From the consultation into the direct award
It will not be technically feasible to create electrified services over the Maidenhead Marlow route during the next franchise and retention of Class 16x Turbo trains on the route is now planned. FGW is working on plans to increase the frequency of trains serving the line
Timetable Improvements SLC 1: September 2015 to May 2017
The first period of operation will see todays timetable, including recent West of England and Cotswold enhancements, maintained. As anticipated, the Greenford services will be replaced by an Electric Multiple Unit (EMU) service between Paddington and Hayes & Harlington from May 2017, with a connecting shuttle services between West Ealing and Greenford.
SLC 2: May 2017 December 2018.
From May 2017, once suburban electrification and delivery of Class 365 and 387 electric (EMU) trains is complete, electric trains will commence operation on Thames Valley to London services. The much higher capacity of the fleet will see up to 32,225 seats and spaces arriving into London Paddington across the AM peak compared to a target of 31,200. Electrification will also enable replacement of peak hour HSTs on the London to Oxford route with EMUs running at 100mph. North Downs services (Reading to Gatwick Airport) will also see strengthening from the current 2 tph to 3 tph. An additional early London to Cornwall service, and Weston-Super-Mare to London service will commence operation. Cotswolds services are further strengthened with additional services to Worcester and Great Malvern. On the Cardiff to Portsmouth regional route, 3 car Class 158 trains are replaced with Class 165/166 trains in 5 car formations on most trains, to provide badly needed additional capacity. This is in response to the well documented and understood crowding issues on this popular route. FGW also intend to revise High Speed diagrams so as to make the West of England a discrete HST fleet and to provide an additional service to Cheltenham at 16.42 and to Bristol at 19.12. Turbo diesel (Class 165) trains that previously served the Thames Valley are then cascaded to the Bristol metropolitan area so that from 2018 a peak capacity of 8,700 seats is provided.
SLC 3: December 2018 to franchise end date In December 2018, the timetable change will see the culmination of all the enhancement work and new and cascaded rolling stock in a recast of the timetable and 110 mph operation, providing additional capacity and faster journeys. London & Thames Valley To build on the enhancements in SLC2, the December 2018 timetable change will see 110 mph operation on the Main (fast) lines enabling faster Oxford and Newbury services as well as additional fast peak hour trains from Swindon and Didcot to London Paddington. EMU trains will operate in 12 car formation on the Main lines and 8 car on the Relief (slow) lines. High Speed (HSS) services. New electric only and bi-mode Intercity Express Programme trains will replace HSTs on the majority of long distance routes with a standard off peak pattern of 4tph from London to Bristol, 2 via Bath and Chippenham and 2 via Bristol Parkway, and 2 tph from London to South Wales. 1 tph operates from London via the North Cotswolds to Worcester/Hereford, with a further 1 tph to Cheltenham as illustrated below:
Can't copy table on my tablet.
West of England services and New Trains In the current timetable proposals, IEP trains will not provide services on the main West of England route (via Castle Cary, Taunton and Exeter). As set out in the previous section, stakeholders from across the South West of the country and Cornish peninsula have lobbied for some time for faster, more frequent services to Exeter, Plymouth and Penzance. The December 2018 timetable provides a regular service of up to 2 trains per hour: An hourly service non-stop from Reading to Taunton, extending hourly to Plymouth and two hourly to Penzance resulting in a journey time saving of 13 minutes as illustrated in the table below. A two hourly, stopping service between Paddington and Exeter. In addition, Class 158 trains will provide approximately 2 tph via the Cornish mainline from Plymouth to Penzance, with some extensions to Exeter, while also achieving better,moreclockfaceconnectionswithCornishbranchlines.Thisagainisbeing provided in response to feedback from stakeholders as it has been one of their long standing aspirations.
39 Due to the need to conclude the Direct Award around a known contractual base, this timetable is currently envisaged to operate with life extended, PRM compliant Class 43 (HST) trains. However it is acknowledged that the HSTs, most of which date from 1975 to 1982, are becoming life expired and do not have the characteristics, capability or environmental performance of a modern train fleet. FGW is therefore pursuing a procurement for a new train fleet for the West and South West of England for delivery in time for the December 2018 (SLC3) timetable change. We expect this to conclude in June and accordingly the Franchise Agreement contains a switch to enable the new build fleet option to be taken if the Department determines that the business case for this investment is value for money. At the time of writing, Rail Executive is optimistic that FGW will be able to successfully conclude its procurement and make a strong proposal to the Department. Subject to contract and the Departments decision to proceed, we could then look forward to having a modern, high quality offering for the South West which is capable of further journey time savings: