Old Hill Bank
Member
As so much of the DMU cascade depends on the output at Derby can any of you out there provide progress info on the Class 172 build situation?
I have heard on another forum, not sure if its true or not that a london midland class 172 is nearing completion
Rumour has it they have got problems. The exhaust system is having issues and they cant get the test units anywhere near top speed. Jan 2011 for the first LM unit to appear apparently.
They are not promising reductions until they can prove there are any to have. No one in their right mind will say there are savings to be had without decent proof.
They are not promising reductions until they can prove there are any to have. No one in their right mind will say there are savings to be had without decent proof. The problem they have is that the 172 door cycle is a lot longer than a 150s, so the dwell times are likely to be increased, negating any benefit in running times.
Its all the stops that does it, 39 minutes journey, with 8 stops. 1 stop is going to cost 1½-2 minutes. You need some sort of semi-fast or fast service. It will get slighlty better post 2012 as Stourbridge - Droitwich gets re-signalled and all the absolute block nonsense gets binned.
I wonder how the LM end gangwayed (Sp?) units are coming along production wise? In the original 172 thread there was a guy called TurboStar_2533 who posted pictures from within Derby, it'd be nice to hear from him again.
There are 172s out to play on the GOBLin already, I've seen them twice in the last few days.
I assume they are on test, rather than in service but the timetable seems to change with the wind, so I can never remember when trains are due!
Not sure we will till the exhaust thing is sorted