• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Crossrail trains decision made Bombardier awarded contract

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,651
Location
Hampshire
ARGH! Please BBC & Other Media Outlets, Stop referring to Bombardier as a British Based Company with Widespread UK Manufacturing and Siemens as a Big Bad German Company.... When Bombardier are French Canadian with a HQ in BERLIN! <(

From the crossrail press release.

An estimated 74 per cent of contract spend will remain in the UK economy.
 

Monty

Established Member
Joined
12 Jun 2012
Messages
2,373
The irony that Siemens was founded in the UK and to this day has a significant part of its industrial base here. Hardly the big bad German company portrayed by the media.
 

Johnuk123

Established Member
Joined
19 Mar 2012
Messages
2,800
The irony that Siemens was founded in the UK and to this day has a significant part of its industrial base here. Hardly the big bad German company portrayed by the media.

It's still German.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,651
Location
Hampshire
It's still German.

But so is Bombardier Transportation (as a wholly owned subsidiary of a French Canadian firm!)

I cant find the list now but during the last Siemens / Bombardier debate, one of the magazines (Modern Railways) I think did a track and trace as to which countries most of Desiro vs. Electrostars components came from, and surprise surprise Siemens was found to manufacture most of it's Desiro components over here including the Train Control Systems, CCTV systems, The Desiro Cab units were constructed over here as a complete unit and shipped across too. I think even the seats used in the Thameslink 700 and 377/6 are produced over here too.

Besides, I'd have thought some government ministers would have caught onto Bombardiers interests in the UK when the Project Thor / E Voyager business went up in smoke, after Bombardier were granted money on the basis that they use the Preston built Alstom Onyx traction packages... only for Bombardier to drag their heels and eventually turn around and attempt to use their own package as used in the Electrostars produced in Sweden.
 
Last edited:

Monty

Established Member
Joined
12 Jun 2012
Messages
2,373
Bombardier is still Canadian, end of the day where a company's HQ is located is of little relevance. Let's be honest with ourselves the trains arn't built here, they are assembled here, nearly all of the components are manufactured abroad. While Siemens carries out no assembly in the UK unlike Bombardier and eventually Hitachi. It still greatly contributes to the industry and economy by employing a large skilled work force in this country to carry out maintenance.
 
Last edited:

hwl

Established Member
Joined
5 Feb 2012
Messages
8,287
The irony that Siemens was founded in the UK and to this day has a significant part of its industrial base here. Hardly the big bad German company portrayed by the media.

Indeed in Manchester. With Siemens supplying the electrical gear for then ground breaking LBSCR AC OHLE in South London over 100 year ago, they had a hit of bad patch during and after WW1 in the UK though.
Siemens also employs more people in the UK than Bombardier...
 

Monty

Established Member
Joined
12 Jun 2012
Messages
2,373
I wouldn't be surprised if they did, they are still planning to make redundancies (accounced a few years ago) after the S stock contract winds down.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Would be illegal under EU trade rules.

You are allowed to specify in the tender that whoever wins must create a certain amount of apprenticeships, redevelops a specified site, performs x research work, etc....
 

Johnuk123

Established Member
Joined
19 Mar 2012
Messages
2,800
Would be illegal under EU trade rules.

You are allowed to specify in the tender that whoever wins must create a certain amount of apprenticeships, redevelops a specified site, performs x research work, etc....


How do you know that all those things were done.
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
since the deal is now sealed, wouldn't now be the ideal opportunity for Bombardier to close the Derby works?

Just wait for it I have lost all faith in humanity :cry:.

With trains stuck for 3 hours in a tunnel with their pantograph welded to the OHLE and the door release buttons broken or missing, Crossrail will be lucky to achieve 2 trains per day...
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
With trains stuck for 3 hours in a tunnel with their pantograph welded to the OHLE and the door release buttons broken or missing, Crossrail will be lucky to achieve 2 trains per day...
Well this will be the ultimate test between Siemens and Bombardier. Both have new designs for trains to come into service at around the same time: Desiro City and Aventra mkII. In just a few years, we'll be able to hang around Farringdon station and really judge the build quality... :)
 

AndrewP

Member
Joined
5 Sep 2011
Messages
497
Would be illegal under EU trade rules.

You are allowed to specify in the tender that whoever wins must create a certain amount of apprenticeships, redevelops a specified site, performs x research work, etc....

This is a grey area but certainly local impact is a factor that can be considered in selection but I am not sure it has been tested in court.

I like Bombardier products as a customer but have huge respect for Siemens as a company and they are investing in the UK - they are a very British German company. I wonder if they considered an option with UK assembly from someone like Wabtec or one of the UK's bus manufacturers for example.

My prediction - the next suburban/regional train order will go to Hitachi.

The other thought is could Bombardier sell Derby and the UK designs to another company - there is bound to be Chinese interest.
 

LexyBoy

Established Member
Joined
23 Jan 2009
Messages
4,478
Location
North of the rivers
With trains stuck for 3 hours in a tunnel with their pantograph welded to the OHLE and the door release buttons broken or missing, Crossrail will be lucky to achieve 2 trains per day...

A bit of perspective needed on some of the anti-Bombardier comments methinks :roll:
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
The other thought is could Bombardier sell Derby and the UK designs to another company - there is bound to be Chinese interest.

Stadler would probably be interested. They've already bought a few plants and designs from Bombardier (RegioShuttle, Variobahn)
 

STEVIEBOY1

Established Member
Joined
31 Jul 2010
Messages
4,001
This must be good news for the people of Derby.

I can never understand why the western end of Crossrail is at Maidenhead rather than Reading, which I think it was meant to be years ago.
 

Simon11

Established Member
Joined
7 Nov 2010
Messages
1,389
I found it rather amusing reading the BBC article on the award:

"Bombardier boss Francis Poanessa: "We are the world leader in rail transportation""

Hmm, shouldn't the word cock-ups be included in that quote? Only a few weeks ago......
 

gingerheid

Established Member
Joined
2 Apr 2006
Messages
1,726
I found it rather amusing reading the BBC article on the award:

"Bombardier boss Francis Poanessa: "We are the world leader in rail transportation""

Hmm, shouldn't the word cock-ups be included in that quote? Only a few weeks ago......

At least it's not AnsaldoBreda.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
I take it all those screaming politics have been down the bookies and put lots of money on NX winning the concession to back their presumptions that TfL have played the British card and nothing else here?
 
Last edited:

ModernRailways

Established Member
Joined
21 Apr 2011
Messages
2,184
Can this thread be renamed to represent what is really happening... Something along the lines of 'Crossrail trains to be made by the Bombardier'. Is there any need for all the Bombardier bashing going on? Why can't we just discuss the contract instead or is that too much when it's easier to have a go at a company.

To me there trains run great. The S Stock has had minimal problems - the only big issue was the bogie sets on the first 15 S8s which could have happened with any company. The Electrostars are functional, and reliable. They may not have top notch maintenance but then when you look at Southern's 455s vs SWT 455s the SWT ones seem to be a lot more capable so to me that says that Southern's maintenance regime is not as strict so less gets done when they go in for maintenance.

From what I've read Shenfield to Liv Street will be going over to Crossrail next year so does that mean that Crossrail will be using the 315(?)s and changing the livery on them or is it staying with Greater Anglia until Crossrail is complete in 2017/2018?
 

Uzair

Member
Joined
15 Apr 2009
Messages
213
Location
London
The S Stock has had minimal problems - the only big issue was the bogie sets on the first 15 S8s which could have happened with any company.

The build quality of the S Stock is in my opinion, poor. Incessant creaks when running.
 

D7666

Member
Joined
12 Aug 2013
Messages
998
The build quality of the S Stock is in my opinion, poor. Incessant creaks when running.

I use S stock near daily.

The thing that has impressed me is how LITTLE they creak.

I've never noticed anything creaking on them.

--
Nick
 

Uzair

Member
Joined
15 Apr 2009
Messages
213
Location
London
I use S stock near daily.

The thing that has impressed me is how LITTLE they creak.

I've never noticed anything creaking on them.

--
Nick

Seriously? I have no idea on what to say then. It's not something I would come up with out of nowhere :D.
 

ModernRailways

Established Member
Joined
21 Apr 2011
Messages
2,184
The build quality of the S Stock is in my opinion, poor. Incessant creaks when running.

I'm yet to hear any creaking when I've been on them? The only thing that could possibly be the creak is the partition between carriages when the trains are going round corners.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
The similar partitions on their trams are really squeeky when new, the noise dissapears when they wear in.
 
Status
Not open for further replies.

Top