Bletchleyite
Veteran Member
No, it wouldn't be possible. There are a number of structural differences, only one of which is that the cars carrying gensets need to have higher floors than normal.
All 80x have all intermediates with the high floors. It was cheaper to standardise. Only the driving coaches have the "low" floor.
== Doublepost prevention - post automatically merged: ==
Of course manufacturers are likely to play safe and design it to comfortably operate at bit more, so might be a 130-140mph train with a speed limiter anyway.
I don't doubt that if Hitachi win they'll just have bidded 10-car 802s. Indeed, I think what people will bid is fairly obvious - if it's CAF it'll look rather 10-car 397-like but with diesels, if it's Stadler it'll be a 13 or 14-car FLIRT or Giruno derivative (or a hybrid of the two).