Class 172 Production Progress

Status
Not open for further replies.

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
i disagree there isn't a future market for DMU's unless they plan on some pretty major electrification soon then there will be for next decade
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Wyvern

Established Member
Joined
27 Oct 2009
Messages
1,573
Bombardier are taking on 500 extra workers on a years contract.
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
Do you really think the whole British network would be electrified within the next 30 or 40 years?

No but there will probably be more wires meaning smaller production runs. Maybe Stadler have the best idea. A common design but with power modules to suit the power requirements...
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
There needs to be at least one last large class of DMU, even if they decided to electrify the whole network tommorow it would still take 30 years.
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
What has all this to do with "Class 172 Production Progress" are people incapable of starting thread of thier own!!!!!!!!
--- old post above --- --- new post below ---
Back to the point then, Derby have started working on a LM one again so says the press.
Test bed for the solution I presume.

Anyone have the detail?
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Back to the point then, Derby have started working on a LM one again so says the press.
Test bed for the solution I presume.

Anyone have the detail?

First ones due Tyseley May 2011. fGW hanging onto their 142s until Sept 2011. Timeline for eventual stock cascade right there. Only two years late... TF useless the lot of them. If anyone ever gives Bombardier a contract again, they need to be slapped around heavily.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
First ones due Tyseley May 2011. fGW hanging onto their 142s until Sept 2011. Timeline for eventual stock cascade right there. Only two years late... TF useless the lot of them. If anyone ever gives Bombardier a contract again, they need to be slapped around heavily.

You mean lets give all our contracts to Siemens whose 380s are allegedly impounded due to gauging issues??!!
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Not my fault Klaus forgot to check the new freight links for 23m vehicles!
 

Voyager 2093

Member
Joined
20 Aug 2007
Messages
494
Location
London
You mean lets give all our contracts to Siemens whose 380s are allegedly impounded due to gauging issues??!!

Siemens are usually good for reliability, I wouldn't count them out because of this problem which they will probably fix. The other Desiros work like a dream, yes they are more expensive than bombardier, but hey you get what you pay for. Hence the 377/5. If you do stuff on the cheap you will always end up paying for it, in the end.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Siemens are usually good for reliability, I wouldn't count them out because of this problem which they will probably fix. The other Desiros work like a dream,

Do you mean the 350/2s which are currently even less dreamlike than BR stuff and 458s, the BR stuff being far more shagged than the /2s could ever be tootling between Euston and Northampton every day?!
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
When they first got here though they were reliable, so maybe its LM?
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
I get the impression as a neutral that Siemens and SWT between them are very good at cooking the desiro reliability books on the dc.
They seem to for instance have cronic reliability issues with door operation.
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
Siemens are usually good for reliability, I wouldn't count them out because of this problem which they will probably fix. The other Desiros work like a dream, yes they are more expensive than bombardier, but hey you get what you pay for. Hence the 377/5. If you do stuff on the cheap you will always end up paying for it, in the end.

377/5s were rushed into use though.
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,829
Location
Nowhere Heath
I've not read the whole thread, as much of it is nothing to do with 172s it would seem. I have a query regarding them, this thread seems as good as any to ask it:

I'm off to London tonight, and will have about 8 hours to ned around London before the UKR tour on Saturday. Now I've got my new book, with the 172s in it, I have got interested in the possibility of seeing some.

So, anywhere I can see them in London at the moment? They're supposed to be on the Goblin line I'm aware, but are they there?
 

33056

Established Member
Joined
12 Nov 2007
Messages
2,424
Location
On a train somewhere in Europe
Not sure what is actually being used on the Goblin at the moment, but if you take a trip past Willesden TMD (on the mainline would be best), I would think that there is a good chance of some being parked outside.
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,829
Location
Nowhere Heath
Well, didn't get past Willesden yesterday morning in the end. Was on the south side of London all morning :oops:

Couldn't see any as we passed near-ish on The Ness Monster tour sadly.
 

Dreadnought

Member
Joined
1 Oct 2007
Messages
586
All Overground units deliverd but not sure about the others.

Don't believe 172003 or 172008 have been delivered to Willesden yet. 172008 had a test run to Bedford from Derby recently but not seen any reports of 172003 anywhere yet!
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,838
Location
UK
377/5s were rushed into use though.

Well you'd have to when you had been kept waiting so long!

The thing is, I thought the reason for the delay was down to a shortage of parts. Once they were procured, there was no reason for the trains to be built badly.
 

DjU

Member
Joined
12 Jul 2009
Messages
254
Location
Essex
Don't believe 172003 or 172008 have been delivered to Willesden yet. 172008 had a test run to Bedford from Derby recently but not seen any reports of 172003 anywhere yet!

I believe 008 may of been delivered last week.
 

traji00

Member
Joined
17 Aug 2009
Messages
241
Don't know if this helps much, but I passed Willesden Depot just now and there's 5 172's in there, plus I rode 172005 an hour ago. So that's at least 6?
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Don't believe 172003 or 172008 have been delivered to Willesden yet. 172008 had a test run to Bedford from Derby recently but not seen any reports of 172003 anywhere yet!

Both now delivered to Willesden - 003 arrived 31st August.
 