Most of the real detail is in books or trade publications, I'm afraid. There is decent coverage in the German Wikipedia article, at least:Does anybody have a link to the detail of the traction systems on originally ICE1 or Class120?
Most of the real detail is in books or trade publications, I'm afraid. There is decent coverage in the German Wikipedia article, at least:Does anybody have a link to the detail of the traction systems on originally ICE1 or Class120?
I take it traffic densities are way up from when GNER did it with the "White Rose" sets?
Thank goodness. I know it's a tired line but I really hate the Azumas, they're so uncomfortable.Ah… so Hitachi are completely uninvolved, for once! Very exciting. Would love to see a brand new Siemens or Alstom unit take to the ECML.
Plus the engineers already have extensive experience of the 91s.This might be an odd question, but if the new fleet would be a microfleet (so not a 80x), then why don't they just stick with the class 91+mark 4? They're not that old, seem to work perfectly fine, and I'd guess the only problem with them is that they're an odd microfleet. So if that isn't fixed anyway, why not just keep them long-term?
I presume you refer to the seats ? That`s not the fault of Azumas but the DFT. If the seats were replaced would you like them then ?Thank goodness. I know it's a tired line but I really hate the Azumas, they're so uncomfortable.
I like the Azumas but I just long for some more variety.Thank goodness. I know it's a tired line but I really hate the Azumas, they're so uncomfortable.
Plus the engineers already have extensive experience of the 91s.
I wonder if procuring something with quicker acceleration would allow improvements to the timetable? Or, if the MK4 sets are being shortened, could the91s be regeared to accelerate slightly quicker whilst maintaining a 125mph top speed?
Shortening was supposedly the means of improving the performance to match 80x stock on AC - that’s how it was explained in the 2016 track access application, which assumed 6 short rakes for Edinburgh fasts:Thank goodness. I know it's a tired line but I really hate the Azumas, they're so uncomfortable.
Plus the engineers already have extensive experience of the 91s.
I wonder if procuring something with quicker acceleration would allow improvements to the timetable? Or, if the MK4 sets are being shortened, could the91s be regeared to accelerate slightly quicker whilst maintaining a 125mph top speed?
If there's no need to regear, then wouldn't it be possible to run a train with two 91s, without the DVT to get the better performance and full length?Shortening was supposedly the means of improving the performance to match 80x stock on AC - that’s how it was explained in the 2016 track access application, which assumed 6 short rakes for Edinburgh fasts:
”A small fleet of 225s will be retained beyond May 2020 for deployment mainly on the fast King’s Cross <> Edinburgh services (six rakes of seven Mark IV coaches). Reducing the formation by two Mark IV coaches will allow the 225s to achieve compatible timings with the 800/1 for limited stop services. ”
Based on that I don’t think they’d be expecting them to be regeared as well?
I don’t know, but I’d be surprised if the power supply would cope with that…If there's no need to regear, then wouldn't it be possible to run a train with two 91s, without the DVT to get the better performance and full length?
You also can’t couple a 91 directly to the end first class Mark 4.I don’t know, but I’d be surprised if the power supply would cope with that…
Why not?You also can’t couple a 91 directly to the end first class Mark 4.
Incompatible couplers, the 91 (or any loco ftm) can only couple to the non-gangwayed outer end of the TSOE vehicle or the nose end of the DVT.Why not?
And when the oldest trains on the network give up the ghost, what then?The last order of new passenger trains for the UK for a long time will likely be the new Tyne & Wear Metro fleet. We could easily be looking at a repeat of the 1990s no new train orders period.
ScotRail are known to be looking at new fleets...The last order of new passenger trains for the UK for a long time will likely be the new Tyne & Wear Metro fleet. We could easily be looking at a repeat of the 1990s no new train orders period.
And when the oldest trains on the network give up the ghost, what then?
The problem then is that there's no guard's accommodation in the set AFAIK. When a MK3 short set was used by Greater Anglia a few years ago, they had to run top-and-tailed 37s with 2x MK3 coach and 1x MK3a DVT, because otherwise there was nowhere for the guard within a 2 coach MK3 set.If there's no need to regear, then wouldn't it be possible to run a train with two 91s, without the DVT to get the better performance and full length?
Incompatible couplers, the 91 (or any loco ftm) can only couple to the non-gangwayed outer end of the TSOE vehicle or the nose end of the DVT.
There aren’t.Are there any TSOEs sitting around as spares? Stick one on each end?![]()
I suspect that they probably would not be built much before about 2025/26, so they would not be into service until 2027. But could be later, if reaction to the new seats in the EMR class 810 by the public is waited to be seen, before ordering any new sets.Out of interest, if more Azuma were ordered (doesn’t have to be same length) what would be the delivery period, assuming they follow on from 807, 810 etc
A SMILE derivate for the UK would be amazing!Stadler could build something good.
Did they bid? My impression was that it was between Hitachi and CAF.Stadler could build something good.
Modern Railways also reported that a Chinese company had also bid, though the name escapes me.Did they bid? My impression was that it was between Hitachi and CAF.
I don’t think that their bid had progressed very far.Modern Railways also reported that a Chinese company had also bid, though the name escapes me.
They did and I regularly used to travel on the 21:00 between Kings Cross and Stevenage.Remember 312m Eurostars did operate on the ECML for several years.
If it was between Hitachi and CAF, but Hitachi is not favoured, then I am presuming it is CAF Civity trains that have won and that we will be seeing 5 - 9 car class 397's being built in Wales? I am also presuming that it will be a BEMU train?Did they bid? My impression was that it was between Hitachi and CAF.
If it was between Hitachi and CAF, but Hitachi is not favoured, then I am presuming it is CAF Civity trains that have won and that we will be seeing 5 - 9 car class 397's being built in Wales? I am also presuming that it will be a BEMU train?
Sybics on the TER200 Alsace services are a similar age too.Off the top of my head a significant portion of the fleet of ICE 1 power cars was built at the same time as the 91s were - but they were far more advanced than the 91s, even back then.
Oh, and most of the TGV Atlantique sets too.
But considering that the intent is there, and the dead hand of the DfT isn't, it still makes your claim that "the last order of new passenger trains for the UK for a long time will likely be the new Tyne & Wear Metro fleet" seem a little bit over-bold, no? Or are you just ruling out the order completely anyway?
CRRC [insert flavour here]?Modern Railways also reported that a Chinese company had also bid, though the name escapes me.