• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Banbury - all the changes

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

mikestone1952

Member
Joined
12 Feb 2011
Messages
299
I see that most if not all trains booked in the DGL are shown in RTT as DCV at Banbury Depot Junction, then platform 1 and DGL from Banbury North Junction.
;
Is there a seperate location for Banbury South Junction not picked up by RTT?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,652
Depends how they have done the revised TPRs. I can't see the point of timing at Banbury South if there isn't a signal section between that and the platform, you would just show the platform number at the Banbury timing point as that is enough to know where the trains are.
 

BanburyBlue

Member
Joined
18 May 2015
Messages
878
Photo's showing progress on platform 4.

Can see progress on new P4.
Old P4 disconnected (assume main line tracks already re-laid?)
New P3 starter.

These were taken Monday.

PS: Can anyone tell me why my photo's keep turning round when I upload them?
 

Attachments

  • old P4 2.jpg
    old P4 2.jpg
    168.4 KB · Views: 65
  • P3 starter.jpg
    P3 starter.jpg
    166 KB · Views: 58
  • P4 from B 3.jpg
    P4 from B 3.jpg
    174.7 KB · Views: 53
  • P4 from CP2.jpg
    P4 from CP2.jpg
    194.1 KB · Views: 59
Last edited:

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,574
Location
Brighton
PS: Can anyone tell me why my photo's keep turning round when I upload them?

The phone/camera will probably store the orientation of the device when the photo was taken in the image's metadata, so it can be automatically rotated. When this process goes awry then you can end up with incorrect rotation.
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,276
Location
East Midlands
The phone/camera will probably store the orientation of the device when the photo was taken in the image's metadata, so it can be automatically rotated. When this process goes awry then you can end up with incorrect rotation.

Further to this, there are a number of free tools for editing or removing this data (known as EXIF data).

Have a look at this:
http://www.techgyd.com/software-view-edit-remove-exif-data-from-photos/7762/

Just removing the EXIF data from a copy of the picture before you upload it is probably the simplest way to prevent the orientation from being changed.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,620
Location
Hampshire
For those of you in the area, the South Box has it's last day today. Presumably it's switched out tonight if not already, demolition sadly scheduled for tomorrow morning. Plant is already on site and ready to go.
 

BanburyBlue

Member
Joined
18 May 2015
Messages
878
For those of you in the area, the South Box has it's last day today. Presumably it's switched out tonight if not already, demolition sadly scheduled for tomorrow morning. Plant is already on site and ready to go.

Progress I know, but still a sad day.
 

L&Y Robert

Member
Joined
22 Apr 2012
Messages
585
Location
Banbury 3m South
For those of you in the area, the South Box has it's last day today. Presumably it's switched out tonight if not already, demolition sadly scheduled for tomorrow morning. Plant is already on site and ready to go.

Is anyone - any 'body' or organisation taking any of the works from inside? The lever frame, for example, or the block instruments? Then there's all the stuff outside - point rodding, cranks, signal wires and pulleys - that sort of thing. There has been a surfeit of signal-box gear in the past, but equipment like this must be getting fairly difficult to come by these days.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,551
Location
Torbay
Instruments, relays etc are easy to strip out quickly. Just cut all the wires, remove fixings where they're screwed down and lift out. Apart from the lead off bed immediately in front of the box most of the rodding, rollers, cranks, signal wires and pulleys can remain in place until later. The actual lever frame structure is usually self supporting and can be dismantled after the remainder of the building has been largely demolished around it.
 

keredsonej

Member
Joined
2 Jul 2016
Messages
10
S & T guys are going in after the box closes just before midnight. They have 8 hours to salvage spares/parts for use in the Worcester area before the box is demolished tomorrow morning.
 

keredsonej

Member
Joined
2 Jul 2016
Messages
10
Banbury South.jpgThe final stages of Banbury South in the early hours of Saturday 30th July. S & T staff are stripping spares and parts for use on the Worcester area.
 

DaveHarries

Established Member
Joined
12 Dec 2011
Messages
2,569
Location
England
Presumably 7-5-5 was exchanged between the 2 Banbury boxes?
Indeed it was: various videos and photos on the "Signalboxes and Signalling" group on Facebook. The lever frame at Banbury South was, however, not removed prior to demolition. :(

Dave
 

BanburyBlue

Member
Joined
18 May 2015
Messages
878
Indeed it was: various videos and photos on the "Signalboxes and Signalling" group on Facebook. The lever frame at Banbury South was, however, not removed prior to demolition. :(

Dave

Hi. Just looked and can't find this group on FB. Do you have a link?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,652
Why is that an insult? has it gone into a skip? or more likely someone has got and took it home with them.
 

mikestone1952

Member
Joined
12 Feb 2011
Messages
299
Wierdly the CrossCountry replacement buses from Didcot were labelled all stations to Banbury!
In reality they only served Oxford and even that seems pointless as there are GWR services to Oxford and a separate Oxford-Banbury-Leamington one.
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,432
Location
London
Wierdly the CrossCountry replacement buses from Didcot were labelled all stations to Banbury!
In reality they only served Oxford and even that seems pointless as there are GWR services to Oxford and a separate Oxford-Banbury-Leamington one.

Technically they are all stations...at least all the stations CrossCountry serve! But that's part of the reason there are Customer Service/Bus Co-ordinator staff, to ensure people get on the right bus.
 

Gagravarr

Member
Joined
3 Mar 2016
Messages
88
Wierdly the CrossCountry replacement buses from Didcot were labelled all stations to Banbury!
In reality they only served Oxford and even that seems pointless as there are GWR services to Oxford and a separate Oxford-Banbury-Leamington one.

From Oxford going south, GWR are running buses at :00 and :30. Cross Country are supposed to be running buses at :15 and :45, but I gather those are being run with the same ones that come down from Banbury and aren't on time. What seems to be happening is around :20 and :50, GWR being loading their buses in the absence of any Cross Country ones, then the CC buses get loaded around the hour / half our when they finally appear. Clear as mud...!
 

mikestone1952

Member
Joined
12 Feb 2011
Messages
299
Technically they are all stations...at least all the stations CrossCountry serve! But that's part of the reason there are Customer Service/Bus Co-ordinator staff, to ensure people get on the right bus.
;
Technically they aren't - technically "all stations" means just that. Bus co-ordinators rarely look at tickets and many people don't ask, in addition to the propensity for people to ask about a train/bus's destination rather than where they actually want to go.
 

BanburyBlue

Member
Joined
18 May 2015
Messages
878
Just walked over the Middleton Road bridge today.

Platform 4 looking like a platform now - tarmac and paving in place, just doing some finishing off work.

Platform 2 bay filled in with hard-core - assume this will be 'tarmacked(?)' over.

Yesterday (Thursday) the down relief past platform 1 had no track, today all in place - amazing the difference a day makes. Although can't see any evidence of the turnouts from the down goods to the down main beyond the North box?

One thing that did surprise me was that there were engineers just north of the road bridge pulling in what I assume were signalling/telecommunications/points cables. I would have thought this would all have been done by now? Now Friday, line re-opens Monday - must be a hell of a lot of functional/safety testing required before a live train is allowed on the track?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
RTT suggests all is fine through Banbury today.
Is the work completely complete, or are there bits still waiting to be commissioned?
 

Bill EWS

Member
Joined
10 Feb 2006
Messages
673
Location
Didcot
Returning from Aberdeen last Wednesday the bus connection for Didcot was very good. A none-stop run from Leamington Spa to Didcot and I arrived home a lot earlier than with the change at Oxford. No complaints there.
 

BanburyBlue

Member
Joined
18 May 2015
Messages
878
See on National Rail, that signal problems at Kings Sutton causing delays - teething problems I assume?

BTW, is it King's Sutton, or Kings Sutton?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
See on National Rail, that signal problems at Kings Sutton causing delays - teething problems I assume?
BTW, is it King's Sutton, or Kings Sutton?

The village itself thinks it's King's Sutton (like King's Cross, King's Norton and King's Lynn). http://www.kingssutton.org/
I don't know what the railway thinks, but Quail only has Cross/Lynn with an apostrophe. ;)
Of course in some circumstances it could be Kings', but I can't think of an example of that (but there is a Queens' College in Cambridge).
 
Status
Not open for further replies.

Top