Inthewest

Member
Joined
12 Feb 2020
Messages
93
Location
The West
Making more of what is essentially a small fleet sounds like no bad thing when you think of the future cascading opportunities.
I'm not sure that's really a case point these days.
Seeing as the micro fleet of 360s are gone, 350/2's have a questionable future - trains seem to last as long as they're needed with the operator that runs them these days.

The only trains that are moving around the network seem to be diesels.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,172
Is there any solid news on the new fleet?
I created this thread to find out what was confirmed to be happening. Only lots of people have speculated and now it’s been moved to Speculative Ideas :lol:
Nothing that can be discussed in public yet mate.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,790
Location
Cambridge
Nothing that can be discussed in public yet mate.
Ahh okay, yes we wouldn’t want anyone revealing anything that could get them in bother at work. Good to know things are moving though as the 225s won’t last forever (sadly) :)
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,747
Could anything slightly 'diffrent' be done internally given they will be for specific services?
Perhaps a ‘Yorkshire‘ specification, with Working Class and Alan Bennett class; Chips and mushy peas served by trolley Dorises. (With apologies to Hale and Pace).
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,053
Location
Reston City Centre
Perhaps a ‘Yorkshire‘ specification, with Working Class and Alan Bennett class; Chips and mushy peas served by trolley Dorises. (With apologies to Hale and Pace).

My understanding was that the order was for half a dozen trains, which seems excessive for a service that departs Leeds station and arrives back at Leeds station ten minutes later, because if it’s outside Yorkshire it’s not worth visiting… good to have some spare sets for maintenance though, I guess…
 

LOL The Irony

Established Member
Joined
29 Jul 2017
Messages
5,335
Location
Chinatown, New York
My understanding was that the order was for half a dozen trains, which seems excessive for a service that departs Leeds station and arrives back at Leeds station ten minutes later, because if it’s outside Yorkshire it’s not worth visiting… good to have some spare sets for maintenance though, I guess…
The driver and guard will also close the doors whenever they like, will give the right away whenever it takes their fancy and will depart when they feel like it, because they're t'driver and guard.
 

class26

Member
Joined
4 May 2011
Messages
1,199
Perhaps a ‘Yorkshire‘ specification, with Working Class and Alan Bennett class; Chips and mushy peas served by trolley Dorises. (With apologies to Hale and Pace).
But never going outside Yorkshire as if it`s not Yorkshire "it`s no bl**by good"
 

htafc

Member
Joined
30 Dec 2021
Messages
363
Location
West Yorkshire
This is Captain Boycott speaking. We'll be going as fast as I like, for as long as I bloody like, cause I'm t'driver, right!
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,101
Location
West Wiltshire
DfT has extended the direct award to June 2023, with option to June 2025. The new version 1.5X has the following stock on page 151

Last updated 21 September 2022 - hide all updates
  1. 21 September 2022
    The services agreement dated 24 June 2018 has been updated and extended until June 2023, with an option to extend further to June 2025.


Per the table on page 151, the IC225 sets have new lease following expiry of current ending 30 September to 31 May 2023 (with option to 31 May 2024).

7sets plus 3 spare Cl91 vehicles comprising:
10 x Class 91 63 x Mk.IV
7 x Mk.IV DVT
Spare vehicles:
1 x Mk. IV
1 x Mk. IV DVT

The real interest for this thread is the table on page 153 with the new rolling stock to be ready by December 2025 change date.

10 rolling stock units (comprising any number of vehicles) with a minimum length of 250m with an option for 5 additional such rolling stock units.
No fewer than 490 seats in 2+2 configuration & no fewer than 100 First class seats in 2+1 configuration.

Traction scheme 25Kv OLE Electric Mode and Self-Power Mode
Maximum speed in 25 kV AC OLE mode:  127mph
Maximum speed in Self- Power Mode:  90mph
Reliability: not less than 30,000 MTIN.
Controlled Emission Toilets (CET)
Passenger Information System (PIS)
Automatic Seat Reservation System
Automatic Passenger Counting System
Automatic Selective Door Operation (ASDO)
European Train Control System (ETCS)

replaces all IC225 rolling stock


So there it it between 10 and 15 units, with no less than 590 seats (+ disabled seats) with top speed of 127mph
 
Last edited:

Class 466

Established Member
Joined
5 Mar 2010
Messages
2,133
Location
Atherton, UK
DfT has extended the direct award to June 2023, with option to June 2025. The new version 1.5X has the following stock on page 151




Per the table on page 151, the IC225 sets have new lease following expiry of current ending 30 September to 31 May 2023 (with option to 31 May 2024).



The real interest for this thread is the table on page 153 with the new rolling stock to be ready by December 2025 change date.




So there it it between 10 and 15 units, with no less than 590 seats (+ disabled seats) with top speed of 127mph
Well it'll be something other than a 9 car IET as that is shorter than the specified 'minimum 250m'. I guess there's nothing stopping Hitachi creating a 10 car variant?
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,371
Location
belfast
Does anyone know why it includes the requirement to be able to do 90 mph in self-power mode? Is that slower than the current 80x outside of electrified areas? I thought the new trains were likely to be restricted to the electric network? Do people think a battery option is likely to be offered?

== Doublepost prevention - post automatically merged: ==

Well it'll be something other than a 9 car IET as that is shorter than the specified 'minimum 250m'. I guess there's nothing stopping Hitachi creating a 10 car variant?
a 10 car 80x, a 13-car FLIRT, or whatever siemens, alstom, CAF, or even talgo come up with would all be possible
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,101
Location
West Wiltshire
Does anyone know why it includes the requirement to be able to do 90 mph in self-power mode? Is that slower than the current 80x outside of electrified areas? I thought the new trains were likely to be restricted to the electric network? Do people think a battery option is likely to be offered?
Probably not, but maybe for diversions or some unannounced idea to extend trains to more destinations in Yorkshire or to Aberdeen etc

a 10 car 80x, a 13-car FLIRT, or whatever siemens, alstom, CAF, or even talgo come up with would all be possible

Almost feels like it is a full length equivalent of the train that some cross country workings could do with (not just those operated by XC), the sort of thing that would be ideal for some of the semi-intercity lines, the big secondary routes like Manchester - Cardiff, or Paddington - Worcester, or Euston - Holyhead etc. (and yes I know some other trains are already on order)

If it is just 10-15 trains makes it hard for anyone else to bid as design costs would be hefty, even adapting a European modular design. But if there are possibly spin off of more trains there could be more potential train builders.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,301
If it is just 10-15 trains makes it hard for anyone else to bid as design costs would be hefty, even adapting a European modular design. But if there are possibly spin off of more trains there could be more potential train builders.
As it is it probably reduces the bidders to CAF, Hitachi and Stadler, unless some other companies bid to get their foot in the door.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,371
Location
belfast
As it is it probably reduces the bidders to CAF, Hitachi and Stadler, unless some other companies bid to get their foot in the door.
Stadler might bid as well - FLIRTS can be build up to 200 km/h, and are available as bimode, so could fit the requirements well

Edit: sorry I didn't see you already included stadler!
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,101
Location
West Wiltshire
Stadler might bid as well - FLIRTS can be build up to 200 km/h, and are available as bimode, so could fit the requirements well

Edit: sorry I didn't see you already included stadler!
According to the Stadler website the Flirt 200 is upto 8 cars

That wouldn’t work if these trains have to be minimum 250m long

 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,225
Location
"Marston Vale mafia"
According to the Stadler website the Flirt 200 is upto 8 cars

That wouldn’t work if these trains have to be minimum 250m long

The GA ones (12-car) don't exist, then!

Er, they do. What Stadler did was to effectively build two coupled 6-car half-units to make up each 12-car set (a bit like the original Eurostars), but with a cab at only one end. I forget if they have both pantographs up, but a bus-line down the roof is hardly a difficult job.

They are 236.6m long, so if you wanted 250m you could add one more vehicle, or two if preferred to keep the half sets the same length.

If there's the money, a way can always be found :)

This photo (from Railcolor News) is of the two "end coaches" in the middle of the formation, they aren't articulated and have all the electrical gubbins but no actual cab:

stadler_flirtuk_eastanglia22steffentroendle_Lafenburg20180924.jpg
 

RunRepeat

Member
Joined
13 Jun 2018
Messages
62
The GA ones (12-car) don't exist, then!

Er, they do. What Stadler did was to effectively build two coupled 6-car half-units to make up each 12-car set (a bit like the original Eurostars), but with a cab at only one end. I forget if they have both pantographs up, but a bus-line down the roof is hardly a difficult job.

They are 236.6m long, so if you wanted 250m you could add one more vehicle, or two if preferred to keep the half sets the same length.

If there's the money, a way can always be found :)

This photo (from Railcolor News) is of the two "end coaches" in the middle of the formation, they aren't articulated and have all the electrical gubbins but no actual cab:

stadler_flirtuk_eastanglia22steffentroendle_Lafenburg20180924.jpg
The 12 car FLIRTS operate with just one panto, usually the trailing arm.
 

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,174
Location
West Yorkshire / Birmingham
A few comments about this rolling stock order:

1. Would it not have been possible to fit diesel power packs to the 801s whilst they undergo modifications to remedy the cracking issue, rather than having to procure an entirely new fleet with self-powered capability?

2. This point as well as the third ties into the overall vision of the ECML now that the IRP recommends its substantial upgrade; Could these new trains have been procured to displace as many bi-mode 80Xs (including 80Xs converted into bi-modes as per previous point) as possible to other operators (The one I'm thinking being CrossCountry), not just being a Class 91+MK4 replacement?

3. Why a 127mph top speed? If the vague idea is to fit the entire ECML with in-cab signalling why stop at 127mph? 140mph has been talked a lot as a target top speed for the ECML, but why not go up to 155mph as has been done in other countries where conventional railway lines have been upgraded to this speed?
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
1. Would it not have been possible to fit diesel power packs to the 801s whilst they undergo modifications to remedy the cracking issue, rather than having to procure an entirely new fleet with self-powered capability?
No, it wouldn't be possible. There are a number of structural differences, only one of which is that the cars carrying gensets need to have higher floors than normal.

2. This point as well as the third ties into the overall vision of the ECML now that the IRP recommends its substantial upgrade; Could these new trains have been procured to displace as many bi-mode 80Xs (including 80Xs converted into bi-modes as per previous point) as possible to other operators (The one I'm thinking being CrossCountry), not just being a Class 91+MK4 replacement?
While a noble goal, it would introduce a large amount of extra cost - and I suspect in the DfT's view unnecessarily so.

3. Why a 127mph top speed? If the vague idea is to fit the entire ECML with in-cab signalling why stop at 127mph? 140mph has been talked a lot as a target top speed for the ECML, but why not go up to 155mph as has been done in other countries where conventional railway lines have been upgraded to this speed?
ETCS removes the signal sighting problem that originally capped ECML speeds at 125 mph, yes, but going faster entails a lot more work on the permanent way and at stations too. Not impossible, but another very large pile of money for (if I remember previous discussions correctly) not that much practical benefit.
 

tomuk

Established Member
Joined
15 May 2010
Messages
2,009
No, it wouldn't be possible. There are a number of structural differences, only one of which is that the cars carrying gensets need to have higher floors than normal.
Apart from the height of the floor in the driving cars all the 80x are the same you can fit a generating set to any of them.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,101
Location
West Wiltshire
3. Why a 127mph top speed? If the vague idea is to fit the entire ECML with in-cab signalling why stop at 127mph? 140mph has been talked a lot as a target top speed for the ECML, but why not go up to 155mph as has been done in other countries where conventional railway lines have been upgraded to this speed?

127mph is 204.39km/h
possibly it is mph equivalent of 205km/h that DfT aiming for (127.38mph)

I vaguely remember that ECTS signalling and/or speed limiters only operates in 5km/h steps, and perhaps they wanted to maintain 125mph and thus 200km/h was too slow.

Of course manufacturers are likely to play safe and design it to comfortably operate at bit more, so might be a 130-140mph train with a speed limiter anyway.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,371
Location
belfast
ETCS removes the signal sighting problem that originally capped ECML speeds at 125 mph, yes, but going faster entails a lot more work on the permanent way and at stations too. Not impossible, but another very large pile of money for (if I remember previous discussions correctly) not that much practical benefit.
In my understanding there are some stretches where the ECML could already safely operate at 140-150 mph, if the signalling system supported it. If you wanted to use that on more significant stretches more investment would be needed, but why lock in the rolling stock at less than 140 mph if every order for the ECML since the 91s has supported 140 mph running?

Of course manufacturers are likely to play safe and design it to comfortably operate at bit more, so might be a 130-140mph train with a speed limiter anyway.
We can hope that whatever gets selected is capable of running at 140 mph! Though in the case of Stadler, you would end up in another family for a 140 mph train (the SMILE) instead of the FLIRT, which is 200 km/h max, so I guess we'll see
 