Here is an extract from the yellow peril for Banbury station area
Last edited:
I guess the big issue with the length of Platform 4 is the current station building. Earlier posts (no 26) do mention "133m platform with a passive for 300m". I'm assuming this means it could be extended in the future to 300m.
But, in order to do this, a lot of building work would be required on the east side of platform 3 to allow access to the new extended platform 4.
At this point it probably comes down to cost vs benefits.
Passive provision could be just a matter of there being sufficient space for the rear face of the platform to be extended out by 2 metres (which I think is the minimum clearance to platform buildings on an island) and then extend it past the stairs and extend the south end right out to match. Then cut a few openings in the wall (probably a simplification...)
I guess it depends mainly on two things. Firstly if there is a couple of metres space on the outside of the future up freight loop, so it would be a track slew only, with junctions and signalling remaining the same as the forthcoming changes. Secondly whether or not there is space to approach the slewed tracks under the nearby road bridge.
At least the footbridge extension over to the new car park seems to span a reasonable distance away from the back of the platform for any extension.
Passive provision could be just a matter of there being sufficient space for the rear face of the platform to be extended out by 2 metres (which I think is the minimum clearance to platform buildings on an island) and then extend it past the stairs and extend the south end right out to match. Then cut a few openings in the wall (probably a simplification...)
What is happening with the 'yellow plant' siding? In the original plans submitted by Chiltern for the new depot, I'm sure there was a statement saying space was left for Network Rail engineering train sidings, but this would be subject to a separate planning application. However, on the great track diagrams produced earlier in this thread, it seems to suggest these sidings will be near the stone terminal?
Great thanks.
So are Reservoir sidings 1 & 2 the stone terminal and Reservoir sidings 3 &4 the engineering sidings, or t'other way round.
Any chance of the section towards Ahyno please, as I believe there are several extra signals.
;
Interesting to see that JIs are being provided on the signals for up departures from the down platform - presumably that will be the only route with a main aspect - from the down but not for down trains from the up platform.
The junction indicators that have been installed at the south end of the down platform are purely for future proofing.
No - it's easy! The building has a reinforced concrete frame (1950s Modernisation Plan!) and the "Walls" are really brick panels within the structural concrete frame members. Whilst the panels do have a cross-bracing function, you could lose two or three of them - the ones remaining would do that job OK.
I see from Banbury Blue's picture that something which looks like a parking meter has been installed (together with long cable trench to it) on the existing platform just by the nearest lamp standard. What can this be?
I think it may be a Signal phone....
There will be 2 power supplies north of Banbury, 1 in the concrete plant and 1 on Hamilton Close( presumably that's the one you saw)
This is the only reference to an almost complete closure at Oxford (only Worcester line trains operating M-F).Andy Cooper, managing director of CrossCountry, said: “The area around Hinksey has often suffered from flooding, and it was only two years ago that the line was closed for several days because of this. While we are sorry that some customers could be inconvenienced while the works take place, and while the railway through Banbury is upgraded at the same time, we trust they will understand their importance in helping deliver a better and more reliable railway.”
Major engineering work is taking place between Didcot Parkway and Leamington Spa, closing various lines.
Network Rail has put out a press release on the 9-day blockade starting this Saturday.
Like previous publicity it describes the blockade as being Bicester-Banbury-Leamington.
Then from left-field comes a remark by an XC manager about work at Hinksey.
Network Rail is also carrying out upgrade work at Hinksey, near Oxford, to reduce flooding incidents which have affected the railway in the past.
A total of £18m is being spent to make the railway more resilient which will mean services between Oxford and Didcot Parkway will also be affected between Saturday, 30 July and Sunday, 14 August.
I see there is a separate press item on the 16-day Hinksey closure:
http://www.networkrailmediacentre.c...-improve-railway-reliability-for-passengers-1
I guess it's because two NR Routes are involved in the two blockades, with different objectives.
XC gets caught either way (now with its own Virtual Route of course)!
Just the time to get all those masts up Didcot-Oxford...
The flood alleviation work, which involves raising the height of tracks to prevent them from being flooded, will take place between Oxford and Didcot Parkway...