• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. M

    Southeastern metro fleet replacement/improvement

    On a 465 today which had all this metal casework where 2 seats would usually be, just behind the cab - any ideas what it’s for? Have never seen before.
  2. M

    Southeastern metro fleet replacement/improvement

    Not strictly metro-related, but this line in a press release on the May timetable change would suggest that all services terminating at Tunbridge Wells will be run as Networkers from the middle of next month, as the 375s can't run in 10-car formation+...
  3. M

    Southeastern metro fleet replacement/improvement

    There is another path in leaving CHX at 12:27, which is presumably the unit in question returning to depot (given the Z headcode) https://www.realtimetrains.co.uk/service/gb-nr:J26921/2025-02-25/detailed
  4. M

    Southeastern metro fleet replacement/improvement

    Indeed, the point on demand is also why CST services often split/join to run as 4-car services outside the peaks, while the CHX services usually run full length all day.
  5. M

    Southeastern metro fleet replacement/improvement

    12-car networker diagrams are quite problematic on several parts of the SE network - among other issues, platforms at Woolwich Dockyard are too short, while only 3 of the platforms at Charing X can be used by 3x 465s coupled up
  6. M

    Derailment at Ramsgate (29/11/24)

    Southeastern Chief Exec has confirmed via Twitter/X that the unit has been moved, with some additional pictures https://x.com/SteveWhiteRail/status/1891382785182515654 (images show various stages of the unit being re-railed/removed)
  7. M

    Southeastern metro fleet replacement/improvement

    The NR sectional appendix shows that 707s are NOT cleared to Tunbridge Wells, and that they're cleared beyond Sevenoaks to Tonbridge/Ashford Int'l as ECS only.
  8. M

    City Thameslink flooded on 2025-02-03

    City Thameslink is again closed today (TLRailUK on X/Twitter)
  9. M

    Storm Herminia Disruption - 26/01 onwards

    Few issues on Southeastern this morning - tree down near Faversham, tree down at Frant, and a power supply issue on the Bexleyheath line (though not sure if the latter is weather-related).
  10. M

    Storm Eowyn Disruption - 24/1/25

    Flooding at Canary Wharf per TfL. Living not far from there the weather hasn’t been too bad today (relatively speaking) so not sure if there’s some other issue occurring
  11. M

    Storm Eowyn Disruption - 24/1/25

    Here's the tree in question via GA website
  12. M

    Storm Eowyn Disruption - 24/1/25

    To clarify this is a WCML closure NORTH OF PRESTON over that period, not the entire line.
  13. M

    Class 376 refurbishment 2025/2026

    707s are likely considerably easier to fit toilets to as they were built with passive provision for it
  14. M

    Class 376 refurbishment 2025/2026

    Via SE's Twitter/X feed this morning, refresh will include Power sockets New lighting Blue exterior (presumably to match the 707s & 375s) https://x.com/Se_Railway/status/1876903588422689203
  15. M

    Class 376 refurbishment 2025/2026

    Some mock-ups of the new interior were posted last year for those interested https://x.com/SteveWhiteRail/status/1711735969840324778
  16. M

    465/466s south of Tunbridge Wells, has it ever happened?

    Neither 465s nor 466s are cleared between Tunbridge Wells & Bo Peep Junction (West St Leonards) per the sectional appendix. Networkers are cleared, and do regularly use, the turnback siding at TW, however.
  17. M

    Storm Henk travel disruption 02/01/24

    Issuing "Do Not Travel" warnings after everyone has got to work, and just before they start their evening commutes, often with no alternative routes, is rather farcical.
  18. M

    Storm Henk travel disruption 02/01/24

    Southeastern looks to be slowly but surely falling apart - multiple trees fallen at Wadhurst blocking the Hastings line, tree also looks to be on the line at Petts Wood blocking the SE main line
  19. M

    New toilets at London Bridge

    Toilets will be located before the gateline on Stainer St, hoardings for the work are already up.
  20. M

    Question about train length

    This will be a mistake. Most Maidstone East services run as 8 coaches.

Top