Goldfish62
Veteran Member
- Joined
- 14 Feb 2010
- Messages
- 13,125
I see 458502 is out of service yet again. If this is going to be the norm for the converted 458s (ie seemingly even less reliable than the converted 460s) then SWT have BIG problems!
I see 458502 is out of service yet again. If this is going to be the norm for the converted 458s (ie seemingly even less reliable than the converted 460s) then SWT have BIG problems!
One of the ex-460s was causing the short formations last week as I caught up with 458502 in service on Thursday. Are there still only six in service for six diagrams?
In theory they're are six diagrams as each unit is allocated an individual diagram in genius. The fact that they may not uncoupled all day long is neither here nor there...

8005 is still sitting at top yard sandwiched between two translators, no Colas unit there at moment though
47727 and 47739 went to Doncaster with translators yesterday. Not sure why both went.
Usual 5X58 path been put in for Monday night, I'm thinking it has to be 458536 this time (or 458530).
I travelled on 458502 this evening and can't say I was impressed. The floors were filthy and the seat covers had been reused from the previous incarnation, including in the converted 460 coach. The former First Class was very faded and the plug sockets have been removed.
The white trim around the window runners which has been ripped off over the years has not been renewed and to announce that "this train is for London Waterloo" as we left Waterloo on a Hounslow loop service is worse than ridiculous.
But it looked nice and shiny on the outside.
--- old post above --- --- new post below ---
I travelled on 458502 this evening and can't say I was impressed. The floors were filthy and the seat covers had been reused from the previous incarnation, including in the converted 460 coach. The former First Class was very faded and the plug sockets have been removed.
The white trim around the window runners which has been ripped off over the years has not been renewed and to announce that "this train is for London Waterloo" as we left Waterloo on a Hounslow loop service is worse than ridiculous.
But it looked nice and shiny on the outside.
458501 and 458503 were out on test today. Spotted them at Guildford earlier.
Both 47s required to top and tail a railvac over the weekend.47727 and 47739 went to Doncaster with translators yesterday. Not sure why both went.
Has SSWT done any analysis on how much more than expected this exercise is costing them, or are the books still open on the costs?
Is it an open cheque book or is their a point at which DfT stop paying because it's gone over an agreed amount?i doubt that SWT are too concerned with cost as money for HLOS project came from DFT , at least i think so.
Why did they feel the need to take out the plug sockets. I find such things useful. Could South West Trains take out the plug sockets on the 444s in the future? The 444s having plug sockets in one non first class carriage, in addition to having them in first class.I travelled on 458502 this evening and can't say I was impressed. The floors were filthy and the seat covers had been reused from the previous incarnation, including in the converted 460 coach. The former First Class was very faded and the plug sockets have been removed.
The white trim around the window runners which has been ripped off over the years has not been renewed and to announce that "this train is for London Waterloo" as we left Waterloo on a Hounslow loop service is worse than ridiculous.
But it looked nice and shiny on the outside.
--- old post above --- --- new post below ---
I travelled on 458502 this evening and can't say I was impressed. The floors were filthy and the seat covers had been reused from the previous incarnation, including in the converted 460 coach. The former First Class was very faded and the plug sockets have been removed.
The white trim around the window runners which has been ripped off over the years has not been renewed and to announce that "this train is for London Waterloo" as we left Waterloo on a Hounslow loop service is worse than ridiculous.
But it looked nice and shiny on the outside.
8005 is currently booked for departure on monday.
Has it changed now to Tuesday? I can only see 5X58 Doncaster to Wimbledon on Monday 27th and a 5X59 Wimbledon to Doncaster on Tuesday 28th.
Sockets are about you just gotta know where to look for them.
However the caveat is they're not surge protected so if your electronics get spiked on your head be it!
Since 458536, is the last 458/5 to be converted from Class 460 coaches I guess the next one will what will become 458501 i.e. 458001?
458501, 502, 503 and 504 are already delivered back to SWT. 458502 is (sometimes) in service, 501/503 were reported out under test as a pair a couple of pages ago. They aren't being done in numerical order generally though, 502 was the first of the ex-458s to be done, and 508030 has already gone north.
Bit of an oddball for this conversion surely?
I do have to wonder though what is causing all these issues, especially the persistent issues to 502.
both 47s required to top and tail a railvac over the weekend.
Anyone know the id of the additional car in 458504 please?