Is there any evidence that states Lime Street can not accommodate an 11 car Pendolino, or are people making educated guesses?
I use the station many times a week and platforms 7 and 8 would be long enough, with the signals moved a few meters further back.
Above is a picture of a Pendolino in platform seven, with platform eight being the opposite face of the island. The cab is ever so slightly under the bridge (car park). Even if the train was right to the tip of the platform (and there are no passenger doors at the front anyway), it would not be fouling any pointwork
Can we propose ordering a new set of Locos to haul Pendos in case of diversion / on services to Chester / Holyhead. (I know this isnt real but aren't the 57s getting on a bit or is that just me)
It's amazing that people keep on talking about it so much when every official publication over the last few years has explained that there are much better things to do with the stock...
Waste of money.
They barely use the 57s as it is...
Ok... My thoughts.
- Upgrade the Birmingham-Scotland service to Pendolino.
- Transfer the Manchester-Scotland services back to West Coast, using Voyager Stock released from the Pendolinofication.
- Extend the Manchester-Edinburgh* services to the home of Stagecoach (via Stirling).
*This could alternatively be done via Glasgow Queen Street using the Cowlairs Chord but might be confusing.
I agree with the above. But let's see an additional Pendolino order to cover the Manchester-Scotland services once the wires go up. This releases even more Voyagers in a few years time.
Personally?...What do people hope to see out of the next West Coast Franchise?

So you are going to take the 370 out of the Crewe Heritage Centre then?with the existing 221s/370s being cascaded over to East Coast

Because they have Voyagers for diversions / Holyheads, if we are hiving them away for Pendos between Manchester / Birmingham and Scotland we lose a diesel resource. (in this fantasy world)
That's not what I'd meant to type (Note to self: Don't use number-pad when tired!So you are going to take the 370 out of the Crewe Heritage Centre then?
Add a plus sign between those two phrases, and ye'd get a 700%+ overall increase in speed limits along the WCML...All I seen when I clicked on this thread was "West Coast Franchise" and "Death".
I'm hoping the DfT can rearrange the words and whoever wins it ditches the awful management they inherit![]()
But aren't Pendos limited to 100mph when being dragged? That's a whole 30% reduction in maximum speed...Which when coupled with a longer diversionary route could double or even treble the journey time!But how much will we really need the Voyagers for diversions now, they seem an expensive luxary when you can drag the Pendo's just as well.

But aren't Pendos limited to 100mph when being dragged? That's a whole 30% reduction in maximum speed...Which when coupled with a longer diversionary route could double or even treble the journey time!![]()
I'm not sure XC would be the destination. By the time it's done FGWs remaining HST will be getting quite old and if MML electrification doesn't get done the FGW would be a more suitable destination for services from London to Devon and Cornwall.This releases all of West Coasts Voyagers to Crosscountry.
Manchester to Scotland services reabsorbed into the West Coast franchise. A new fleet of seven carriage Mini-Pendolinos, preferably formed DMRF-PTF-MS-TS-MS-PTS-DMS, built to cover Birmingham-Scotland and Manchester-Scotland. Id settle for a build of four or five carriage Desiros of some description for these runs, which Id consider more likely.

Holyhead to Euston via Birmingham was tried c 1984/85 to save money but the through journey time was too long compared with via Trent Valley.personally I would prefer a Holyhead to London service every 2 hours throughout the day as originally promised rather than the current flight of trains every hour each morning out of Holyhead and then virtually nothing for the rest of the day.
Now I don't know if this would be physically possible, (I'm not an expert) but here goes:
Extend the Coventry-Nuneaton service to Tamworth.
This could decrease congestion at New street.
I don't know what routes/rolling stock would be affected, but it could prove popular.
Feedback please![]()
The signalling wont allow it, even if there were points at tamworth (which there isnt) or bi di signals on the down slow to get back to amington junction (which there isnt) then would require crossing all 4 lines to cross over onto the up slow then cross all 4 lines again at nuneaton, it isnt going to happen!
I would like to see: well, first of all a second train an hour for Liverpool, calling at Nuneaton, Crewe, Runcorn and Liverpool. I would like to see Glasgow go hourly, with the first stop being Preston, then Lancaster, Oxenholme/Penrith, Carlisle and Glasgow. Then I would like to see the rest of the Pendolinos lengthened, its silly only 31 sets are being lengthened. I would like to see a 'mini-Pendolino' order for around 32-35 sets being 5 cars in length to displace all Voyagers to XC, with the extra 12-15 sets (there's only 20 Voyagers at the moment) being used to run a new Lancaster stopping service possibly using the slow lines between Euston-Milton Keynes calling at Watford Junction, Milton Keynes Central, Rugby, Nuneaton, Stafford, Crewe, Wigan North Western, Preston and Lancaster. This would give Nuneaton a fast service to London and another fast-ish one linking in various towns and cities. If there were enough sets from this (I've worked out that this hourly Lancaster service would need around 6 sets, and with current Voyager diagrams standing at 18 this would utilise 24 sets out of 32-35) I would give Manchester-Scotland to Virgin. Use the 57's on the diesel sections for the Chester/Holyhead services, and also extend one Wolverhampton working to Shrewsbury with a 57 hauling the set on. This could form a morning service the next day, with the same for one of the peak-hour Preston terminating Pendolino's being extended to/from Blackpool with a 57. A lot I know, but it doesn't actually require hardly any of infrastructure work, just around 30 mini-Pendolino's and the extension of the others, however I am aware there may be pathing issues. With XC receiving these 221's, 11 could double up single Voyager services to increase capacity, with the other 10 displacing 220's onto Nottingham-Cardiff services, with these 3 car 170's working the 2 car 170 diagrams to Stansted (platform lengths permitting or using SD0) with 9 of these 10 170's being displaced to NXEA, which could then in turn displace the 156's to Northern/EMT, with 5 going to Northern and 4 going to EMT. So with a new order of Pendolino's, your helping out two regional operators who need capacity!![]()
![]()
2. I don't think that all 53 Class 390s need to be extended.
4. Both the West Coast InterCity and East Coast InterCity franchisees need additional 125 mph electric rolling stock now.
Remember the XC franchise does not include management of stations. I'd give the service to FGW.give the New Street - Hereford service to XC
Remember the XC franchise does not include management of stations. I'd give the service to FGW.
It's a bit pointless giving the service to XC and having another TOC manage the stations that they don't actually serve. Worcester is also a long way outside Chilterns. FGW would be a good choice though.Give it to XC, let Chiltern manage up to Malvern/Worcester, and FGW manage the rest