morning & equally astonishing how many where still left on the platforms all the way along unable to board due to the sheer volume. On the other hand the main lines where doing fine til around 0900 & we arrived 3 early!
 

Sleepy

Established Member
Joined
15 Feb 2009
Messages
1,831
Location
East Anglia
Well the 'Dutch lot' did put the bid together, and the DfT bought it, so equal responsibility there. As for the middle management, well they can only work with what they are given. Meanwhile making the remaining load 9s into load 10s (including DVT) is OK until you try to park them at Norwich and find some of the sidings aren't long enough :|

Thought the sidings were made longer at Clown Point to accommodate load 10, and Royal Dock wired up also ?? NXEA also stated all sets would be Load 10 when they disbanded a set at last major timetable change - Dft project lots of seats ! great if you fancy trip from Stowmarket to LST in knackered 321 !!!
 
Last edited:

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,833
Location
East Anglia
Thought the findings were made longer at Clown Point to accommodate load 10, and Royal Dock wired up also ?? NXEA also stated all sets would be Load 10 when they disbanded a set at last major timetable change - Dft project lots of seats ! great if you fancy trip from Stowmarket to LST in knackered 321 !!!

Some roads where extended at Crown Point but not all. Space is limited. Royal Dock & adjacent siding where also wired but you can only get one Intercity set in at a time.
 
Last edited:

Pugwash

Member
Joined
17 Nov 2011
Messages
336
Well the 'Dutch lot' did put the bid together, and the DfT bought it, so equal responsibility there. As for the middle management, well they can only work with what they are given. Meanwhile making the remaining load 9s into load 10s (including DVT) is OK until you try to park them at Norwich and find some of the sidings aren't long enough :|

The dutch lot's only responsibility is to make a decent return for their shareholders, it is the DFT's responsibility to ensure a decent service can be provided. After the National Express disaster where they pocketed the money they should have spent on train repair this is far less than passengers deserve.

Realistically the 90's and Mk3's should be in line for replacement as they appear not to be a long term solution. Hand them back to the Rosco and add to the Hitachi order.
 

Dave1987

On Moderation
Joined
20 Oct 2012
Messages
4,563
The dutch lot's only responsibility is to make a decent return for their shareholders, it is the DFT's responsibility to ensure a decent service can be provided. After the National Express disaster where they pocketed the money they should have spent on train repair this is far less than passengers deserve.

Realistically the 90's and Mk3's should be in line for replacement as they appear not to be a long term solution. Hand them back to the Rosco and add to the Hitachi order.

Blimey why not just scrap every train in the country and add it to Hiatchi order :roll:
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,498
Location
Norwich
Realistically the 90's and Mk3's should be in line for replacement as they appear not to be a long term solution. Hand them back to the Rosco and add to the Hitachi order.

What actual facts (key word) make them not viable?
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,498
Location
Norwich
Where do you want to start, <D reliability, lack of seats compared to a DMU, do not meet disabled toilets, full of rust etc etc.

Reliability: The 90s won the Silver Spanner in 2012 for their uptime. This year I believe they scored fairly well again.

A hauled set has just as many disabled toilets as a EMU, plus the 18 others.

I can't say they are that much more or less rusty that most other stock of similar age.
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
The dutch lot's only responsibility is to make a decent return for their shareholders, it is the DFT's responsibility to ensure a decent service can be provided........

Really? I think you will find the terms of their Franchise Agreement does mention something about actually running the service.
 

joeykins82

Member
Joined
24 Jul 2012
Messages
601
Location
London
Well, one assumes that there are penalties in their franchise agreement that would mean that failure to run a decent service directly impacts on the decent return for their shareholders.
 

Pugwash

Member
Joined
17 Nov 2011
Messages
336
Really? I think you will find the terms of their Franchise Agreement does mention something about actually running the service.

As long as they run a decent enough service to maintain their profit and that the DFT don't blacklist them - why would they spend shareholders money for the sake of passengers.