  1. R

    Wrexham Central - why?

    At Bidston there is room for a dedicated platform on the south side of the station. By doing that trains for Wrexham would not affect the line. At Wrexham central extend the line along the original route putting stations at Hightown halt and Marchwiel where they were originally then continuing...
  2. R

    Potential fix for Ordsall Chord?

    If an underground station was built it should be made to allow longer trains to stop there.
  3. R

    Potential fix for Ordsall Chord?

    Trains from Blackpool, Lakes etc would be able to go to the airport via Hartford junction. Therefore not going through Manchester.
  4. R

    Line worthy of reopening

    There are potential plans for a freight terminal to be built on the old works site. so it would not be a waste of time putting in a line there. If the terminal goes ahead then it would reopen the line across the ship canal. see https://railfuture.org.uk/display2302
  5. R

    Line worthy of reopening

    One line that should be reopened is the line from West Timperley to Partington. A new Station at Partington on the original site then a new station at west Timperley by the Broadheath community hall and Turnbull road. Rebuilding Baguley station just west of Brooks drive. Rebuilding Northenden...
  6. R

    HS2 Manchester leg scrapped: what should happen now?

    Its all well and good getting HS2 to Crewe but there is a bottleneck for trains going north. The line drops from 4 lines to 2. The route north needs to be 4 lines. It goes from 4 to 2 then back to 4 then to 2. these gaps of 2 lines need to be made4 removing the bottleneck.
  7. R

    Potential fix for Ordsall Chord?

    One solution which would benefit the Airport and Piccadilly station would be. Build a new line from just north of Mobberley station and run underground under the airport and create a new underground station linked to the existing one then run out and link with the existing line and onward to...
  8. R

    Loading gauge question

    Hoping this is the right place. What is the difference between loading gauge 6 and 6A?
  9. R

    Potential fix for Ordsall Chord?

    If they are going to demolish the campus buildings. There needs to be in place an order to prevent them building next to the line leaving enough room for the tracks to be quadrupled.
  10. R

    Potential fix for Ordsall Chord?

    Biggerisbetter your ideas do not create any more paths along the Castlefield corridor. Its more paths that is needed. One way that might help is another line starting from the east of Piccadilly station and running to the southern side of platform 12 and rejoining the line further down...
  11. R

    Potential fix for Ordsall Chord?

    Liverpool Manchester Piccadilly service for one. https://www.realtimetrains.co.uk/service/gb-nr:W32772/2023-12-11/detailed#allox_id=0
  12. R

    Potential fix for Ordsall Chord?

    There is another option. There used to be a chord just east of Piccadilly (Ardwick junction I think) It swung north over Ashton old road and joined up with the line at midland junction the line diverges at Philips Park junction and from there you can get to Victoria station. If this chord was...
  13. R

    Punctuality

    Which UK line is the worst for time keeping??
  14. R

    Wrexham, Shropshire & Midlands Railway updates

    The 2 bay platforms are about 90 ish and 80 meters long bay 2 80M could be extended by about 30M as could bay 1. But there is no crossover from the north bound line into the bays. As going to Chester it would need the short bit of single line redoubling. Thinking on the points south of the bay...
  15. R

    Does HS2 Still Need 400m Trains?

    It will be interesting to see if they can cope with winter conditions in Cumbria and southern Scotland. These trains have been built as light weight will they get traction in snow and ice?
  16. R

    Does HS2 Still Need 400m Trains?

    If they change the paths for the WCML there will be ripples across the whole rail network.
  17. R

    Could the Atherton line become part of Metrolink, and would that disbenefit passengers?

    Metro link has stolen enough rail lines. Losing more lines could cause problems at a later date for rail operators.
  18. R

    Does HS2 Still Need 400m Trains?

    A HS2 service to Scotland is not going to work most of the line is dual (1 up 1 down) HS2 train will get stopped by an all stations stopping passenger or a slow freight. People have great ideas but dont see the problems. Its the same with the route to Liverpool 2lines.