Is it slipping or is it being told to slow down, my money is very much on the second.
What is Labour's official stance on HS2 (and HS3, given the amount of integration between the two in the initial planning phases)? Would I be correct in my presumption that they would reinstate both in full (i.e. HS2 east and the Goldborne link, as well as a full HS line for HS3)?I think what the government say on HS2 is becoming increasingly irrelevant, any parts that are likely to be cancelled or deferred are not going to be starting construction in the remaining lifetime of this parliament so (if the polls are to be believed) what Labour thinks on the project is more important to the future of HS2 as if they win they can simply reverse any decisions taken now once in power.
What is Labour's official stance on HS2 (and HS3, given the amount of integration between the two in the initial planning phases)? Would I be correct in my presumption that they would reinstate both in full (i.e. HS2 east and the Goldborne link, as well as a full HS line for HS3)?
Labour leader Sir Keir Starmer has called for the Government to commit to building HS2 and ensure vital infrastructure is in place to boost the North’s beleagured rail network.
Speaking at the Labour Conference in Liverpool, Louise Haigh (pictured) said her ‘number one priority’ as secretary of state would be to end what she called a ‘spiral of decline on our public transport system’.
She said: ‘Labour in power will bring our railways back into public ownership as contracts expire.’
Ms Haigh said that under the Conservatives, Britain’s railways ‘have become a cash machine for companies and foreign governments, adding: ‘No matter the performance, failure will always be rewarded.’
She said: 'The truth is, the Conservatives still worship the dogma that has let this country down. They will always give the operators one more chance. And shareholders one more pay-day. They will do whatever it takes to prop up a failed system. Because to do anything else would be to admit their ideology is wrong.
Such a move would mean it was completed before 2045, whilst still being incomplete.The way things are going we'll just get Phase 1 if we're lucky...
Until there is a change of government shortly ?Not sure there are many benefits of the East Midlands Parkway branch and its already been kicked into the very long grass.
Not sure there are many benefits of the East Midlands Parkway branch and its already been kicked into the very long grass.
Slight issue with royal assent, notice to proceed, contractors and detailed design first.If I wanted to reduce costs, I'd get construction on phase 2 beginning by end of next year, with the whole thing opening in the next decade. Delaying will never reduce costs as there's always inflation.
Kier Starmer said so in October 2021
As has Shadow Transport secretary Louise Haigh at Labour’s conference last year
Haigh seeks nationalised rail plus 'full' NPR and HS2 - The Transport Network
www.transport-network.co.uk
Phase 2a already has royal accent and some contracts already given out. I'm sure 18 months to begin construction is possible of there was the political will for that section.Slight issue with royal assent, notice to proceed, contractors and detailed design first.
Mine too!Is it slipping or is it being told to slow down, my money is very much on the second.
I do wonder what would happen if you re-ran the design optimisation with more realistic costs.The blame for this catastrophe sits in the original costings, where land costs were underestimated, the amount of work on ground conditions was under estimated, and construction costs under estimated, as the self fulfilling construction industry inflation from a major infrastructure project was never in the budget. Far too much emphasis was on if we get construction costs wrong there is a large contingency.
Which would be genuinely disappointing. Sure, we are in a crisis (both socially and financially), however to get out of said crisis requires motivation and investment. An example of this is the Hoover Dam, which helped save the US from the great depression, and putting it on track to be the economic powerhouse it is today.
How do you propose that we avoid consultants taking the public sector for a ride in future?I do wonder what would happen if you re-ran the design optimisation with more realistic costs.
It seems likely that the entire project plan is junk given the massive and continuous escalations in cost.
The costs of HS2 have risen so far and the benefits fallen so far that the future prosperity of the country would be better served by having the contractors pack up and go home rather than finish the project.
The costs are completely out of control (in common with everything else railway-related) and these cuts are the inevitable result. If the government want to invest in the future of this country, the lessons of the last decade show that rail is absolutely not the way to go.
The IRP talks glibly about having to grade separate HS2-Nottm flows from Nottm-Derby flows, but I don't think that's practical within the existing Trent triangle, without severing the low-level connection to Toton.If the Eastern arm is reinstated then hopefully a spur onto the Nottingham line will be included so that such a service could run in the future.
How do you propose that we avoid consultants taking the public sector for a ride in future?
The costs of HS2 have risen so far and the benefits fallen so far that the future prosperity of the country would be better served by having the contractors pack up and go home rather than finish the project.
The costs are completely out of control (in common with everything else railway-related) and these cuts are the inevitable result. If the government want to invest in the future of this country, the lessons of the last decade show that rail is absolutely not the way to go.
Except that when the bidding for HS2 happened, we had a better BCR. Now that BCR has evaporated, and the consultants are asking for further funding. I'll ask again - how can you avoid it?When the question is we want to do this project, give us the costs and the benefits that give a Cost Benefit Ratio of greater than 2, and skilfully avoid any consultants who will give an answer less, its as more of a political problem, than one of contractors taking the UK for a ride.
Based on Phase 1, I really doubt that.Phase 2a already has royal accent and some contracts already given out. I'm sure 18 months to begin construction is possible of there was the political will for that section.
Because they know the damage is done for the next election, so may as well get the pain over in one big go and move on.I can understand the logic of slowing down expenditure that might happen in the next 5 years, if cash is tight (which it is).
But surely the main expenditure for the remains of the eastern leg is way in the future anyway, so why make politically damaging decisions now which don't have to be made?
But surely bad news will just cost them votes and make it even less likely they'll win again?Because they know the damage is done for the next election, so may as well get the pain over in one big go and move on.
No, people have short memories.But surely bad news will just cost them votes and make it even less likely they'll win again?
Because they can then accuse Labour of being financially irresponsible by spending lots of money on a vastly expensive boondoggle the country neither needs nor can afford. (And yes, they will conveniently forget everything they've said before on the issue to score a point. They've done it so many times before.)Why make unpopular decisions now instead of leaving them to the next government, especially if it's Labour?
I doubt voters in the East Midlands would forget if the link to East Midlands Parkway was cancelled or seriously delayed before the election. Lots of Tory seats around thereNo, people have short memories.