Search results

  1. P

    Transport for Wales Class 230

    Realtime Trains suggests it was 010 which was on the 09:32 arrival at Bidston, but the next round trip to Wrexham to cancelled. It came back into service for the next trip from Bidston at 11:51 and stayed out in service...
  2. P

    MML Electrification: progress updates

    I came across this recent cabride video today, including a run on the MML slow lines from West Hampstead to Bedford. It's not so easy to see but I think you can spot new registration arms on the fast lines and shiny new headspans. But I'm no expert!
  3. P

    Class 701 'Aventra' trains for South Western Railway: progress updates

    An increase to 7 701 units in passenger service this morning: 017, 031, 034, 036, 037, 039 & 043.
  4. P

    BBC - UK investigating claims green fuel [HVO] contains virgin palm oil

    https://www.bbc.com/news/articles/cm24n8nej94o I've seen a number of operators proudly demonstrating diesel trains fuelled by HVO. Turns out it might not be so green after all. Perhaps the only answer to decarbonise railways really is electrification.
  5. P

    South Wales 'Metro' updates

    https://news.tfw.wales/blog/coryton-line-services?fbclid=IwY2xjawJLSnhleHRuA2FlbQIxMQABHV4WEmOO6U_KOnecYjcteLJB9Vx__Qluhi3q3PMXtbEKSMjm1RplK0Stvg_aem_qRltgBVptslcAgwHMyW_Tw From next week Penarth - Caerphilly trains won't stop at Lisvane, Llanishen or Heath to increase turnaround times to 10...
  6. P

    Stations rebranded to Great British Railways design / Rail Alphabet 2 & 3

    Recently this rather impressive double-sided totem sign has appeared at London Waterloo, at the bottom of the ramp to the international platforms. It appears to be the latest spec with the new arrows, and has the black and red border shown in the design manual. I have also just spotted a...
  7. P

    Merseyrail semi-fast running antics.

    When services only have a 4 minute turnaround time after each 1.5 hour journey, then a 3 minute delay is significant. Of course it will inconvenience some people but without intervention it will delay many more people throughout the day, as well as delaying over services on the loop line in...
  8. P

    Transpennine Route Upgrade and Electrification updates

    Something I noticed is the work still required at Colton Junction. It's clear that it isn't finished and that the headspans over the junction are being replaced by portals. The portals are in the place but the wires need transferring and the headspans removed.
  9. P

    WCML rewiring 2026 to 2036

    Apologies if already mentioned, but isn't this the TriLink project? https://www.railengineer.co.uk/trilink-the-intelligent-renewal-of-west-coast-main-line-north/ A cross industry partnership to completely renew and slightly enhance the north WCML. The Rail Engineer article mentions track...
  10. P

    ECML vs GWML Electrification masts

    Indeed! Designing for quick installation didn't mean it turned out that way in practice! Although I believe most of the delays on the GWEP were with piling, rather than installing the masts and booms etc.
  11. P

    ECML vs GWML Electrification masts

    This is an interesting talk from the Permanent Way Institution YouTube channel titled "Great Western electrification: why are the masts so big? It covers details which may not be obvious at first glance. For example the TTC* structures in that picture were designed for quick installation to...
  12. P

    ETCS Vulnerability to Radio Outage

    Certainly plenty of delays and a few cancellations through the Thameslink core this morning but looking on Recent Train Times it was actually worse yesterday!
  13. P

    ETCS Vulnerability to Radio Outage

    RealTimeTrains suggests there were a couple of cancellations at Aberystwyth and delays on all lines but everything from Pwllheli ran this morning.
  14. P

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Luckily when they extended platforms to 10 car lengths about 10 years ago, they stuck the 8 and 10 car stop boards on the same post, so little chance of that happening.
  15. P

    Transpennine Route Upgrade and Electrification updates

    https://www.flickr.com/photos/rob_transpennine_upgrade/ This is the link, the photos are excellent.
  16. P

    Cross Country Cancellations - Emergency Timetable

    From what I can see from Realtime Trains. The Monday to Friday service is virtually unchanged. Edited - On Saturday nights the 2210 is extended from Gloucester to Cheltenham. The last train is still the 23:18 to Gloucester.
  17. P

    Cross Country Cancellations - Emergency Timetable

    TfW are not making cuts to this route. They are changing to terminate at Cardiff instead of running through to Maesteg, which should actually improve reliability.
  18. P

    New Station calendar

    Liverpool Baltic planning application is now available to view. https://lar.liverpool.gov.uk/planning/index.html?fa=search 24F/2999 Includes significant public realm improvements by completely remodelling nearby roads to be more friendly. A lot of work has gone into fire safety and compliance...
  19. P

    Northumberland Line reopening: progress updates

    I stumbled across this video filmed on one of the preview services recently. It shows the progress made at each station. Newsham looks like it could definitely open soon. Northumberland Park - earthworks look done but platform construction has only just started. Blyth - Platform construction...
  20. P

    New Station calendar

    Planning application submitted for Golborne station. Basic 2 platform station on the WCML fast lines with a footbridge with lifts linking the station to both sides of the town. To be served by a 1tph service between Wigan and Manchester Victoria (And beyond). Application A/24/98015/MAJOR on the...