trains2064
Member
- Joined
- 23 Jul 2010
- Messages
- 188
172331 was moving round tyseley depot yesterday.
172331 was moving round tyseley depot yesterday.
Found this picture on the internet, the only picture of an Chiltern Railways Class 172(101) at the moment
http://www.flickr.com/photos/36593372@N04/5453933190/
Credit not mine
Indeed!Just want a bit more oomph from them then ill be
![]()
What does the letter "A" mean next to the unit number? I remember that the Class 321 units that used to be fitted for postal services had a "P" after (or was it before?) the unit number, but I've never seen the "A" used.
I think some ex-WSMR sets are being retained for the promised London - Birmingham Loco Hauled services.
All trains have an A end/cab and a B end/cab, it helps when there are faults, so they know in which end the fault is.
What does the letter "A" mean next to the unit number? I remember that the Class 321 units that used to be fitted for postal services had a "P" after (or was it before?) the unit number, but I've never seen the "A" used.
Might it be to indicate that the unit is ATP fitted?![]()
Might it be to indicate that the unit is ATP fitted?![]()
It identifies which way round the unit is when on the depot without having to see the side vehicle number. Chiltern happen to use A or B.
Some TOCs add a number corresponding to a digit of the vehicle number - for instance on a 158 a 2 or a 7 can differentiate between the 52nnn or 57nnn vehicle. Depot staff might refer to the '7 car' as a shorthand.
This EMT 158 on Wiki shows the 7 - low down on the right.
http://en.wikipedia.org/wiki/FileMT_Class_158_at_Piccadilly_Jan10.jpg
Seen 172332 on tyseley today in the company of 172331. They are both parked on the siding nearest the main line.
I might take a spin down to Tyseley and back to see for myself at some point.Sorry to disapoint, but it will most likely be delayed![]()
What's the reason for this delay?![]()
What's the reason for this delay?![]()
Ressesion, a significant amount of their suppliers went bankrupt and terms are getting worse and worse for trade, so production is slowing down, and uncertanty of future orders means they may be trying to keep this one going.
If the govt. wanted to support our country's trade they'd be tendering Derby for a new Mk6 Carrage, initally for Chiltern and other operators to use with AAR, TDM and other coupling systems.
If the govt. wanted to support our country's trade they'd be tendering Derby for a new Mk6 Carrage, initally for Chiltern and other operators to use with AAR, TDM and other coupling systems.
If the govt. wanted to support our country's trade they'd be tendering Derby for a new Mk6 Carrage, initally for Chiltern and other operators to use with AAR, TDM and other coupling systems.