Jammy Dodger
Member
More reporting is coming out of the Telegraph, saying that services may be cut from 18tph to 10tph, and line speeds may be reduced
HS2 train services to be almost halved under proposal to cut costs
Measures to rein in spending include fewer trains and slower speeds
The number of trains running on HS2 will be almost halved and services will travel more slowly in a proposed shake-up of the £72bn line as ministers scramble to save money.
Whitehall officials are considering reducing the number of trains from 18 to 10 an hour, insiders said.
Meanwhile, plans to run services at up to 360 km/h (224 mph) are in jeopardy as officials weigh whether to reduce maximum speeds.
The proposals are among a series of cost-cutting measures under discussion as part of an overhaul codenamed Project Silverlight and Operation Blue Diamond, as ministers grapple with huge inflationary pressures on Britain’s biggest infrastructure project.
The Department for Transport on Tuesday refused to rule out reducing the frequency and speed of HS2 trains.
A spokesman said: “We do not comment on speculation. Spades are already in the ground on the HS2 programme. It will better connect regions across the UK, provide a greener option of travel and is supporting tens of thousands of jobs.
“We remain committed to delivering the project from Euston to Manchester and continue to work in line with the Integrated Rail Plan.”
It came as the Transport Secretary Mark Harper criticised Labour’s plan to nationalise the railways, describing it as a “soggy sandwich wrapped in a clingfilm of backward thinking”.